ML20027C171

From kanterella
Jump to navigation Jump to search
Forwards IE Investigation Rept 50-461/82-02 on 820105-0303
ML20027C171
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/04/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20027C172 List:
References
NUDOCS 8210130547
Download: ML20027C171 (2)


See also: IR 05000461/1982002

Text

~

- DME

e

o

-

August 4, 1982

_

Docket No. 50-461

Illinois Power Company

A'ITN:

Mr. W. C. Gerstner

Executive Vice President

~

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the investigation conducted by Region III during the

period January 5 to March 3, 1982, at the Clinton Nuclear Power Station,

.,

Clinton, Illinois, of activities authorized by NRC Construction Permit -

No. CPPR-137.

The report setting forth the results of the investigation

is enclosed.

This investigation disclosed thet QC inspectors were intimidated by manage-

ment personnel. As a result, this matter has been referred to the Office

of Inspector and Auditor for review and possible referral to the Department

of Justice.

In addition, the investigation revealed a breakdown of your

quality assurance program as related to electrical construction.

-

^

As part of our review of this matter, an enforcement conference was

held at the Region III Office, Glen Ellyn, Illinois on' April 8, 1982..~

NRC Regional personnel discussed our particular conct(Ens about the

'

investigation findings and informed members of your. staff that escalated

'

_

.

enforcement action is being considered. Correspondence relating to this

_

matter will be provided to you at a later date,-as' appropriate.

In accordance with 10 CFR 2.790(a), a copy of this letter and the-enclosure'

will be placed in the NRC Public Document Room unless you notifyrthis ottice

-

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter. Such application must be consistent with the re-

quirements of 2.790(b)(1).

- ,

,

-/

,

a

.-

s

1

8210130547 820804

m

-

PDR ADOCK 05000461

O

PDR

-

. .

-

.

.

- ,

c

-

g

e

4

Illinois Power Company

2

August 4, 1982

The' responses directed by this letter are not subject to the clearance pro-

cedures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980,JPL 96-511.

-We will gladly discuss any questions you have concerning this investigation.

Sincerely,

James G. Keppler

Regional Administrator

Enclosuro: - Investigation

Report' No. 50-461/82-02

cc w/o enc 1:

< John Craig, IE

_

cc w/ enc 1:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistaat Attorney General

Gary N. Wright, Manager

,

Nuclear Facility Safety

l.

Randall L. Plant, Prairie

Alliance-

!

r

1

,

g

r

i

.

g .. .

I

.

t.

!

I

.

RI

RIII

RI

RII

(

t PUS

4

L

11 s/jp

Schultz

W(eppler

i

j/30/8

g.g.gt

pg

ghlft

n.

.~

. . , . .

m -

.

(

..-

,

_ ,

.

.

.

_.

, . _ .

- -

.

A

.