ML20027C418

From kanterella
Jump to navigation Jump to search
Ack Receipt of 820713 & 0916 Ltrs Re Nonconformances Noted in QA Program Insp Rept 99900289/82-01
ML20027C418
Person / Time
Issue date: 10/08/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dubrow A
BYRON JACKSON PUMP
Shared Package
ML20027C420 List:
References
REF-QA-99900289 NUDOCS 8210150513
Download: ML20027C418 (1)


Text

.

OCT 0 81982 Docket No. 99900289/82-01 Nuclear Valve Division Borg-Warner Corporation ATTN: Mr. A. L. DuBrou President and General Manager 7500 Tyrone Avenue Van Nuys, CA 91409 Gentlemen:

Thank you for your letters of July 13 1982, and September 16, 1982, in 1582,andAugust 31, 1982.

As a response to our letters of June 18,Mr. P. L. Milinazzo during a tele-result of the discussion with your

) hone call on July 20, 1982, we understand that: (1) a systematic check 1as been made of other drawings which were generated in the same manner-asthedrawingidentifiedinthenonconformance;and(2)ameetingwasheld with designers, checkers and project engineers pertaining to checking of drawings and the change control review process.

We have no further questions at this time and will review your corrective action and preventive measures during a future inspection.

Sincerely, v.Ortstr.cl signed DY6 U. P.OTAPOVS" Uldis Potapovs, Chief Vendor Program Branch bec:

NRC:PDR JTCollins EHJohnson RLBangart JAMarshall JWSutton RIV

/

CI:R& CPS SC:R& CPS BC:VPB AD[Vli3 D:ES JWSutton/rf IBarnas UPotapovs RLita

'rt EHJohnson 10/6/82 10/6/82 10g82 10g82 N/5/821

==a w

w P

e h

E PDR