ML20027D004
| ML20027D004 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 10/13/1982 |
| From: | Streeter J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Larson C NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20027D006 | List: |
| References | |
| NUDOCS 8210280164 | |
| Download: ML20027D004 (2) | |
See also: IR 05000282/1982016
Text
-
OCT 131982
Docket No. 50-282
Docket No. 50-306
Northern States Power Company
NITN:
Mr. C. E. Larson
Director of Nuclear
Generation
414 Nicollet Mall
Minneapolis, MN 55401
Gentlemen:
This refers to the routine safety inspection conducted by Mr. N. E. DuBry
of this office on September 1-17, 1982, of activities at the Prairie Island
Nuclear Generating Plant, Units 1 and 2, authorized by NRC Operating Licenses
No. DPR-42 and No. DPR-60 and to the discussion of our findings with Mr. Watz1
and other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
t
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25) days
from the date of this letter a written application to this office to withhold
such information.
If your receipt of this letter has been delayed such that
less than seven (7) days are available for your review, please notify this
_
office promptly so that a new duc date may be established. Consistent with
l
Section 2.790(b)(1), any such application must be accompanied by an affidavit
!
'
8210280164 821013
g
PDR ADOCK 05000282
G
f5
o
Northern States Power Company
2
executed by the owner of the information which identifies the document or part
sought to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, a ccpy of this letter, the enclosures, and your
response to this letter will be placed in the Public Document Room. _
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original signed by J. F. Streeter
J. F. Streeter, Chief
Projects Branch 2
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
,
l
No. 50-282/82-16(DPRP)
and No. 50-306/82-16(DPRP)
1
i
cc w/encls:
i
E. L. Watzl, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Prairie
Island
Resident Inspector, RIII Monticello
John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA
l
t
RII
RIII
s/sv
G
tr
,
/6/82
lCpj;t_
l
>