ML20027E190
| ML20027E190 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/09/1982 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Ahearne J, Gilinsky V, Palladino N NRC COMMISSION (OCM) |
| Shared Package | |
| ML20027E191 | List: |
| References | |
| AEOD-C206, NUDOCS 8211120219 | |
| Download: ML20027E190 (1) | |
Text
<
DistriEution:/
central H ie AE00 Reading File AE00 Chron File W. Lanning, ROAB NOV 9 1982 K. Seyfrit, ROAB
- r. J. Heltemes, AE00 C. Michelson, AE00 W. Dircks, ED0 ED0 Reading File ME!!0RAllDUtt FOR: Chaiman Palladino J. Roe, DED0 Coxaissioner Gilinsky T. Rehm, TA/ED0 Cox11ssioner Ahearne NRC PDR Comuissioner Roberts Conaissionqr Asselstine FR0ti:
William J. Dircks Executive Director for yperations
SUBJECT:
AE00 REPORT O!1 Tile IllAuYERTEllT LOSS OF REACTOR COOLANT EVEllTS AT TiiE SEQUOYAH !JVCLEAR PLAtlT, UllITS 1 AtlD 2 AE00/C206 Enclosed for your infornation is a copy of the AE00 report on the above subject. This report has been forwarded to ilRR for appropriate action.
The report recommendations concern:
a.
Resolution of Task Interface Agreement 81-15; b.
Reducing the probability of inadvertent opening of single valves 4
retaining the reactor pressure during RHR operation; and c.
Ensuring that procedures and training are available to operators for mitigating a LOCA during RHR operation.
Please let ne or Carlyle 111chelson know should any clarification or further infomation be desired.
(Signed) William J.Dircks Willia:a J. Dircks Executive Director for Operations
Enclosure:
As stated cc w/ enclosure:
OGC SECY ACRS OPE 8211120219 821109 PDR ADOCK 05000327 g
PDR n
R0AR.M......
..C1R0AE..d......Q R M........DzAE0D...k...
EDO..k,E,/'>
omce>
WD,i r,,,k,,,,,,,,,
,,,,C H,g, t,,,mes,,,C,M,1,,c h e,1,,s,o,,n,,
a e
.oR,.- > WL ann.'.n9.i.%.5.s,9,yrm,,,,,,
t 10./h./.s.......W.s.p.aa... 19z..uaz.......tez.i..za2...... 2ez..bs2........
em, OFF1ClAL RECORD COPY usea mi-us-eae nRc FORM 318 (10-80) NRCM 0240