Forwards IE Insp Repts 50-424/82-23 & 50-425/82-23 on 820928-1001.No Noncompliance Noted
ML20027E581
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/20/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20027E582 List:
References
NUDOCS 8211150510
Download: ML20027E581 (2)


See also: IR 05000424/1982023

Text

&h'

'

"

2

October 20, 1982

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 45'45

Atlanta, GA 30302

Gentlemen:

Subject: Report Nos. 424/82-23 and 425/82-23

This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge of

this office on September 28 - October 1,1982, of activities authorized by NRC

Construction Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility and to the

discussion of our findings held with Mr. M. H. Googe, Manager of Field Opera-

tions, at the conclusion of the inspection.

Areas exarnined during the inspection and our findings are discussed in the

,

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

(Original signed by JBryant)

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure (See Page 2)

8211150510 821020

~

PDR ADOCK 05000424

'

[Ql

G

PDR

r

o.

s

Georgia Power Company

2

October 20, 1982

Enclosure:

Inspection Report Nos. 424/82-23

and 425/82-23

cc w/ encl:

H. H. Gregory, III, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General Manager

M. Manry, Plant Manager

bec w/ encl:

Document Management Branch

State of Georiga

NRC Resident Inspector

RII,

RII

RII

ld

h

'

/

pWP einsorge:es

lake

ARHerdt

JFRogge

C a ce

10//5/82

/i(/82

10/j {/82

10/g /82

10// /82

q

i