SEP 3 01982
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATIN:
Mr. Cordell b ed
Vice Presid.
Post Office Eox 76'
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. M. Phillips
and Dr. C. Paperiello of this office on August 23-25 and September 3,1982,
of activities at the Quad-Cities Nuclear Generating Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-29 and No. DPR-30, to the manage-
ment meeting conducted at the NRC Region III office between you and your staff
and Mr. J. Hind of this office and others of my staff on September 9,1982,
and to the discussion of our inspection findings with Mr. N. Kalivianakis,
Mr. B. Stephenson, and other members of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
l
course of this inspection.
Based on our September 9, 1982 meeting, we understand that you will
shortly be issuing a directive to all potential Recovery Managers and Station
Directors stating that site evacuation of non-essential personnel will be
1
- -
I
.
- "210150487 82093054
l
QDR ADOCK 05
'
rg,3r
_
.
.
.
.
.
_.
.
Commonwealth Edison Company
2
.
implemented for any Site Area or General Emergency unless unusual conditions
such as severe weather or radiological conditions prohibit evacuation. We
also understand that the exercise scenarios will be improved. Although
formal findings from the Federal Emergency Management Agency (FEMA) are not
currently available, we understand that you are working to correct the
offsite deficiencies identified as part of FEMA's interim findings. Should
-
the formal findings by FEMA identify an inadequate state of preparedness in
offsite preparedness, the provisions of 10 CFR 50.54(s)(2) will be imposed
.
'
in a subsequent letter.
Please submit to this office within 30 days of receipt of this letter a
4
description of actions you plan to take to resolve the problems identified
in Paragraph 5 of the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room. If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
,
be accompanied by an affidavit executed by the owner of the information
l
which identifies the document or part sought to be withheld, and which
i
contains a full statement of the reasons which are the bases for the
!
claim that the information should be withheld from public disclosure.
I
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not ' hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
- ~
.
. - - - - - , , . . - ,
r,m-
~
, _ , . - - ,
m
--4-
-- -.
- - , . . - , - .
.-_ _ . - - - . - , , , - .
.
Commonwealth Edison Company
3
.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Orlginal signed by
James G. KePpler
James G. Keppler
Regional Administrator
Enclosure:
Inspection Reports
No. 50-254/82-14(DEPOS) and
No. 50-265/82-16(DEPOS)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Ed Hackola, Denuty Director
FEMA Region V
Steve Ferris, FEMA Region VII
I
III
RIII
II
R II
RI I
RI
RIII
h(eW/
V
$$
CY
on
Paperiello Walker
wir d
Eapis
Ke[pler
111ps/sv
h
9/28/82
iIk
pilB
!
.
-e,w+~4.
,e w e o g e s.y
-,ew w w w se =,,ws
w o e we ew e g e g sp e v
r e,
eemt
-- - ----
-