ML20027D445

From kanterella
Jump to navigation Jump to search
Response to Aslab 821026 Order Requesting Info on RCS Leak Rate Detection.Util Preparing Tech Spec to Limit Increase in Unidentified RCS Leakage to 2 Gpm within 4-h Period
Date released: 02/10/2020 Download: ML20027D445


Affidavit of Wj Rhoades Correcting Response to Hearing Question on Leak Rates.Leak Rate Sys Capable of Detecting 1 Gpm Per Hour.Tech Specs Will Require Shutdown for Unidentified Leakage of 5 Gpm.Certificate of Svc Encl
ML20027D447
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/01/1982
From: Rhoades W
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML20027D447 (7)
Response to Aslab 821026 Order Requesting Info on RCS Leak Rate Detection.Util Preparing Tech Spec to Limit Increase in Unidentified RCS Leakage to 2 Gpm within 4-h Period
ML20027D444
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/02/1982
From: Silberg J
ALLEGHENY ELECTRIC COOPERATIVE, INC., PENNSYLVANIA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
References
Download: ML20027D444 (4)