ML20027D945

From kanterella
Jump to navigation Jump to search
Forwards LER 82-097/03L-0
Date released: 02/10/2020 Download: ML20027D945


LER 82-097/03L-0:on 821008,HPCS Pump Declared Inoperable Based on Engineering Review of 821002 Incorrect Valve Lineup.Caused by Insufficient Retesting Following Valve Position Indicator Mod & Failure to Remove Info Tag
ML20027D950
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/05/1982
From: Chenault W
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D950 (4)
Forwards LER 82-097/03L-0
ML20027D944
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/05/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027D944 (1)