MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
c_ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __-______ _
l E
i OPERATING DAT A REPORT DOCKET NO. _50-317 DATE 9/14/82 COMPLETED BY Elaine lotito TELEPHONE (301)787535-OPERATING STATUS
- 1. Ur.i: Name: -Cilvert Cliffs #1 Notes
- 2. Reporting Period: August 1%2
- 3. Licensed Thermal Power (MWt): 2700
- 4. Nameplate Rating (Grms MWe); 918
- 5. Desi;;n Electrical Ratmg INet MWe): 845
- 6. Maximum Dependable Capacity (Gross MWe): 860 (
- 7. Makimum Dependable Capacity (Net MWe): 825
- 8. If Char ;;es Oects in Cap.icity Ratings (1: ems Nunter 3 Through 7) Since Last Report.Gise Reasons:
- 9. Poser Lesel To hhich Hestricted,if Any (Net Mbe):
- 10. Reasons For Restrictions,if Any:
This Month Yr..to Date Ct.mubtive
- 11. ticurs in Reporting Period 744.0 _ 5.831.0 _
64,140.0
- 12. Number Of Hoiirs Reactor Was Critical 600.6 3,798.7 _
50,398.4
- 13. Reacter Resenc Shutdown Hours 0.0 3.1 1,795.5 I4. Hours Genersfor On-Line -
580.8 3,753.0 49,354.7,
- 15. Unit Resene Shutdown flours 0.0 0.0 0.0
- 16. Grors Thermal Energy Generated (MWH) 1,499,914 9,692,290 119,611,768 .
- 17. Gross Electrical Energy Generated IMWill 487,641 3,229, % 1 39,223,958
- 18. Net Electrical Energy Generated (MWHi ^^1 m 1 nsa ca7
- __37.386,0_20
- 19. Unit Senice Factor 78.1 64.4 77.0
- 20. Unit Assitability Factc.r -78.1 64.4 77.0
- 23. Unit Capacity Factor !Using MDC Neti 75.5 64.1 71.9
- 22. Unit C:rpacity f actoi tusing DER Nett 73.7 62.6 69.0
- 23. Unit f orced Outage Rate 12.4 2.4 8.4
- 24. Shutdowns Scheduled 0.cr Nest 6 Montin (Type. Date.snd Duration of Eacht:
- 25. Il Sht Down At End Of Report Period. Estimated Date of Startup:
- 16. Uniss in Test Status (Prior to Commercial Operation). Forecast Achieved INITIA L CRITICAL.lTY INITIA L ELECTRICITY COMMERCIAL OPERATION .
B209210069 820915 PDR ADOCK 05000317 (967)
R pop
~
OPER ATihG DAT A REPORT DOCKET NO. 50-318 DATE 9/14/_82 COMPLETED BYE g lotito TELEPHONE (101) 7874363-OPERATING ST AT US
- 1. Urti: Name: Calvert Cliffs #2 Not'5
- 2. Reportmg Period. August 1982
- 3. Licenwd T hermal Power (3ths): 2.700
- 4. Narneplate Rating (Grus MWer 911
- 5. Desi;;n E!ntrical Rat;ng (Net Mhe): 845
- 6. Maximum Dependable Capacity IGrms MWe): 860
- 7. Maximum Dependatle Capacity (Net MWe): 825
- 8. If Char ges Occur in Cap. city Ratings titems Nunter 3 Through 7) Since Lat Report.Gise Reasons.
- 9. Power Lesello bhich He.fricted. lf Any (Net 4the):
- 10. Reasons For Restnctieru. lf Any:
Thh Month Yr..to-Date Ct.tnalative II. Ilours in Reporting PerioJ 744.0 5,831.0 _
47,495.0
- 12. Number Oi Hours Reactor Was Criticci 684.3 _ 5,450.1 41,081.1
- 13. Reactor Rescne Shutdown Hours 59.7 81.0 795.2 I4. Hours Generator On Line 683.2 5,416.7 40,461.1
- 15. Unit Resene Shutdown flours 0.0 0.0 0.0
- 16. Gross Thermal Ener2y Genciated IMWH) 1,381,140 13,607,575 99,652,131 .
- 17. Cross Electrical Energy Generated IMWill 423,246 _
4,428,985 32,6%,m
~
- 18. Net Electrical Energy Generated (MWH) 397.553 4.236.204 _31,322,015
- 19. t.imt Senice factor 91.8 92.9 85.2
- 20. Unit Assilability Factor 91.8 92.9 85.2
- 21. Unit Capaci 3 Factor IUsing MDC Net, 64.8 88.1 80.6
- 22. Unit Capacity factor IUsing DER Net! 63.2 86.0 78.0
- 23. Unit Forced Outage Rate 8.2 7.1 3.6
- 24. Shutdowns Scheduled 0,er Nes: 6 Monttis (Type. Date.and Duration of Eacht.
_ No. 2 scheduled for refueling, unit gereral inspection & retube condenser fran 10/17/82 until 1/30/83.
l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
lo. Units in Test Status (Prior to Commercial 0peration). Forecast Achined INITIA L CRITICA LITY ,
INITIAL ELECTRICITY COMMERCI AL OPER ATION (4/77)
~ AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-317 UNIT Calvert Cliffs #1 DATE 9/14/82 COMPLETED BY' TELEPflONE (301) 787-5363 MONT!! August 1%2 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) ;ywe. Net)
I 825 g7 290 2
- gg 834 3 835 39 4 639 823 20 5 21 479 6 n -
7 827 461 23 828 Y 8 832 9 826 839' 25 IO 26 11 834 614 27 12 830 28 842 13 805 848 29 14 7
30 IS -
31 846 16 l
l l
INSTRUCTIONS i On this format list the average dady unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) m
9 .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 E'lT Calvert Cliffs #1 DATE 9/14/82 COMPLETED BY Elaine lotito TELEPHONE (301) 787-5363 1
MONTH A - r 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 636 580 37 638 589 2 gg 3 -
634 y9 590 626 607 4
347 633 3
316 639 6 22 581 7 343 23 8 597 _
3 9 579 _
73 10 578 26 477 II 589 y 844 12 28 13 574 616 29 576 627 14 30 15 573 3g 658 579 16 l
INSTRUCTIONS t
On this format. list the average daily unit power level in MWe-Net for each day in the reporting inonth. Compute to the nearest whole megawatt.
(9/77) l i
e
- e- e,e v rT -t w-- -,~'---e- v- - -- - -- - -- - - , - ee
DOCKET NO. 50-317 UNIT S!!UTDOWNS AND POWER REDUCTIONS UNIT NAME Calvert Cliffs si DATE 4/14/82 COMPLETED BY Finino inrten REPORT MONnt Aumist 1982 TELEPHONE (301) 787-5363
. = -
e e. s 5 c ;: h
.2 E s: Licensee g% Cause & Cosrective 9
No. DJ'c k 5? 2s5 Esent ay g Action to
$ jgg Report
- EU j? ' Prevent Recurrence 6
82-04 080482 F 28.5 A 3 WA INSE U Tripped due to an undervoltage spike on reactor bus.
82-05 Obl482 S 80.9 B 1 CB Z222ZZ Repair reactor coolant system leak.
82-06 082182 F 44.9 A 1 XX Ptnp XX Repair leaking upper seal pressure sensing lirx on 12B reactor coolant ptmp.
82-07 082282 r 8.9 C 3 XX ZZZZZZ Tripped on low steam generator level due to loading the nuin turbine tco rapidly.
ll 1 2 3 4 F: Forced Reamn: Method: Exhibit C Instructions 5: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data .
B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C.Refuehng 3-Automatic Scram. Event ReporI (LE R) File (NUREG.
D Regulatory Restriction 4sContinuation 0161) li-Operator Trainir;;& Ucense Examination 5-Load Reduction F-Admuastraine 5 i
G-Operational Er ror (Explam) 9-Other Exhibit I - Same Source (9/77) Ilother (Explain) l
50-318 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS Calvert c11rfs #9 UNIT NAME DATE 9/14/R' COMPLETED BY Elaine Intito RFPORT MONTIf Aumst 1982 TELEPHONE (301) 787 5363 e.
- E e 8 - E "E
- I* 3 Licensee En Eg Cause & Corrective .
N. .. Date h j! k 3$$ Event ($
m0 hO"E Action to 6-3E $ 3
<. 5 =g Report at u
o Prevent Recurrence O
82-08 082382 P 60,8 A 3 10 Pmp XX Tripped due to loss of high pressure oil pressure on #22 stcan generator feed pmp.
Note: No. 2 unit has been reduced to various load levels alnust the entire month due to con-denser tube leaks.
I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S. Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event ReporI (LER) File (NUREG-D-Regulatory Rest iction 4sContinuation 0161) 1:-Operator Training & Uecuse Examination 5-Load Reduction F Admmistrative 5 9-Other Exhibit I - Same Soura G-Operational Error (Explam) 19/77) llother (Explain)
September 3,1982 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. I
- 2. Scheduled date for next Refueling Shutdown: October 1,1983
- 3. Scheduled da for restart following refueling: December 11,1983
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Resumption of operation af ter refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
June 29,1983
- 6. Important licensing considerations associated with the refueling.
Reload fuel will be simi'ar to that reload fuel inserted into the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 656 e
Spent Fuel Pools are common to Units 1 and 2
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core cff load.
April,1991
\
l September 3,1982 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refuehng shutdown: October 15,1982.
- 3. Scheduled date for restart following refueling: January 5,1982
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?
Resumption of operation af ter refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
October 4,1982
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 656 Spent Fuel Poolis common to Units 1 and 2.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
- April,1991 1
(
SlMMRY OF INIT 1 OPERATING EXPZ".IEN - ALGST 1%2 8/1 At the beginning of this reporting period Unit 1 was operating at 835 BWe with the reactor at 977 power conducting variable Tave testing. Inad was increased to capacity (875 FHe) at 2100.
8/4 At 1828 the reactor tripped due to an undervoltage spike on the reactor trip bus. This electrical perturbation m s caused by the opening of the electrical disconnect switch to 13 service m ter ptnp while still energized.
8/5 The reactor was brought critical at 2003 and the unit paralleled at 2302.
8/6 Resuned full load operation (860 FWe) at 1900.
8/14 The unit m s taken off the line at 0107 due to excessive RCS leakage.
8/27 The reactor ms brought critical at 0355 and the unit paralleled at 0959. Ioad was increased to capacity (865 FHe) at 2100.
8/21 The unit was taken off the line at 0130 to repair a leaking upper seal pressure sensing line on 12B Reactor Coolant Ptnp.
8/22 The reactor was brought critical at 1815 and the unit paralleled at 2225. At 2237 the reactor tripped on low steam generator level due to loading the nuin turbine too rapidly.
8/23 The reactor was brought critical at 0100 and the unit paralleled at 0730.
Resumed full load operation (860 FWe) at 2100.
8/31 At the end of this reporting period Unit 1 was operating at 875 FWe with the reactor at 100% power.
s-
+ .
l l
l SUttMRY OF LNIT 2 OPERATING EXPERIDKE - AtX171982 8/1 At the beginning of this reporting period Unit 2 was operating at 680 FWe with the reactor at 80% power while investigating saltwater leakage into the nnin condenser.
I 8/5 Decreased load to 270 FWe at 1200 to alh two circulating water punps to be shutoawn for saltwater leak investigation.
8/7 load was increased to 640 FWe at 0900.
8/8 Decreased load to 550 FWe at 1500 due to increasing circulating water T.
8/9 Increased load to 620 FWe at 0001.
8/20 load was increased to 660 FWe at 2130.
8/23 At 1342 the reactor tripped on low steam generator level due to loss of high pressure oil pressure on 22 steam generator feed pmp. Startup was delayed for repair of leaking reactor hot leg sanple valve.
8/25 h reactor was brought critical at 2120.
8/26 h unit was paralleled at 0230. Load was increased to 660 FWe at 1300.
Continuing to investigate saltwter leakage into the nuin condenser.
8/31 Plugged 328 leaking condenser tubes this month. At the end of this reporting period Unit 2 was opera *.ing at 675 FWe with the reactor at 81*/. power while investigating saltwater leakage into the nnin condenser.