Forwards IE Insp Rept 50-267/82-19 on 820809-13 & 0830-0903 & Notice of Violation
ML20027C988
Person / Time
Site: Fort Saint Vrain 
Issue date: 10/06/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20027C989 List:
References
NUDOCS 8210280142
Download: ML20027C988 (2)


See also: IR 05000267/1982019

Text

.

.

OCT

6 1982

Docket:

50-267/82-19

Public Service Company of Colorado

ATTN:

0. R. Lee Vice President

Electricfroduction

P. O. Box 840

Denver, Colorado 80201

Gentlemen:

This refers to the inspection conducted by Mr. R. T. Redano of our staff

during the periods of August 9-13 and August 30-September 3, 1982, of

activities authorized by NRC Operating License DPR-34, and to the discussion

of our findings with members of your staff at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Durin this ins ection, it was found that certain of your activities were in

viola ion of NR requirements.

Consequently you are required to respond to

this violation, in writin

inaccordancewii.htheprovisionsof

Section 2.201 of the NRC'g," Rules of Practice," Part 2, Title 10

s

Code of

Federal Regulations.

Your response should be based on the specif

in the Notice of Violation enclosed with this letter.

Inaccordancewith10CFR2.790(a),acopyofthisletterandtheenclosures

will be 11 aced in the NRC Public Document Room unless you notify this office,

by teleplone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such a

requirementsof2.790(b)(1)pplicationmustbeconsistentwiththe

The response directed by this letter and the accompanying Notice is not

subjecttotheclearanceproceduresoftheOfficeofManagementandBudgetas

required by the Paperwork Reduction Action of 1980, PL 96-511.

RPS-A

RPS-Affe

RPB1

DRRP

D/ES

RA/

V

RRedan/sm!'e.TWesterman GMad en

JG

ardo

EJohnson

JC

lins

9/#/82

9/w/82

9h/82

9h

82

19/t/82

j9/ 82

&

}.

J'W!W

I

8210280142 821006

PDR ADOCK 05000267

0

PDR

. _ .

-

-

.

.

OCT

6M

Public Service' Company of

2

Colorado

Should you have any questions concerning this inspection, we will be pleased

.

to discuss them with you.

SinceChhnet sianou fin

EL n MADSE]i97

G. L. Madsen, Chief

ReactorProjectBranch1

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

,

50-267-82-19

cc w/ enc 1s:

D. M. Warembourg, Nuclear Production

Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado 80651

J. Gahm, Quality Assurance

(same address)

bcc to DMB (IE01)

bec distrib. by RIV:

BC

PM

RPB2

Resident Inspectors

AE0D

ELD

TPB

Section Chief

'

IE FILE

NRR/DHFS/0LB

MIS SYSTEM

R. Redano

NRR/DSI/RAB

RES

RIV File

E. Johnson /J. Marshall

LPDR

NRC PDR

RA

C0 STATE DEPT. HEALTH

NSIC

NTIS

l

l

'

.

,

._-

.-

-..

. ~ .

-

_ - - _ -

-