ML20027B897

From kanterella
Jump to navigation Jump to search
Confirmatory Action Ltr Re Problems in Remedial Soils QC Requalification Program.Actions Include Util 820929 Meeting W/Nrc to Describe Measures to Accelerate Personnel Requalification
ML20027B897
Person / Time
Site: Midland
Issue date: 09/24/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8209300285
Download: ML20027B897 (2)


Text

__

4

\\

CONI.IRMATORY ACTION LETTER k

\\

\\

\\

SEP 2 4 m2 1

\\

Docket No. 50-329

\\

Docket No. 50-330 Consumers Power Company ATTN:

Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 Centlemen:

This letter confirms the telephone discussion on September 24, 1982, between Messrs. Warnick and Shafer of this office and Mr. D. Miller and others of your staff regard.ing the problems in th remedial soils QC requalification program identified by Messrs. Gardner and Landsman.

The purpose of this letter is te document our understanding of the actions you have taken or pl a to take.

As a result of our discussion, we understand that you have initiated or plan to initiate the following actions:

(1) All work on remedial soils has been stopped with the exception of those continuous activities such as maintaining the freeze wall and well pumping.

(2) All examinations related.to remedial soils QC requalification have stopped and all QC personnel previously certified have been decertified.

(3) A retraining program will be established and conducted for all QC personnel who failed and for future failures.

(4) A written examination will be developed for all QC requalification examir.ations. in the area, of remedial soils.

('Q

'i

_ j

...q..

8209300285 820924 PDR ADOCK 05000329 A

PDR IFIRMATORY. WIQN. LEITER ic ronu sis no.so, uncu o24o OFFICIAL RECORD COPY

7 j

k~

  • *if _

~* l A

E

~

CONFIRMATORY ACTION LETTER SRp p 4 g Consumers Power Company i We also understand that you will meet with our staff on September 29, 1982, I

to describe what measures you will establish to accelerate the requalification and certification of the QC personnel involved in the balance of plant quality program.

If our understanding of your actions is not in accordance with the above, pleasa contact this office immediately.

Sincerely, James C. Keppler Regional Administrator cc: DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII The Zionorable Charles Bechhoefer ASLB The Honorable Jerry Harbour, ASLB The Eonorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB Michael Hiller Ronald Callen, Michigan Public Service Commission Myron M. Cherry Barbara StaC ris Mary Sinclair Wendell Marshall Colonel Steve J. Gadler (P.E.)

William Paton, ELD 1nct) RII

)

af

...a...n... c...,.

D.vis Ke

{** b W

9 5.4 a...i.

.h.

d.

.7).7.f.........) f...

""3'8"

  • '""C"o' OFFICIAL RECORD COPY 7_m j**-322ea

.