Forwards IE Insp Repts 50-282/82-16 & 50-306/82-16 on 820901-17 & Notice of Violation
ML20027D004
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/13/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20027D006 List:
References
NUDOCS 8210280164
Download: ML20027D004 (2)


See also: IR 05000282/1982016

Text

-

OCT 131982

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

NITN:

Mr. C. E. Larson

Director of Nuclear

Generation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

This refers to the routine safety inspection conducted by Mr. N. E. DuBry

of this office on September 1-17, 1982, of activities at the Prairie Island

Nuclear Generating Plant, Units 1 and 2, authorized by NRC Operating Licenses

No. DPR-42 and No. DPR-60 and to the discussion of our findings with Mr. Watz1

and other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

t

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25) days

from the date of this letter a written application to this office to withhold

such information.

If your receipt of this letter has been delayed such that

less than seven (7) days are available for your review, please notify this

_

office promptly so that a new duc date may be established. Consistent with

l

Section 2.790(b)(1), any such application must be accompanied by an affidavit

!

'

8210280164 821013

g

PDR ADOCK 05000282

G

PDR

f5

o

Northern States Power Company

2

executed by the owner of the information which identifies the document or part

sought to be withheld, and which contains a full statement of the reasons which

are the bases for the claim that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, a ccpy of this letter, the enclosures, and your

response to this letter will be placed in the Public Document Room. _

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original signed by J. F. Streeter

J. F. Streeter, Chief

Projects Branch 2

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Reports

,

l

No. 50-282/82-16(DPRP)

and No. 50-306/82-16(DPRP)

1

i

cc w/encls:

i

E. L. Watzl, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Prairie

Island

Resident Inspector, RIII Monticello

John W. Ferman, Ph.D.,

Nuclear Engineer, MPCA

l

t

RII

RIII

s/sv

G

tr

,

/6/82

lCpj;t_

l

>