APPENDIX A 3
~'F0TICE OF VIOLATION Carolina Power & Light Company Docket No. 50-400 Harris Unit.1 License No. CPPR-158 1
w As a result of, the inspection conductea on Juiy 20 - August 20, 1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following violation was identified.
10 CFR 50, Appendix B, Criterion XV as implemented by CP&L PSAR section 1.8.5.15; CP&L Corporate QA Program Section 15.1.3, require that noncon-s forming conditions be identified and' corrected.
~
Contrary to the above, on August 17, 1982, five nonconforming welds were found on seistic I electrical raceway supports that had not been previously identified by CP&L or the material vendar. The vendor welds were found to be undersized on five out of five electrical support items which were inspected. The nonconforming welds were identified on electrical support items rumbered item 6 on the site purchase order H-38378 and required by drawing MPS-B-860.
This is a Severity Level IV Violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tion; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
SEP 0 71982 Date: