ML20027E803
| ML20027E803 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/02/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML20027E804 | List: |
| References | |
| NUDOCS 8211160191 | |
| Download: ML20027E803 (2) | |
See also: IR 05000440/1982012
Text
.
.
J
NOV 2
B82
f
G
Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATIN: Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Mr. I. T. Yin
of this office on October 11-12, 1982, of activities at Perry Nuclear Power
Plant, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148
and No. CPPR-149 and to the discussion of our findings with Mr. M. R. Edelman
and others of your staff at the conclusion of the inspection.
,
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
1
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
,
contsins a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
r7
3211160191 821112
PDR ADOCK 05000
jf'l
o
.
.
.
-
..
-.
.
--
.
..
.
.
The Cleveland Electric Illuminating
2
NOV 2
1982
Company
the considerations listed in.10 CFR 2.790(b)(4). The information sought
to be. withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
g
W. S. Little, Chief
Engineering Programs Branch
Enclosure:
Inspection Reports
No. 50-440/82-12(DETP) and
No. 50-441/82-11(DETP)
cc w/ encl:
J. Waldron, Plant Manager
L. Beck, General Supervisor
Licensing and Fuels Management
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Danici D. Wilt, Attorney
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Dapartment of Health
!
!
C
RIII
RIII
RIII
RIII
NY
plTl$
h0 h
gin /np
Dani 1sbn
Konkli
i
10/27/82
jo .gggy
p/p,(kn
/
- t
,
,
!