Safety Evaluation Supporting Design of Diesel Generator Lubrication Mods for Diesel Generators 1C & 2C to Meet License Condition 2.C.(19)(c)
ML20027E781
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/28/1982
From: Gibbons T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20027E780 List:
References
NUDOCS 8211160141
Download: ML20027E781 (2)


Text

'

1 DISTRIBUSION s

Docket File NRC PDR Local PDR OCT 2 81982 ORB 1 File D. Eisenhut 0 ELD E. L. Jordan, IE Docket ib. 50-364 E. Reeves C. Parrish NSIC Mr.

P,. L. Clayton J. M. Taylor, IE Senior Vice President ACRS (10)

Alabama Power Company J. Heltemes Post Office Box 2641 C E, Cowod

  1. 4 z Birmingham, Alabama 35291

Dear Mr. Claytoa:

We have completed our review of the design changes you are making to meet Farley 2 License Condition 2.C.(19)(c). The changes are being made during the first refueling outage on Joseph fi. Farley Unit 2 as you indicated in your letter dated September 21, 1981. This schedule is acceptable.

Design cht.7ges affect the lubricating oil system of diesel generators (DG) 1C and 2C, the Fairbanks-Morse opposed-piston DG's.

Based on our review of your design modifications, we conclude that you have satisfied the license requirements for an adequate lubrication supply to all DG bearings to prevent a dry start when automatically starting these DG's.

Therefore, License Condition 2.C.(19)(c) is considered to be satisfactorily completed. The condition will be deleted from the license in a subsequent routine manner. Our Safety Evaluation is enclosed.

Sincerely,

~# I"alsienedbyg Steven A. Varga, Chief Operating Reactors Branch flo.1 Division of Licensing Enclosure; Safety Evaluation cc w/ enclosure:

See next page C211160141 821028 PDR ADDCK 05000364 P

PDR s

..1cjL.......... ' C C,, a"B

. _. > E,Ree,v,gsg,9,,,,,,,, Var t,,,,,,,

taarm........... oi

'.az...

NRC FORM 318 (10-80) NRCM ONO OFFICIAL RECORD COPY usom an.-m-,eo

' ~

r Mr. F. L. Clayton, Jr.

Alabama Power Ccmpany cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 4

Birmingham, Alabama 35291 j

Ruble A. Thomas, Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800.M Street, N.W.

Washington, D. C.

20036 Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 24-Route 2 Columbia, Alabama 36319 Mr. R. P. Mcdonald Vice President - Nuclear Generation Alabama Power Company P.O. Box 2641 Birmingham, Alabama 35291 1

James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 O

. -