ML20010H383
| ML20010H383 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/21/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8109240405 | |
| Download: ML20010H383 (2) | |
Text
'
Allbam2 Powir Comprny 600 Nort518th Street h]', RID, Post Offica Box 2641 Birmingham, Alibimm 35291 M
'l / 'h
"/
,/ '
Telephone 205 250-1000
\\
g,/
ps b
S
F. L CLAYTON, JR.
g ej gg Senior Vice President A
' > tte sourtnsn electnc system / Sept'ediber 21,1981 Docket Nos. 50-348 50-364 Director of Nuclear Reactor Regulation U. s. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units ' & 2 Turbine Disc Inspection Intervals Gentlemen: In response to your letter dated August 24, 1981, Alabama Power Company will inspect low pressure turbine discs at Farley Units 1 & 2 in accordance with the following criteria: (1) New discs will be inspected before any postulated crack would grow to more than one-half the critical crack size. (2) Discs previous'y inspected and found to be 'ree of cracks or that nave been repaired to eliminate all indications will be reinspected using the same criterion as for new discs, calculating crack growth from the time of the last inspection. (3) Discs operating with known and measured cracks will be reinspected before one-half of time calculated for any crack to grow to one-half of the critical crack size. (4) These inspection schedules may be varied to coincide with scheduled refueling outages. Westing-house recommendations in this regard will be considered in scheduling the inspections. Alabama Power Company will repiace or inspect the Unit 2 low pressure turbine discs as required by license condition 2.C.(19)(d) p prior to resuming power operation following the first refueling. .O \\ i 810;240405 810921' PDR ADOCK 05000348 G PDR
t 1 Joseph M. Farley Nuclear Plant - Units 1 & 2 Turbine Disc Inspection Intervals September 9, 1981 Page 2 Unless specifically requested by the NRC, Alabama Power Company will no longer report the results of the turbine disc inspections nor transmit the disc data sheets to the NRC. Should you have any questions, please advise. Yours truly, i cic layton4 r. J WGW:bs cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford l l l i t i. , _ _ _ _ _ _ _ _ _ _.,,., _ - -, -,... _.. _ -... -.}}