Responds to NRC Re Violations Noted in IE Insp Repts 50-424/82-16 & 50-425/82-16.Corrective Actions:Maint Cards Revised & Returned to Active Insp & Maint Program. Instructions Prepared to Ensure Efficient Revision Control
ML20027B270
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/11/1982
From: Foster D
GEORGIA POWER CO.
To: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20027B258 List:
References
NUDOCS 8209160597
Download: ML20027B270 (2)


Text

F A

,,s

';3Ni20 D.: -.

~

Georgia Power Company Post Office Box 4545 g Mm 13 p g : }h Atlanta, Georgia 30302 Telephone 404 522-6060 Vogtle Project Southem Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 August 11, 1982 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File:

X78G10 Atlanta, Georgia 30303 Log:

GN-109

Reference:

50-424/82-16 50-425/82-16 Attention:

H. C. Dance Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the violations discussed in your inspection report 50-424/82-16 and 50-425/82-16.

We concur with the finding identified concerning failure to perform periodic maintenance of equipment within the specified maintenance period.

The reason for the violation was removal of the maintenance report cards from the active file in order to reformat and revise the card entries.

These cards were held inactive through some of the scheduled maintenance intervals because of the amount of revisions required.

The appropriate maintenance cards for items 2-1604-QS-PS1 and 2-1604-QS-PS4 have been revised and returned to the active inspection and maintenance program.

Desk top instructions have been prepared to ensure that we have more efficient revision control of changes within the inspec-tion and maintenance program. A special quality control inspection was conducted to assess the current condition of this equipment. This inspec-tion identified no adverse findings.

To avoid future violations in this area, we have stopped the practice of " wholesale" retrieval of maintenance report cards from the active program to make card revisions. Cards will be removed from the program on a limited basis and will be returned to the active file prior to any inspection and/or maintenance requirements due date.

Full compliance was achieved on August 6,1982.

8209160597 820017 PDR ADOCK 05000424 PDR G

\\

r kC Dance 50-454/82-16; 50-425/82-16 August 11, 1982 Page 2 This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Yours truly, o

D. O. Foster Project General Manager CWH/D0F/tlp xc:

U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, D. C.

20555 R. J. Kelly R. E. Conway G. F. Head J. T. Beckham, Jr.

J. H. Boykin D. E. Dutton R. H. Pinson D. L. McCrary R. A. Thomas J. A. Bailey

0. Batum H. H. Gregory, III E. D. Groover L. T. Gucwa M. Malcom C. R. Miles, Jr.

M. Manry P. D. Rice R. W. Staffa J. L. Vota W. F. Sanders

. --.