ML20027C707

From kanterella
Jump to navigation Jump to search
Application to Amend License DPR-34,changing Tech Specs Re Inservice Insp & Testing Program Surveillance Requirements
ML20027C707
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/12/1982
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20027C700 List:
References
NUDOCS 8210270113
Download: ML20027C707 (9)


Text

. __ -._ . . ___ . - _ .

4 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of the Facility Operating License)

)

of ) Docket No. 50-267

)

PUBLIC SERVICE COMPANY OF COLORADO )

Application for Amendment to Appendix A of Facility Operating License License No. DPR-34 0F THE PUBLIC SERVICE COMPANY OF COLORADO l FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application for Amendment to Appendix A of Facility Operating License, License No. DPR-34, is submitted for NRC review and approval.

Respectfully submitted, PUBLIC SERVICE COMPANY OF COLORADO t

By S/0. R. Lee

0. R. Lee, Vice President KELLY, STANSFIELD & 0'DONNELL Bryant O'Donnell i Robert E. Thompson Public Service Company Building Denver, Colorado 80202 Attorneys for Applicant B210270113 821015 PDR ADOCK 05000267 P PDR

d

~=(

STATE OF COLORADO )

) ss.

) CITY AND COUNTY OF. DENVER)

, 0. R. Lee, being first duly sworn, deposes and says; That he is Vice President of Electric Production of Public Service Company of Colorado, the Licensee herein; that he has read the foregoing

- Application for Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

S/0. R. Lee

0. R. Lee Subscribed and sworn to before me this l2,TA day of October, 1982.

Witness my hand and official seal.

My commission expires: C,T06 02 7, / 7f 3 .

4w Notary Public ~ /

J ATTACHMENT 1

SUMMARY

OF THE CHANGES TO THE TECHNICAL SPECIFICATIONS f I L

, __. _, - - _ .- . _ _ . - _ , _ , _ . - _ _ _ _ _ _ - . _ _ _ _ . . , ._ _ _ - , . , , , . _ _ _ _ - - . _ _ _ _ . , _- r _ _ _ . , _ _ _ , _, , . - . . - - - - - , . _ . . _ _ _ ,

Attachment 1 Page 1

1. CHANGES BETWEEN PROPOSED PLANT TECHNICAL SPECIFICATIONS AND CUR-RENT TECHNICAL SPECIFICATIONS i.

SR 5.1.2 Reserve Shutdown System Surveillance (Ref. PSC Letter P-80014) a) Added test of the RSS quick disconnect valves and monitoring of ACM valve actuation gas pressure, b) Unchanged c) Unchanged d) Unchanged e) Unchanged f) New requirement for examination of pipe sections which require disassembly and reassembly within the refueling penetrations.

g) New requirement to test the operability of the reserve shut-down system remote controls.

i SR 5.2.1 PCRV and PCRV Penetration Overpressure Protection Surveil-lance (Ref. PSC Letter P-80014) a) PCRV safety valve test frequency modified from each year at shutdown to at each refueling, but not to exceed every five years.

New requirement added for examination of PCRV containment tank closure bolting and for tank leak testing.

b) Modified to stagger PCRV penetration safety valve testing.

c.1) New requirements for instrument testing.

c.2) New requirements for instrument testing assoc:ated with the PCRV overpressure protection system.

c.3) New requirement for instrument testing associated with the PCRV penetration overpressure protection system snutoff valves.

i SR 5.2.2 Tendon Corrosion Surveillance (Ref. PSC Letter P-80034) a) Modi fied to reflect that all corrosion protected wire samples are not 15 feet in length.

b) Editorial change.

c) New reouirement for examination of prestressing anchor as-semolies.

t l

l

~ _. ._ - - -. . . _ _ . . ... -.

Attachment 1 Page 2 SR 5.2.3 Tendon Load Cell Surveillance (Ref. PSC Letter P-80034) a) Requirement for load cell reference check unchanged.

b) New requirement added for testing the load cell alarm cir-i cuit.

SR 5.2.4 PCRV Concrete Structure Surveillance (Ref. PSC Letter P-80034) a) Crack pattern mapping requirement unchanged.

1 b) Added a new requirement for PCRV deformation and deflection i monitoring, originally required for design verification in i the FSAR.

} c) New requirement for visual examination of the PCRV support structure.

SR 5.2.5 Liner Specimen Surveillance (Ref. PSC Letter P-80034) a) Basic requirement unmodified.

b) Specimen removal frequency changed from calendar years to refueling cycles.

4, SR 5.2.16 PCRV Closure Leakage Surveillance (Ref. PSC Letter P-80014) a) Frequency of PCRV primary and secondary closure leckage testing modified from monthly to quarterly, and from after an increase in pressurization gas flow to after an unantici-pated increase in pressurization gas flow.

b) Unchanged j, '

c) New requirement for testing of core support floor and sup-port column pressure monitoring instruments.

4 d) New requirement for testing isolation valves associated with pressurizing, purging, and venting PCRV closures, e) New requirement for testing check valves in HTFA purge lines.

f) New requirement for testing check valves in HTFA or i refueling penetrations.

1 y -. -- ,.e-- . . - - -- m . _ , ,c- - ., , . . _ _ - . . - . . . . , . , . . . - . . - - ,..- -_--, -,

Attachment 1 Page 3 SR 5.2.17 Helium Circulator Pelton Wheels Surveillance (Ref. PSC Letter P-80064)

Deleted SR 5.2.18 Helium Circulator Surveillance (Ref. PSC Letter P-80064 and P-82430) a) Modified examination reauirements for helium circulators, after the first examination.

SR 5.2.22 PGX Graphite Surveillance (Ref. PSC Letter P-80034) a) Editorial change to reflect that destructive techniques are used to examine the graphite specimens.

SR 5.2.25 Core Support Block Surveillance ,

(Ref. PSC Letter P-80034)

New Technical Specification.

SR 5.2.26 Region Constraint Devices Surveillance (Ref. PSC Letter P-80034)

New Technical Specification.

SR 5.2.27 Helium Shutoff Valve Surveillance (Ref. PSC Letter P-80064)

New Technical Specification.

SR 5.2.28 PCRV Penetrations and Closures (Ref. PSC Letter P-82431)

- New Technical Soecification, t

Attachment 1 Page 4 SR 5.3.1 Steam / Water Dump System Surveillance (Ref. PSC Letter P-80064) a) Modified frequency for steam / water dump tank level indi-cators functional test from monthly to quarterly.

b) New requirements added for testing tank pressure and temp-erature instruments.

SR 5.3.2 Main and Hot Reheat Steam Stop Check Valves Surveillance (Ref. PSC Letter P-80064) a) Partial stroke testing of valve remained unmodified.

b) Full stroke testing deleted from SR 5.3.2 since it is already specified in SR 5.3.4.

SR 5.3.3 Bypass and Pressure Relief Valves Surveillance (Ref. PSC Letter P-80064) a) Testing of n.ain steam bypass valves deleted from SR 5.3.3 since it is already specified in SR 5.3.4.

b) SR 5.3.3 is otherwise unmodified.

SR 5.3.4 Safe Shutdown Coolina Valves Surveillance (Ref. PSC Letter P-80064) a) Testing frequency modified from twice annually to annually.

b) New requirement added for testing normally closed check valves required to open for actuation of the safe shutdown cooling mode of plant operation.

c) Individual valve testing requirements are further detailed in the Basis for SR 5.3.4.

SR 5.3.9 Safety Valves Surveillance (Ref. PSC Letter P-80064)

New Technical Specification.

Attachcent 1 Page 5 SR 5.3.10 Secondary Coolant System Instrumentation Surveillance (Ref. PSC Letter P-80064)

New Technical Specification.

SR 5.3.11 Steam Generator Bimetallic Weld Surveillance (Ref. PSC Letter P-82430)

New Technical Specification.

u_

Attachment 1 Page 6

2. CHANGES BETWEEN PROPOSED PLANT TECHNICAL SPECIFICATIONS AND DRAFT TECHNICAL SPECIFICATIONS INCLUDED IN PSC PRELIMINARY SUBMITTALS a) Various Technical Specifications have been modified compared to the preliminary Public Service Company draft submittal in order to clarify the specified frequency of examinations and tests. The original intent, however, is preserved. This applies to: SR 5.1.2.g, SR 5.2.1.a and c, SR 5.2.2.a and c, SR 5.2.4.b and c, SR 5.2.5, SR 5.2.14, SR 5.2.16.d and e, SR 5.2.18.b, SR 5.2.26, and SR 5.3.9.

b) SR 5.2.1.6 has been modified to specify more accurately the surveillance requirements for PCRV penetration overpressure protection rupture discs.

c) Valve testing specified in SR 5.2.1.c.2 of the preliminary submittal has been deleted from this Technical Specification, since it is already covered in the scope of SR 5.2.16.

d) The requirement for testing and calibration of instruments which monitor moisture in the core support floor and columns has been deleted from proposed SR 5.2.16.c since it is not practical to perform without physical plant modifications.

e) The requirement for testing and calibration of reheater strainer pressure crop and circulator protective screen pressure drop have been deleted from proposed SR 5.3.10.c since tnese instruments are currently being removed from the plant bp an approved Change Notice.

k