ML20027B370
| ML20027B370 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 09/15/1982 |
| From: | Nelson G, Norderhaug L, Wieder A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML19289B212 | List: |
| References | |
| 70-1257-82-06, 70-1257-82-6, NUDOCS 8209200320 | |
| Download: ML20027B370 (1) | |
Text
'
The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.
U.S. NUCLEAR REGULATORY COMMISSION Region V Report No. 70-1257/82-06 (IE-V-517)
Docket No. 70-1257 License No. SNM-1227 Safeguards Group 1
Licensee:
Exxon Nuclear Comoanv. Inc.
777 106th Avenue Northwest Bellevue. WA 98004 Facility Name:
Exxon Nuclear Fuel Fabrication Facility Inspection at:
Horn Ranids Site. Richland. WA Inspection Conducted: August 2-6 and 9-13. 1982 Date of Last Material Control and Accounting Inspection February 8-12, 1982 Type of Inspection:
>#1 announced. Material Control and Accountina M
<ff/([i(h Inspectors:
a fe e
h(I B'.' helTon, Chemist 94r i
~
(_ ) /
Date Si ned k.A
/4. V. Wieder, Safegeards Auditor f ate / Signed
/
Date Signed
/
v'
./
9[/((82 Approved by:/4. R.]ordefhau'g, Chief uar nch
' 'Date Signed Inspection Summary:
Areas Inspected: Routine safeguards inspection for compliance with applicable regulations pertaining to the control and accounting of special nuclear materials.
Functional areas inspected included independent safeguards inspection effort, measurement and controls, shipper-receiver verification, loss mechanism analysis, ID and LEID verification, SNM export and import verification, internal control and followup on deviation. The inspection involved 73 man-hours on-site by two NRC inspectors.
Results:
No items of noncompliance were identified in the areas inspected.
8209200320 PDR ADOCK 07001257 C