ML20028A123

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1982
ML20028A123
Person / Time
Site: Palisades 
Issue date: 11/01/1982
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20028A115 List:
References
NUDOCS 8211160446
Download: ML20028A123 (4)


Text

..

I r

s OPERATING DATA REPORT DOCKET NO.

50-255 DATE 11 1 R9 CO)1PLETED BY DAPeterson TELEPHONE (616) 764-8913 OPERATING STATUS b"

1. Unit Name:

Pn14nnhn

2. Reporting Peiiod:

821001-821031

3. Licensed Thermal Power (MWI):

2530 g

811 7

4. Nameplate Rating (Gross MWe):

805

5. Design Electrical Rating (Net MWe):
  • 675
6. Masimum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
  • 679 S. If Chantes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

A;

9. Power Lesel To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions !f Any:

l I

This Month Yr..to Date Cumulatise l

11. Hours in Reporting Period Th5 7296 95.271 f
12. Number Of Hours Reactor Was Critical 696 3735.8 52,459
13. Reactor Resene Shutdown Hours
14. Hours Generator On-Line 687.1 33M_5 h9,53nig
15. Unit Reserve Shutdown Hours 9
16. Gross Thermal Energy Generated (MWH) 1,669,680 7,585,416 98,992,680 529,270 2.380.750 30.608.700
17. Gross Electrical Energy Generated (MWH)
18. Fet Electrical Energy Generated (MWH) 50_0.h33 2,2h2,360 28,755,293 l
19. Unit Sen-ice Factor

,2.2 h5.6 52.0 t

20. Unit Availability Factor 92.2 h5.6 52.0
21. Unit Capacity Factor (Using NDC Net) 105.8 hA h h7_9

+

r.

22. Unit Capacity Factor (Using DER Net) 83.h 1R 9 97.5
23. Unit Forced Outage Rate 7.8 Sh.h 27.9
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each1:
25. If Shut Down At End Of Report Period Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY 4

INITI A L ELECTRICITY COMMERCIA L OPER ATION

  • Based on Condenser Backpressure.

I (9/77) 8211160446 821108

- PDR ADOCK 05000255 PDR 3 R

AVERAGE DAILY UNIT POWER LEVEL s

DOCKET NO.

50-255 Palisades UNIT 9

DATE 11-1-82 COMPLETED BY DAPeterson TEL8EPlfONE (616)T6h-8913 MONTil October 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 753 17 313 754

.I8 753 3

~

757 3

19 755 758 20 756 752 ggg s

750 6

22-763 7

757 763 23 8

733 763 24

" I' 25 570 10 761 26 703 Ir 761 27 Th7 I2 7U 682 28 13 761 29 753 348 34 30 15 761 31' 77h l

80 l

16 t

l INSTRUCTIONS On this format. fist the.nerne daily unit power leselin Mwe. Net for each da> in the reporting month. Compute to the nearest whole megaw.nt.

N/77) l l

t l

I L

UNITSilUTDOWNS AND POWER REDUCI10NS DOCKET NO.

90 ?99

. UNIT NAME h14=a h DATE 11-5-82 REPORTMONTil October 1982 COMPLETED BY DVanDenPere TELEPilONE (61 6) 7614-8913 "i

.! E

..E k Licensee

,E-t h".

Cause & Corrective No.

Date g

3g g

,g g 5 Event u 12

$3 Action in o

jE j gi g Report a t& G H

y' Prevent Recurrence 6

14 821016 F

26.3 A

3 Failed Steam Generator Level InstruneE 15 821025 F

0 A

h EH Leak on turbine intercept valve.

16 821028 F

31.6 G

1 1

Low suction pressure to main feed purp 1

2 3

4 F: Fmeed Reamn:

Method:

Exhibit G Instructions S: Scheduled A l!<inipment Failure (Explain)'

l-Manual for Pseparation of Data n Maintenance of Test 2-Manual Scram.

Entiy Sheets for I.icensee C Refueling 3-Automatic Scram.

Event Report (LERI FilelNURI:G-D. Regulatory Restriction 4-01her (Explain) 01611 E-Operator Training & License Examination F Administrative 5

G Operational linor (lixplain)

Eshibit I - Same Source (9/77)

Il Other (Explain)

o SU! NARY OF OPERATING EXPERIENCE FOR THE MONTH OF OCTOBER 3982 Plant tripped October 16 from failed steam generator level int.trument. Power production resumed October 17 On October 25 a reduction to 30% rated power was necessary to repair an EH line on a turbine intercept valve. Plant was manually tripped October 28 after a control valve was valved in after maintenance without checking it in its proper position resulting in lov suction pressure to main feed pumps. Power production resumed October 30.

.