consumers power Company General offices: 1945 West Parnall Road, Jackson, MI 49201 * (517) 788-0550 November 12, 1982 Dennis M Crutchfield, Chief Operating Reactor Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT PROPOSED TECHNICAL SPECIFICATIONS CHANGE REQUEST SECTION 6, ADMINISTRATIVE CONTROLS Attached are three (3) originals and thirty seven (37) conformed copies of a request for a change to the Palisades and Big Rock Point Technical Specifications. The requested changes pertain to Consumers Power Company's proposed, coordinated, company-wide, approach to safety management for the Palisades, Big Rock Point and Midland Plants and supercedes the proposed Technical Specifications submitted July 20, 1982.
The concept of a coordinated, company-wide safety management program was originally presented to the NRC Staff in Bethesda on May 4, 1982 and submitted as a Technical Specifications change request on July 20, 1982. As a result of discussions with your staff on October 20, 1982, revisions to the proposed Technical Specifications have been made and are incorporated in this submittal.
It is important to note, that to be effective, this safety management program must be implemented on a company-wide basis.
NRC approval of this program other than for all Consumers Power Company facilities could I
result in a situation wherein the off-site review requirements differ for each plant. To assist the NRC staff in their review, we have attached a copy of a letter that has been submitted on the Midland Plant docket which summarizes how our proposed plan encompasses the role and philosophy of NUREG-0737 Item I.B.1.2, " Independent Safety Engineering Group," for the Midland Plant.
The Nuclear Activities Plant Organization (NAPO) Palisades staff will meet these proposed Technical Specification requirements by January 1, 1983 with full procedural implementation expected to occur within six months from the date that the amendment is issued by the NRC.
In addition, a formal submittal of Rev 2 of Consumers Power Company's Quality Assurance Program Discription for Operational Nuclear Power Plants (CPC-2A) reflecting the proposed Technical Specifications changes will be made upon NRC approval of this
..TSI182-0001C-NLO2 f.82111802T 021112 (Oh
' PDR ADOCK 05000155 9h P
1 DMCkutchfield, Chief-1 Palisades Plant TS Change Request - Administrative Controls November 12, 1982 Technical Specifications change. A draft of these changes was submitted in our July 20,_1982 letter.
A check in the amount of $2,400.00 ($1,200.00 for each plant) was submitted with our July 20, 1982 letter. Since this submittal supercedes our previous letter no additional fees are being remitted.
0 6 07 lDavidJ 08 ndeWalle Nuclear Licensing Administrator CC Administrator, Region III USNRC NRC Resident Inspector - Palisades NPC Resident Inspector - Big Rock Point 4
TS1182-0001C-NLO2 J
e t
TABLE OF CONTENTS I.
Request for Change to the Palisades Technical Specifications II.
Proposed Palisades Technical Specification Pages III. Request for Change t-the Big Rock Point Technical Specifications IV.
Proposed Big Rock Point Technical Specification Pages V.
Information Copy of Letter Submitting Proposed Midland Technical Specification Pages nu1182-0139bl42-43
.