iXS October 4, 1994 Docket Nos. 50-220 50-410 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, N w York 13093
Dear Mr. Sylvia:
SUBJECT:
MOTOR-0PERATED VALVE ISSUES WITH SPECIAL EMPHASIS ON THE PROCESS FOR CLOSING OUT GENERIC LETTER 89-10 I am extending an invitation to Region I licensees to participate with the Office of Nuclear Reactor Regulation (NRR) and Region I representatives in a discussion of Generic Letter (GL) 89-10 motor-operated valve programs.
Special emphasis will be placed on the NRC's expectations for completion of GL 89-10 programs, and on our intended closure process for that Generic letter.
The meeting will be held on Wednesday, October 26, 1994, from 8:00 a.m. to 4:30 p.m., at the Park Ridge Hotel, King of Prussia, Pennsylvania (610-337-1800).
The meeting is open for public observation and will be attended by NRC Region I and NRR staff. We request that you consider sending 2 to 3 members of your staff and management associated with the GL 89-10 program.
To make the meeting as productive as possible, please provide a preliminary list of questions / issues, and indicate who will represent you at the meeting by October 18, 1994. Those questions and issues will form the bases for additional discussions. We also intend to present overviews by both NRC and utility managers, presenting their perspective on GL 89-10 issues.
An agenda for the meeting is attached for your information.
9410130131 941004 PDR ADOCK 05000220 P
'l 0 g
Mr. B. Ralph Sylvia 2
October 4, 1994 Questions regarding the meeting details and feedback on questions and attendess may be directed to Gene Kelly of my staff at (610) 337-5111.
I look forward to our meeting.
Sincerely, i
James T. Wiggins, Director Division of Reactor Safety Attachments:
i
- 1. Meeting Notice
- 2. Agenda cc w/ encl:
L. Storz, Vice President - Nuclear Generation C. Terry, Vice President - Nuclear Engineering M. McCormick, Vice President, Safety Assessment & Support R. Abbott, Unit 1 Plant Manager K. Dahlberg, Unit 2 Plant Manager D. Wolniak, Manager, Licensing (Acting)
J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Energy & Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law K. Abraham, PA0 (30) SALP Reports and (2) All Inspection Reports Public Document Room (PDR) local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York, SLO Designee j
4 i
i
4 Mr. B. Ralph Sylvia 3
October 4, 1994 i
bec w/ encl:
Region I Docket Room (with concurrences)
L. Doerflein, DRP W. Dean, OEDO (WMD)
B. Norris - Nine Mile Point T. Marsh, NRR D. Brinkman, NRR M. Campion, RI DRS Files (2) i DOCUMEN7 NAME: A:NMP
'Io rueive a copy of this docunwnt indicate if the box: *C" = Copy without attachment / enclosure "I'* = Copy with attachment / enclosure
- N" = No copy 0FFICE RI/DRS M'
RI/DRS ld RI/
l RI/
l RI/
l NAME KELLY ///:' /
WIGGINSr V n
DATE 10/04/94 10/d /94 10/
/94 10/
/94 10/
/94 0FFICIAL RECORD COPY
- - ~
U.S. NUCLEAR REGULATORY COMMISSION RI 94-119 REGION I i
NOTICE OF SIGNIFICANT LICENSEE MEETING k
Licensees; Baltimore Gas and Electric, Calvert Cliffs (50-317; 50-318) l Facilities; Boston Edison, Pilgrim (50-293)
Docket Nos.
Connecticut Yankee Atomic Power, Haddam Neck (50-213)
Consolidated Edison, Indian Point 2 (50-247)
Duquesne Light Company, Beaver Valley 1&2 (50-334; 50-412)
GPU Nuclear Corporation, Three Mile Island 1&2 (50-289; 50-320),
Oyster Creek (50-219)
Niagara Mohawk Power Corp, Nine Mile Point 1&2 (50-220; 50-410)
Northeast Nuclear Energy Co., Millstone 1,2&3 (50-245; 50-336; 50-423)
North Atlantic Energy Service Corp., Seabrook (50-443) i PECO Energy, Limerick 1&2 (50-352; 50-353) i Pennsylvania Power & Light, Susquehanna 1&2 (50-387; 50-388)
New York Power Authority, Indian Point 3 (50-286),
J.A. FitzPatrick (50-333) l Public Service Electric & Gas, Salem 1&2 (50-272; 50-311),
i Hope Creek (50-354)
Rochester Gas & Electric, Ginna (50-244) l Vermont Yankee Nuclear Power Corp., Vermont Yankee (50-029)
Time and Date:
Wednesday, October 26, 1994, 8:00 a.m. to 4:30 p.m.
Location:
Park Ridge Hotel King of Prussia, Pennsylvania (610) 337-1800
Purpose:
Discussion of motor-operated valve issues with Region I licensees.
Special emphasis will be placed on the principal technical issues, i
expectations for completion of prograras, and the process for closure of Generic Letter 89-10, " Safety-Related Motor-0perated Valve Testing and Surveillance."
NRC Attendees:
W. Kane, Deputy Regional Administrator J. Wiggins, Director, Division of Reactor Safety (DRS)
~;
R. Wessman, Chief, NRR, Mechanical Engineering Branch (MEB)
E. Kelly, Chief, DRS Systems Section l
T. Scarbrough, Senior Mechanical Engineer, NRR, MEB i
NOTE:
(1)
Attendance by NRC personnel at the NRC/ Licensee meeting should be made known by October 17, 1994, via telephone call to E. Kelly (610) 337-5111.
j (2)
Due to the subject matter and nature of this meeting, this meeting is open for observation by members of the general public.
A Approved By:
[#&v E li. Kp y, Chief Systems ection Divisi n of Reactor S ety
$d / 0/3fL-O / K
/
AGENDA MOTOR-0PERATED VALVE MEETING 26 0CTOBER 1994 8:00 A.M.
Welcome and Opening Remarks by William Kane, Deputy Regional Administrator, NRC Region I 8:15 A.M.
Keynote:
" Expectations for Completion" by James Wiggins, Director, Division of Reactor Safety, NRC Region 1 8:30 A.M.
" Utility Perspective" by James Riedel, MOV Project Manager, Baltimore, Gas & Electric Co. (BG&E) 9:00 A.M.
" Process for Closure and Periodic Verification" by Richard Wessman, Chief, NRR, Mechanical Engineering Branch (MEB) Division of Engineering 9:30-10:30 A.M.
Breakout Sessions 10:30-10:45 A.M.
Break 10:45-11:30 A.M.
Feedback 11:30-1:00 P.M.
Lunch 1:00-1:30 P.M.
" Examples of GL 89-10 Closure" by Thomas Scarbrough, Senior Engineer, NRR, MEB 1:30-2:00 P.M.
" Utility Perspective" by Steven Maginnis, MOV Project Manager, Public Service Electric & Gas Co. (PSE&G) i 2:00-2:15 P.M.
Break
~
i 2:15-4:15 P.M.
Questions and Answers Panel Session l
4:15-4:30 P.M.
Closing Remarks by Eugene Kelly, Chief, Systems Section, Division of Reactor Safety