e, a

Dulac POWEH COMIMNY

.c

. STEAM I'ItODUCTION del'T.

GENEllAL OFFICES vgte,. hon E; AREA 704 P. o. sox asses 422 SOUTH CHURCH STREET 373 4ois

,7.,p,g D. bC]IgilLOTTE, N. C. 28242 t

August 17, 1982 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region 11 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Subj ect : McGuire Nuclear Station Docket No. 50-370

Reference:

RII:WHM 50-370/82-10 Dear '*r.

O'Reilly:

In reference to Mr. H. C. Dance's (NRC/OIE) letter of August 5, 1982 which discusses a telecon held between Duke Power Company and hTC/ Region II on July 30, 1982, please find attached the requested supplemental response to Deviation Item A (examples 1 and 2) of IE Inspection Report 50-370/82-10.

We hope that this additional response will clarify any remaining concerns on this item.

Note that although Duke agreed to provide this response by August 13, 1982, it is inadvertantly being submitted two working days late. We re-gret any inconvenience this delay may have caused.

Very truly yours,

[

al B. Tucker, Vice President Nuclear Production PBN/j fw Attachment cc:

Mr. P. R. Bemis Senior Resident Inspector-NRC McGuire Nuclear Station 8209160375 820909 PDR ADOCK 05000370 G

PDR

DUKE POWER COMPANY l

McGUIRE NUCLEAR STATION ADDITIONAL RESPONSE TO IE INSPECTION REPORT 50-370/82-10 Deviation Item A (50-370/82-10-02), Example 1:

Fire Protection system drawings / documents are stamped QA Condition 3 for purposes of controlling signatures and distribution. With the initiation of the QA program, only systems which were negotiated after January 1, 1978 are required to follow the guidelines established in the program (i.e.,

verification of materials, installation, tests, etc.).

Flow diagram drawings include special notes indicating which systems fall into this category.

Con-struction personnel and QC use the flow diagram drawings to verify which systems are to be inspected in accordance with the QA program.

Two examples:

1) The Unit 1 and 2 cable room spray systems (elevation 750+0).

Flow diagram drawings MC-1599-2.1 and MC-2599-2.1 indicate these systems to be " Fire Protection QA required".

2) The Battery Room pipe trench (elev. 733+0).

Flow diagram drawing MC-1599-2.3 indicates this system to be " Fire Protection QA required".

Records will be available to show that inspections were made on systems or portions of systems applicable to the QA program.

Deviation Item A (50-370/82-10-02), Example 2:

As previously stated, fire protection systems are non-seismic and not required for the safe shutdown of the plant. There is a need to seismically analyze non-safety piping systems and to seismically qualify the support / restraint designs of supports to prevent the non-safety piping from affecting the integrity of safety-related components or equipment needed to safely shutdown the unit following a seismic occurrence.

A field study was performed to analyze non-safety piping systems, including fire protection systems, in areas containing safety-related components or equipment and to seismically qualify the supports. This has been completed for McGuire Unit 1 and is in progress for Unit 2 and will be completed by fuel loading.