Forwards IE Insp Repts 50-259/82-31,50-260/82-31 & 50-296/82-31 on 820913-17.No Noncompliance Noted
ML20027E561
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/13/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Parris H
Tennessee Valley Authority
Shared Package
ML20027E562 List:
References
NUDOCS 8211150494
Download: ML20027E561 (2)


See also: IR 05000259/1982031

Text

e

.9

A

'

.

o-

0FFICIAL RECORD COPY

OCT 131982

Tennessee Valley Authority

ATTN:

Mr. H. G. Parri s

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject:

Report Nos.Ci0-259/82D,J60/82-31 and 296/82-31

This refers to the routine inspection conducted by Mr. W. E. Cline of this office

on September 13-17, 1982, of activities authorized by NRC License Nos.

DPR-33,

DPR-52 and DPR-68 for the Browns Ferry Nuclear Plant facility and to the discus-

sion of our findings held with Mr. G. T. Jones, Plant Superintendent, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure.will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

I

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

D. M. Verre111, Chief

Projects Branch 1

l

Division of Project and

i

Resident Programs

i

.-

' 8211150494 821013

PDR ADOCK 05000

0

.TEol

.

. ..

,--

b

.

.

Tennessee Valley Authority

2

Enclosure:

Inspection Report Nos. 50-259/82-31, 50-260/82-31

and 50-296/82-31

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

Donald L. Williams, Jr., Supervisor,

Nuclear Licensing Section

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

.

-

-

EPOS:

EPOS

PRP: II

EP S-

PRP:RII

DMVhhEelli

E 1

pm

G Jen ns

RButcher

J to

Y

10/f y 82

10/

2

10//2/82

10/0/82

10/f

82

f7