OPERATING DATA REPORT
~
DOCKET NO. 50 - 335 DATE.1-3 6. 1981 COMPLETED BY V.T. Chilson TELEPHONE nnsiss7-3824 OPERATING STATUS
- 1. Unit Name:
St. Lucie Unit No.1 Notes - Unit operated at
- 2. Reporting Period:
May,/1981 approximately 100% R.P., ex-2560 ce'pt for load reduction of
- 3. Licensed Thermal Power (MWr):
May.4-5,41981.
- 4. Nameplate Rating (Gross MWe):
850
- 5. Design Electrical Rating (Net MWe):
802
- 6. Maximum Dependable Capacity (Gross MWe):
822
- 7. Maximum Dependable Capacity (Net MWe):
777
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Thiough 7)Since Last Report *.Give Reasons:
n
- 9. Power Level To Which Restricted. If Any (Net MWe):
NONE
- 10. Reasons For Restrictions.lf Any:
t This Month Yr. to Date Cumulatise
~
)
- 11. Ilours in Reporting Period 744.0 3 623.0 38 951.0
- 12. Number Of liours Reactor Was Critical 744.0 3 503.7 31 929.0
- 13. Reactor Resene Shutdown flours 129.5
- 14. } lours Generator On.Line 744.0 3 502.2
,)1 133.3
- 15. Unit Reserve Shutdown flours
-n-39.3
- 16. Gross Thermal Energy Generated (MWil)
C 1 881 12 D 8 891 512
_ 76 139 660 ) A4f
- 17. Gross Electrical Energy Generated (MWil) 611 420 2 914 860 64 721. 72fF l @
- 18. Net Electrical Energy Generated (MWH) 578 491 6 758 04D d3 285 52 0 g g y -
300.0 96.7
/9.9
- 19. Unit Service Factar
- 20. Unit Availability Factor 100.0 96.7 80.0
- 21. Unit Capacity Factor (Using MDC Net) 100.1 98.0 76.9
- 22. Unit Capacity Factor (Using DER Net) 97.0 94.9 74.5
- 23. Una Forced Outage Rate 0.7 5.3 l
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eacht:
Scheduled refueling, maintenance, and inspections - October 4 - December 5,1981.
- 25. If Shut Do.n At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Statu,IPrior io Commercial Operation):
Forecast Achieved stilTIAL CRITICALITY INITIA L ELECTRICITY CO\\1MERCIAL OPER ATION
\\w (9/771 8211100280 810606 PDR ADOCK 05000250 R
~
o OPERATING DATA REPORT
~
DOCKET NO. 50 - 335 DATE Jima 6.
1981 COMPLETED BY V.T'. Chilson i
TELEPHONE (1nsi s s 2-3824 OPERATING STATUS St. Lucie Unit No.1 Notes - Unit operated at
- 1. Unit Name:
- 2. Reporting Period:
May, 1981 approximately 100% R.P.,
ex-2560 ce'pt for load reduction of
- 3. Licensed Thennal Power (MWt).
May 4-5, 1981.
- 4. Nameplate Rating (Gross MWe):
850
- 5. Design Electrical Rating (Net MWe):
802 822
- 6. Maximum Dependable Capr. city (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
777
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Th ugh 7)Since Last Report
- Give Reasons:
NONE
- 9. Power Level TnWhich Restricted. II Any (Net MWe):
- 10. Reasons For Restrictions. lf Any:
1 1,11t,5I2
~
This Month Yr.-to.Date Cumulative II. Hours In Reporting Period 744.0 3 623.0 38 951.0
- 12. Number Of Hours Reactor Was Criti$al 744.0 3 503.7 31 929.0 i 129.5 l
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 744.0 t
3 502.2 31 133.3 e
- 39.3 2 (8191512
- 15. Unit Reserve Shutdown Hours / F7//gl S-
- 16. Gross Thermal Energy Generate!(MWHf 76 139 660 1 l l
- 17. Gross Electrical Energy Generated (MWH) 611 4y0 2 714 860 24 734720 578 491 2 758 042 23 283 +es f.2 8
- 18. Net Electrical Energy Generated (MWH) 100.0 96.7 79.9
- 19. Unit Service Factor 100.0 96.7 80.0
(
- 20. Unit Availability Factor l
- 21. Unit Capacity I'actcr (Using MDC Net) 100.1 98.0 76.9
- 22. Unit Capacity Factor (Using DER Net) 97.0 94.9 74.5 0.7 5.3
- 23. Unit Forced Outage Rate
(
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each t:
l Scheduled refueling, maintenance, and inmeetions - Cetober 4 - December 5.1981.
l l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
N/A
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast <
Achieved INITIAL CRITICA LITY g
INITIA L ELECTRICITY
\\
COMMERCIAL OPER ATION (4/77 )
+
t
e e
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50 - 33'i UNIT NAME St. Lucie Unit tjo,1 DATE _Juna 6. 1981 COMPLETED BY V T-Philann RENRT MONTil MAY. 1981 TELEPHONE finOss9 1R?L w.
E E
.! E 3
yY3 Licensee
,E g h
Cause & Corrective No.
Date h
3g g
,2 g y Event 3, ?
53 Action to H
E j;5g Report :
V) U j'
Prevent Recurrence c5 03 81-05-04 S B 5
N/A HA PIPEXX Load reduction to repair steam leak (E) located in piping between HP turbine and moisture-separator-reheater.
Corrective actions' included repairs by welding.
(Non-nuclear system) k 4*
I 2
3 1
F:Ft(ced Reason:
Method:
Exhibit G Instructions SUScheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Autuinatic Scram.
Event Report iLERI File tNUREG-D-Regulatory Restriction 49tl6H-4Ew W 4Coptinuing 0161)
E Operator Training & License Examination 5-Loqd Raduction F-Administrative G-Operational Error (Explain) 9-Other (Explain)
Exhibit I - Same Souru I'l/77) ll-Other (Explain) n
AVERAGE DAILY UNIT POWER. LEVEL DOCKET NO.
50 - 335 St. Luc.te UNIT finit No. 1 June 6, 1981 DATE COMPLETED BY V.T. Chilson TELEPHONE (305)552-3824 MAY, 1981 MONm DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 789 17 785 785 is 779 2
743 787 39 3
78F 7&&
20 4
5 558 21 788 788 22 789 6
784 -
~
-790 23 7
783 775 24 g
9 780 25 790 788 26 789 10 11 789 27 782 790 28 775 12 789 791 13 29 789 790 3a g4 792 789 3
15 789 NOTE:
Average daily power 16 level greater than 777 MWe due to cooler condenser cooling water.