ML20027B736

From kanterella
Jump to navigation Jump to search
Forwards TMI Program Ofc Weekly Status Rept for Wk of 820815-21
ML20027B736
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/23/1982
From: Barrett L
Office of Nuclear Reactor Regulation
To: Harold Denton, Snyder B
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-82-052, CON-NRC-TMI-82-52 NUDOCS 8209290329
Download: ML20027B736 (6)


Text

DISTRIBUTION TMIP0 HQ r/f TMI SITE - r/f CENTRAL FILE NRC PDR LOCAL PDR Site Operations August 23,1982-File NRC/THI-82-052 MEMORAliDUM FOR:

Harold R. Denton, Director Office of fluclear Reactor Regulation Bernard J. Snyder, Program Director THI Program Office FROM:

Lake H. Barrett, Deputy Program Director TMI Program Office

SUBJECT:

NRC Tl1I PROGRAM 0FFICE WEEKLY STATUS REPORT Enclosed is the status report for the period of August 15 - 21, 1982. Major items included in this report are:

Liquid Effluents EPA and URC Environmental Data Radioactive Material and Radwaste Shipments Submerged Demineralizer System Status EPICOR II Reactor Building Entries EPICOR II Profilter Shipment Public Meetings setsinaGiM l

Lake H. BarTet Lake H. Barrett j

Deputy Program Director

/ </

THI Program Office

,4

Enclosure:

As stated f

l'k

  • "'"h.........

5"""

B209290329 820a23 "4

PDR ADOCK 05000320

+1 o,

R.

~PDR d.....

+

enc ronu sia no-so uncu o24o OFFICIAL RECORD COP _Y

O Harold R. Denton August 23, 1982 Bernard J. Snyder cc w/ encl:

EDO OGC Office Directors Commissioner's Technical Assistants NRR Division Directors NRR A/D's Regional Administrators IE Division Directors TAS EIS TMI Program Office Staff (15)

PHS EPA DOE Projects Br. #2 Chief, DPRP, RI RI Division Directors Public Affairs, RI State Liaison, RI

(

TMIPQ),0yh

.G,K,[an,:j,s,,,J#,iebe,,,,,

,MShanbahy,,,/,Jasang,,y,,,RBe,1]amyb,

,TJ IP,0.,

omer >,TM,IP0p TMIPO TMI MIP0

,(Bp,

[,,,

aa"^='>

^"> 86'2./.82,,,,

8/,,,, /,82,,,,,,,s/ pag.,,,,,,,, a /M 82,,,,,,,,

8 /,N./.82.,,...

. /.. la,.,,,

une ronu 3i.. io..o, unc= ca' OUKML RECORD COW

~

NRC TMI PROGRAM OFFICE WEEKLY STATUS REPORT August 15, 1982 - August:2 b l982

~

Plant Status Core Cooling M' ode:

Heat transfer from the reacter coolant system (RCS) to reactor building ambient."

, Available Core Cooling Modes: Mii.i Degy Heat Removal (MDHR) system.

RCS Pressure Control Mode:

RCS is vented to the reactor building.

Major Parameters (as of 0600, August 20,1982)(approximatevalues)

Average Incore Thennocouples:

126*F Maximum Incore Thennoccuple:

143*F RCS Loop Temperatures:

A-B Hot Leg 107*F 106*F Cold Leg (1) 85'F 84*F (2) 87*F 85*F Pressure:

The reactor coolant system is vented to the reactor building.

Reactor Building:

Temperature:

85'F Pressure:

-0.2 psig Airborne Radionuclide Concentrations:

3 4.7 E-8 uCi/cc H (s,' ample taken 8/10/82)

', b 85 6.2 E-6 uCi/cc Kr j,

(sample taken 8/10/82) 7.9 E-9 uCi/cc particulates (sample taken 8/13/82) 1.

Effluent and Environmental (Radiological) Information Liquid effluents from the TMI site released to the Susquehanna River after processing, were made within the regulatory limits and in accordance with NRC requirements and City of Lancaster Agreement dated February 27, 1980.

During the period August 13, 1982, through August 19, 1982, the effluents contained no detectable radioactivity at,the discharge point and individual effluent sources, which origtnated within Unit 2, contained no dete,ctable radioactivity.

y "r,

D k

2.

Environmental Protection Agency (EPA) Envirumental Data The EPA Middletown Office has not received the environmental Kr-85 analytical results for the samples.which were taken July 31, 1982, through August 19, 1982, from the EPA's-Counting Laboratory at Las Vegas, Nevada. These results will be included in a subsequent report.

No radiation above normally occurring background levels was detected in any of the samples collected from the EPA's air and gamma rate netwcrks during the period from August 11, 1982, through August 19, 1982.

s 3.

NRC Environmental Data Results from NRC monitoring of the environment. around the TMI site were as follows:

The following are the NRC air sample analytical results for the onsite continuous air sampler:

1-131 Cs-137 Sample Period (uti/cc)

(uCi/cc)

HP-332 August 11, 1982 - August 18, 1982

<6.5 E-14

<6.5 E-14, 4.

Licensee Radioactive Material and Radwaste Shipments On August 17, 1982, an EPICOR II prefilter (PF-3) was shipped (to ithe U.S. Department of Energy facility at Battelle Laboratory in Columbus, Ohio.

On August 18, 1982, 90 drums of Units 1 and 2 contaminated laundry were shipped to Interstate Uniform Services, Inc:, New Kensington, Pennsylvania.

Major Activities 1.

Submerged Demineralizer System (SDS).

Replacement of the feed pump has been completed.

SDS processing of batch 33 commenced August 19, 1982 and is scheduled for completion August 26, 1982.

Batch 33 consists of approximately 40,000 gallons of reactor building sump water.

"2.

EPICOR II. The EPICOR system is presently shutdown but it is scheduled

" to be activated on August 22, 1982, S en it will process batch 33 effluent.

In preparation for EPICO.R' activation, liner F37 was removed-from the system and replaced with 1in'er F38.

3.

Rea$torBuildingEntries.

Tworeactorbuiidingentrieswereconducted during the past week (Wednesday, August 1Ef; and Friday, August 20,1982).

Major activities during the entires included: ' water sample extraction from the reactor vessel, continued remote decontamination of the 282 ft.

elevation surfaces, polar crane damage?askessment, and modifications to the personnel lift device (spider shafter).to extend the operating range of the lift from the polar crane to the 305 ft. elevation.

The licensee delayed the operation to Eisconnect all control rod drive

^

leadscrews from the control rods from last week to this week. The delay was to review personnel safety precautions when gas samples taken from the control rod drive assem6TTes +ndicated that certain assemblies contained hydrogen and oxygen gas in combustible concentrations. This review concluded that proper precautions are in effect to insure personnel safety and system integrity. Three to four reactor building entries have been dedicated to the uncoupling operation, which is scheduled to begin August 23, 1982.

5.

EPICOR 11 Prefilter Shipment.

On August 17, 1982, the first of 49 EPICOR 11 Prefilters (PF-3) was shipped from TMI to the Battelle Columbus Laboratories (BCL) in West Jefferson, Ohio.

This 50 cubic foot ion exchange vessel, which was used to process accident generated water from the Unit 2 auxiliary building in 1979, contained approximately 1,800 curies of radioactive material and was shipped in a special type B cask (designed to withstand transportation accidents).

The Department of Energy (DOE) took possession of this waste material at TMI and will conduct research and development at BCL.

The NRC inspected the waste shipping package to ensure conformance with applicable regulations.

The waste shipment arrived safely at BCL on August 18, 1982.

GPUispreparingwastelinerPF-1IorshipmenttotheIdaho atipnal Engineering Laboratory (INEL) on August. 24,1982.

The licensee isl currently monitoring hydrogen gas generation rates to demonstrate that,

the liner will have non-combustible gas mixtures during the waste handling and transport period.

The initial gas sample on PF-1 indicated 3.3% hydrogen, non-detectable oxygen, and 97% nitrogen.

l l

,9.

y e

0

l

/

4_

l

.ce-t

~

Past Meetings i

On Thursday, August 19, 1982, Lake Barrett met with the Concerned Mothers of Middletown to ' view and discuss the TMI Unit 2 Quipk Look I, II, and III video tapes. They expressed their opinion that Unit 1 should not be restarted prior to completion of Unit 2 cleanup.

Future Meetings On Wednesday, September 1,1982, Lake Barrett will meet with the Concerned Mothers of Middletown to discuss the Atomic Safety Licensing Board's decision on the examination cheating as well as Unit 2 cleanup issues.

I 0

't e

g b

a 88 e

e f

.4' b

  • ro 6

I y ap.

~,k e

0

.