OPERATING DATA REPORT DOCKET NO.
50-144 DATE 1-5-82 COMPLETED BY W. O. Nicholson TELEPHONE 503-556-3713
)
~
Ext. 409 OPERATING STATUS
)
Notes Troian Nuclear P1 nnt-
- 1. Unit Name:
Dacambar 10A1
. 2. Reporting Period:
1411
- 3. Licensed Thermal Power'(MWt):
1216
- 4. Nameplate Rating (Gross MWe):
S. Design Electrical Rating (Net MWe): 3130119'
~
- 6. Maximum Dependable Capacity (Gross MWe):
1080
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
' 9. Power Level To Which Restricted,.lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
t
' Ihls Month Yr.-to-Date Cumulative 744 R760 An7mo II. Hours in Reportin~g Period 744 6701.9 29463.2
- 12. Number Of Hours Reactor Was Critical 0
0 2171.8
~
- 13. Reactor Reserve Shutdown Hours 744 6494 6
? nan 9 1
- 14. Hours Generator On-Line 0
0 1seg,7 IS. Unit Reserve Shutdown Hours 2536819 20952094 89518776
- 16. GmssThermal Energy Generated (MWH) 816850 67919ss 9 o16o 471 i
~
- 17. Gross Electrical Energy Generated (MWH) 776081 6423930 27530689
- 18. Net Electrical Energy Generated (MWH) 100.0 74.1 6n o
- 19. Unit Service Factor 100.0 74.1 64.2 l
1
- 20. Unit Availability Factor 96.6 67 o sA.s
)
- 21. Unit Capacity Factor (Using MDC Net) 92.3 64.9 52.1
' 22. Unit Capacity Factor (Using DER Net) 71.p 0.0 A o
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date'.and Duration of Eacht:
Refueling, May 1982, 55 days NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
Forecast
. Achieved
- 26. Units in Test Status IPrior to Commercial Operation):
NA MA INITIAL CRITICALITY NA
\\
NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION g\\
8211040350 820107
.N PDR ADOCK 05000344 r
PDR R
\\
=
AVERAGE DAILY UNIT POWER LEVEL 50-344 DOCKET NO.
UNIT Trojan DATE 1-5-82 W. O. Nicholson COMPLEI1ED BY TELEPHONE 503-556-3713 Ext. 409 December 1981 MONT11 DAY AVERAGE DAILY POWER LEVEL D'AY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) g 1041 37 1044 2'
1043 Ig 1043 3
1046 39 1043 4
1041 20 1049 5
1034 21 1047
' 1046 6
1038 22 1
1040 1048 7
23 1044 3
1042 24 9
1040 25 1045 10 1041 26 1047 1048-1040 27 gg 1046 28 1044 12 l
1045 29 1044 33 1043 1039
^
g4 30 1038 1043 15 3g 1043 16 INSTRUCTIONS On this formstolist the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megswatt.
6 5
(907) k.
I u.-
A
~
o
~
2
?
Da mm w
W?
F-E2 1
E. 8-o'Z.
e Q
G m
E t4 I
= c n m o o to > m Tm 6 6:5 6:ia k irh a 5 ~A f'A A " E.i c 2 2 - c c & =q ?.
Durstion "m' $ 5 "- 5' S 3
- 5. g U,44,, e age (Hours)
-c E. m 7 "-. M,, ?
= ::
ELQ
- e. =
".c.:
- e=s.
-4 c Reason $
2 3-a 5-
~~
m x
c m
g g3 M
g 2--
Method of e
Shutting 2
s X.
,8.,,,
w 3
T.
Down Resetor q
~
m
=
L-C m
3 m
-4 E-M r=
o o,
E-amm o
138 A
5
-s.
2Eg w
2 n."
o 2
2
- d c
d N
m o
~
Iystem o
D >r*Y -- E Csde4 m
m 7 - n o,n
-e.E E.
a p
xm z
B a._ e 8.
2e e
's m
E. -
o mE
~'
4EY Component' C
Code ~
b 3
[$3 o
2 5
m n
w a
o Mk C U
2k m
ommpm r
a>g e
E
~#E-E m
m M
=.
_ m - m =:.
n Qq H
~~
W ME ~
gc>
U>g>2Q e
x-e q
=m n3 :
O
] T" O 2
ET zmHZ i
21' I
g-2 m<mm.
l
-m ) 5*
= = = -
3 l
Y x c. li n a
.C, a e
rt W u o e
m l'
.p.U-I O l
a W
p n
V
@ p l
q $. E h w
n a c.
n o m z rg o
i W
2 w"
C 3
W d A
3 h
3 e
- 4
I*
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: '50-344 DATE:
1-5-82 COMPLETED BY:
W. O. Nicholson TELEPHONE:
503-556-3713 Ext. 409 OPERATION The plant operated at or near 100% throughout the month of December.
On December 1, 1981, preferred instrument bus Y 24 failed due to the loss of its associated static inverter Y 28.
Power to Y 24 was switched from the inverter to instrument bus Y O2 with no effect on plant operation.
The inverter has been reenergized on a test load bank to determine the cause of the failure.
The Steam Generator primary-to-secondary leak rate increased over the month from 0.2 gallons per day to about 13 gallons per day. Most of the leakage appears to be from "B" Steam Generator.
The Reactor Coolant System gross gamma activity increased slightly during the month from about 25 pCi/ml to about 29 pCi/ml.
MAJOR SAFETY RELATED MAINTENANCE Completed semi-annual maintenance on the west emergency diesel generator.
t Replaced mechanical seal on the north boron injection tank recire pump.
Completed modification adding additional valves to the Containment post-accident Hydrogen Analysis System.
MISCELLANEOUS MAINTENANCE Worked throughout the month attempting to repair failed static inverter Y 28.
Replaced mechanical seal on the south boric acid transfer pump.
Completed semilannual maintenance on the Joy Air compressors.
Completed annual maintenance on the startup boiler.
LICENSE CHANGES (Effective November 24, 1981)
Amendment 68 - reduces the trip setpoint for high containment pressure as specified in NUREG-0737 " Clarification of TMI Action Plan Requirements".
Amendment 69 - revises requirements for the Fire Protection System.
's
.