Forwards IE Insp Repts 50-518/82-11,50-519/82-10, 50-520/82-11 & 50-521/82-09 on 820816-18,25 & 0910.No Noncompliance Noted
ML20027C339
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 09/20/1982
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Parris H
Tennessee Valley Authority
Shared Package
ML20027C340 List:
References
NUDOCS 8210150318
Download: ML20027C339 (2)


See also: IR 05000518/1982011

Text

_

.

- _-- .

_._ _ _

__.

.

__ ._

._

..

__ ,

'

0FFICIAL RECORD COPY

...

.

r

SEP 2 01982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

J'; ject: Report Nos @ -518/82 h 50-520/82-11, 50-519/82-10 and 50-521/82-09

This refers to the routine inspection conducted by Mr. J. F. Schapker of this

office on August 16-18, 25 - September 10, 1982, of activities authorized by NRC

Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152, CPPR-153 for the

Hartsville facility and to the discussion of our findings held with Mr. W. T.

Quinn, Site Construction Engineer, at the conclusion of the inspection.

This inspection was a comprehensive examination of your management and quality

assurance controls related to licensed activities.

Inspection was conducted in

selected key areas of responsibilty at both the plant site and your corporate

offices. Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and sutmit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

h/

D. M. Verrelli, Chief

Reactor Projects Branch 1

I

Division of Project and

I)

Resident Programs

i

Enclosure:

Inspection Report Nos. 50-518/82-11,

50-520/82-11, 50-519/82-10 and

50-521/82-09

cc w/ encl: see page 2

8210150318 820920

PDR ADOCK 05000518

IOl

,

L

_ _G

PDR

>

.

.

.

SEP 4 01982

Tennessee Valley Authority

2

cc w/ encl:

H. J. Green, Director of Nuclear Power

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief

Nuclear Safety Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

RII

RII

RII

RII

W$

W$

/

'

J S tapker:gr

RCButcher

FSCantrell

MVerrelli

9/26/82

9/24/82

9/2//82

9/p/82

-