ML20027E739

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-37 Re Class IE Wiring Terminations Crimped W/Less Pressure than Specified. Initially Reported on 820713.Extension for Submittal of Final Rept from 821021 to 821118 Requested
ML20027E739
Person / Time
Site: Palo Verde  
Issue date: 10/28/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22139-GHD, DER-82-37, NUDOCS 8211150669
Download: ML20027E739 (2)


Text

.

Docket Nos. 50-528/529/530 yp.

50.55 (c) Report SECgygj)

Ill?:

IM!GMC4fC GLilESVIKGlas blDfG3YM gg AIM 24Wle 3003 un, p.o,oox 23 6.

_ pgocnix, a nizona.3o 36 October 28, 19R1lpp ANPP-22139-GIID/BSid

,,pc, U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-37 A 50.55(e) Potentially Reportable Deficiency Relating to Class IE Wiring' Terminations Crimped With Less Pressure Than Specified, Due to Lack of Maintenance Program and Traceability For AMP llydraulic Crimp Tools File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between T. Bishop and G. Duckworth on July 13, 1982 (B) ANPP-21591 dated August 10, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A),

and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by October 21, 1982.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 18, 1982, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

\\

CLLt 1 LLL E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/ Gild:db cc:

See Attached Page 2 h8 KO PDR

fk.

U. S. Nuclear Regulatory Commission October 28, 1982 Attention:

Mr. D. M. Sternberg, Chief ANPP-22139-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli i

Lynne Bernabei, Esq.

Harmon & Weiss 1725 "1" Street, NW Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General i

Bataan Memorial Building Santa Fe, New Mexico 87503 1

i i

l

\\

. - -~