ML20027C487

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Repts 50-348/82-23 & 50-364/82-22 on 820921-24.No Noncompliance Noted
ML20027C487
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/12/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Mcdonald R
Alabama Power Co
Shared Package
ML20027C488 List:
References
NUDOCS 8210180004
Download: ML20027C487 (2)


See also: IR 05000348/1982023

Text

Dn6

~

-

.

SAFEGUARDS INFORMATION

.

October 12, 1982

.

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

Subject: Report Nos. 50-348/82-23 and 50-364/82-22

This

refers

to

the

routine

safeguards

inspection

conducted. by

Mr. W. W. Stansberry of this office on September 21-24, 1982, of activities

authorized by NRC License Nos. NPF-2 and NPF-8 at Farley Nuclear Plant and to

the discussions of our findings held with Mr. W. G. Hairston, III, Plant

Manager, at the conclusion of the inspection.

Areas examined during this inspection included your physical security program

as implemented under the provisions of Title 10, Code of Federal Regulations,

Part 73, " Physical Protection of Plants and Materials" and the specific

requirements of your approved Security Plan.

Within these areas, the

inspection

consisted

of

selective

examinations

of

procedures

and

representative records, interviews with personnel, performance tests, and

observations by the inspector.

Within the scope of this inspection, no violations or deviations were

disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

The material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by

Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the

material, with the exception of the report cover page which is an inspection

summary, will not be placed in the Public Document Room.

,

Should you have any questions concerning this letter, we will be glad to

'

discuss them with you.

Sincerely,

i

l

(Original signed by DVerrelli)

D. Verrelli, Chief

Nh

NN

Reactor Projects Branch 1

- - -

UPON SEPARATION THIS

.

l

8210180004 821012

Division of Projects and

PACE IS DECONTROLLED-

.

PDR ADOCK 05000348

Resident Programs

\\

G

PDR

l

Enclosure: See Page 2

SAFEGUARDS INFORMATION

d?&, O t'

,

r

-

.

.

SAFEGUARDS INFORMATIOK

Alabama Power Company

2

October 12, 1982

Enclosure:

Inspection Report Nos. 50-348/82-23 and

50-364/82-22 (Safeguards Information)

cc w/ encl:

W. O. Whitt, Executive

Vice President

F. L. Clayton, Jr. ,

Senior Vice President

J. W. McGowan, Manager Safety

-

Audit and Engineering Review

0. D. Kingsley, Jr. , Manager,

Nuclear Engineering and

Technical Services

H. O. Trash, General

Manager-Nuclear Generation

W. G. Ware, Supervisor-Safety

Audit and Engineering Review

W. G. Hariston, III, Manager-

Nuclear Generation Plant Manager

bcc w/ encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bcc w/ Inspection Summary:

Document Management Branch

NRC Resident Inspector

State of Alabama

bec w/o encl:

License Fee Management Branch

.

.

CON

t

    1. sY*se$/

a'O

"$$ *$

yh0S

RI

RI

RII

RI

RII

j

WW nansberry:pw

DRMu'uire

ALGib on

JFRogge

Meernce vEtesa,-

10/ 9 /82

10/g /82

10g82

10/p/82

104yr82

SAFEGUARDS INFORMATION