Informs of Compliance W/Reg Guide 1.146 in Response to 820506 Ltr & Generic Ltr 81-01, Qualification of Insp,Exam, Testing & Audit Personnel. Site Procedures Being Revised to Incorporate Reg Guide 1.58,Positions C.5,6,7,8 & 10
ML20027E808
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/12/1982
From: Dutton D
GEORGIA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.058, RTR-REGGD-01.146, RTR-REGGD-1.058, RTR-REGGD-1.146 GL-81-01, GL-81-1, NUDOCS 8211160199
Download: ML20027E808 (2)


Text

.

Georgia Power Compa..

333 Piedmont Avenue .

Atsnta. Georq a 30308 Teler,none 404 526 7703 Mdng' Accress Pott Othce Box 4545 Attama Georgia 30302 Georgia Power D. E. Duttort Vice Pres cont November 12, 1982 Director of Nuclear Reactor Regulation Attention: Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555

NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT GENERIC LETTER 81-01

Dear Mr. Eisenhut:

In Generic Letter 81-01, " Qualification of Inspection, Examination, and Testing and Audit Personnel", dated May 4,1981, you advised the NRC staff had determined that the intent of Regulatory Guide 1.146 and regulatory positions C.5, 6, 7, 8 and 10 of Regulatory Guide 1.58 should be implemented by plants under construction. In a letter to D. G. Eisenhut from R. E. Conway dated August 24, 1981, we stated that the Vogtle Project is meeting the intent of these positions. In a letter dated May 6, 1982 (Youngblood to Dutton), we were requested to give a clear commitment to comply with Regulatory Position C.5, 6, 7, 8 and 10 of Regulatory Guide 1.58, Revision 1, and Regulatory Guide 1.146 or to give a description of the alternative methods used to comply with 10CFR Part 50, Appendix B, if the guidance of Regulatory Guides 1.58 and 1.146 is not followed.

We comply with Regulatory Guide 1.146 " Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants" dated August,1980.

After a further review of Positions C.5, 6, 7, 8 and 10 of Regulatory Guide 1.58 we conclude that the site still meets the intent of these positions as previously stated but does not comply with some of the details described.

In the absence of these details we fully believe that the present program adequately assures the quality construction of the Vogtle Electric Generating Plant. However, revisions to site procedures to incorporate these details concerning qualification of inspection, examination and testing personnel has started and we will comply with Positions C.5, 6, 7 and 10 of Regulatory

~

8211160199 821112

, PDR ADOCK 05000424

.A PDR

,..O' Mr. Darrell G. Eisenhut November 12, 1982

'Page 2 Guide 1.58. Position C.8, concerning Construction Inspectors who are

' exposed to radiation fields in restricted areas, will be addressed in the FSAR which is. scheduled to be submitted to the NRC in July 1983. These personnel will receive training prior to accessing rer.tricted areas.

Should you have any questions, please inquire, cerely, j Doug Dutton Vice President Generating Plant Projects jb xc: R. E. Conway J. T. Beckham R. H. Pinson R. A. Thomas J. A. Bailey

0. Batum D. O. Foster H. H. Gregory L. T. Gucwa C. W. Hayes M. Malcom G. F. Trowbridge M. Manry W. T. Nickerson P. Rice

,