ML20027A709

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Providing Basis for Request to Perform Short Duration Integrated Leak Test (Type a)
Date released: 02/11/2020 Download: ML20027A709


Forwards Revision 1 to Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants, Providing Basis for Request to Perform Short Duration Integrated Leak Test (Type a)
ML20028B213
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/23/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: ADENSAM E
Office of Nuclear Reactor Regulation
References
Download: ML20028B213 (1)
Rev 1 to Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants.
ML20027A708
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/01/1972
From: Blasingame J, Brown R, Gregory Cranston
BECHTEL GROUP, INC.
To:
References
Download: ML20027A708 (110)