ML20027B105

From kanterella
Jump to navigation Jump to search
Forwards LER 82-097/03L-0
Date released: 02/10/2020 Download: ML20027B105


LER 82-097/03L-0:on 820812,review of Procedures Revealed That Plant Procedures Did Not Provide for Required Once Per 18-month Visual Insp of Aog Bldg Fire Doors.Caused by Personnel Oversight During Development of PT-35.18.2
ML20027B108
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/09/1982
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027B108 (1)
Forwards LER 82-097/03L-0
ML20027B104
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 09/09/1982
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20027B104 (1)