l UNITED STATES
[
p, NUCLEAR REGULATORY COMMISSION r;
- j WASHINGTON, D. C. 20555
~s.,..../
ALABAMA POWER COMPANY DOCKET NO. 50-36.;
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.19 License No. NPF-8 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Alabama Power Company (the licensee) dated July 26, 1982 and supplemented September 27, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provision of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common
(
defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been sctisfied.
l i
l I
l
~
('"G211090044 821025 DR ADOCK 05000g
. 2.
Accordingly, paragraph 2.C.(19)(b) of Facility Operating License No. NPF-8 is amended to read as follows:
(b) Complete the remaining modifications to the primary and backup circuit protection devices in the containment penetration circuits (which are not completed during the first refueling outage) during the next extended cold shutdown after the first refueling outage, but no later than during the second refueling outage.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUC E REGULATORY C099lISSION
- nu even A. Varga, Ch Operating Reactors B ch #1 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: October 25, 1982 l