ML20028A123
| ML20028A123 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/01/1982 |
| From: | Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML20028A115 | List: |
| References | |
| NUDOCS 8211160446 | |
| Download: ML20028A123 (4) | |
Text
..
I r
s OPERATING DATA REPORT DOCKET NO.
50-255 DATE 11 1 R9 CO)1PLETED BY DAPeterson TELEPHONE (616) 764-8913 OPERATING STATUS b"
- 1. Unit Name:
Pn14nnhn
- 2. Reporting Peiiod:
821001-821031
- 3. Licensed Thermal Power (MWI):
2530 g
811 7
- 4. Nameplate Rating (Gross MWe):
805
- 5. Design Electrical Rating (Net MWe):
- 675
- 6. Masimum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 679 S. If Chantes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
A;
- 9. Power Lesel To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions !f Any:
l I
This Month Yr..to Date Cumulatise l
- 11. Hours in Reporting Period Th5 7296 95.271 f
- 12. Number Of Hours Reactor Was Critical 696 3735.8 52,459
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator On-Line 687.1 33M_5 h9,53nig
- 15. Unit Reserve Shutdown Hours 9
- 16. Gross Thermal Energy Generated (MWH) 1,669,680 7,585,416 98,992,680 529,270 2.380.750 30.608.700
- 17. Gross Electrical Energy Generated (MWH)
- 18. Fet Electrical Energy Generated (MWH) 50_0.h33 2,2h2,360 28,755,293 l
- 19. Unit Sen-ice Factor
,2.2 h5.6 52.0 t
- 20. Unit Availability Factor 92.2 h5.6 52.0
- 21. Unit Capacity Factor (Using NDC Net) 105.8 hA h h7_9
+
r.
- 22. Unit Capacity Factor (Using DER Net) 83.h 1R 9 97.5
- 23. Unit Forced Outage Rate 7.8 Sh.h 27.9
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Each1:
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY 4
INITI A L ELECTRICITY COMMERCIA L OPER ATION
- Based on Condenser Backpressure.
I (9/77) 8211160446 821108
AVERAGE DAILY UNIT POWER LEVEL s
DOCKET NO.
50-255 Palisades UNIT 9
DATE 11-1-82 COMPLETED BY DAPeterson TEL8EPlfONE (616)T6h-8913 MONTil October 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 1 753 17 313 754
.I8 753 3
~
757 3
19 755 758 20 756 752 ggg s
750 6
22-763 7
757 763 23 8
733 763 24
" I' 25 570 10 761 26 703 Ir 761 27 Th7 I2 7U 682 28 13 761 29 753 348 34 30 15 761 31' 77h l
80 l
16 t
l INSTRUCTIONS On this format. fist the.nerne daily unit power leselin Mwe. Net for each da> in the reporting month. Compute to the nearest whole megaw.nt.
N/77) l l
t l
I L
UNITSilUTDOWNS AND POWER REDUCI10NS DOCKET NO.
90 ?99
. UNIT NAME h14=a h DATE 11-5-82 REPORTMONTil October 1982 COMPLETED BY DVanDenPere TELEPilONE (61 6) 7614-8913 "i
.! E
..E k Licensee
,E-t h".
Cause & Corrective No.
Date g
3g g
,g g 5 Event u 12
$3 Action in o
jE j gi g Report a t& G H
y' Prevent Recurrence 6
14 821016 F
26.3 A
3 Failed Steam Generator Level InstruneE 15 821025 F
0 A
h EH Leak on turbine intercept valve.
16 821028 F
31.6 G
1 1
Low suction pressure to main feed purp 1
2 3
4 F: Fmeed Reamn:
Method:
Exhibit G Instructions S: Scheduled A l!<inipment Failure (Explain)'
l-Manual for Pseparation of Data n Maintenance of Test 2-Manual Scram.
Entiy Sheets for I.icensee C Refueling 3-Automatic Scram.
Event Report (LERI FilelNURI:G-D. Regulatory Restriction 4-01her (Explain) 01611 E-Operator Training & License Examination F Administrative 5
G Operational linor (lixplain)
Eshibit I - Same Source (9/77)
Il Other (Explain)
o SU! NARY OF OPERATING EXPERIENCE FOR THE MONTH OF OCTOBER 3982 Plant tripped October 16 from failed steam generator level int.trument. Power production resumed October 17 On October 25 a reduction to 30% rated power was necessary to repair an EH line on a turbine intercept valve. Plant was manually tripped October 28 after a control valve was valved in after maintenance without checking it in its proper position resulting in lov suction pressure to main feed pumps. Power production resumed October 30.
.