ML20024J094

From kanterella
Jump to navigation Jump to search
Submits Daily Highlight Re 940929 Meeting W/Ge in Rockville,Md to Discuss Test & Analysis Program to Be Conducted for Sbwr Design at Paul Scherrer Inst Panda Facility.Proposed Agenda Encl
ML20024J094
Person / Time
Site: 05200004
Issue date: 09/27/1994
From: Malloy M
Office of Nuclear Reactor Regulation
To: Miraglia F, Russell W, Thadani A
NRC
References
NUDOCS 9409300106
Download: ML20024J094 (4)


Text

_

i

@ Deco A

y I

E E

UNITED STATES 5

NUCLEAR REGULATORY COMMISSION k*****,8 WASHINGTON, D.C. 20555-0001 September 27, 1994 l

MEMORANDUM TO:

W. Russell G. Lainas R. Spessard F. Miraglia J. Roe C. Thomas A. Thadani J. Zwolinski J. Wermiel L. Reyes D. Crutchfield.

E. Adensam J. Calvo B. Grimes V. McCree, EDO W. Travers B. Sheron J. Caldwell F. Gillespie B. D. Liaw Operations Center S. Varga G. Holahan C. Miller M. Virgilio THRU:

R. W. Borchardt, Director Standardization Project Directorate Associate Directorate for Advanced Reactors i

and License Renewal j

Office of Nuclear Reactor Regulation fx FROM:

Melinda Malloy, Project Manager M..

I Standardization Project Directorate Associate Directorate for Advanced Re ctors and License Renewal Office of Nuclear Reactor Regulation i

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING BETWEEN NUCLEAR REGULA-REGULATORY COMMISSION (NRC) STAFF AND GE NUCLEAR ENERGY (GE!

l l

ON TESTING ACTIVITIES RELATED TO THE SIMPLIFIED BOILING WATER REACTOR (SBWR) DESIGN AT THE PANDA FACILITY l-DATE AND TIME:

September 29, 1994 - 8 a.m. - 5 p.m.

l LOCATION:

U.S. Nuclear Regulatory Commission Two White Flint North Building 11555 Rockville Pike Rockville, Maryland 20852 Room: T-9 F5 PURPOSE:

To discuss the test and analysis program to be conducted for the SBWR design at the Paul Scherrer Institute PANDA facility.

A proposed agenda is attached.

NOTE:

Proprietary features on the SBWR design may be discussed.

These portions of the meeting will be closed to the public.

gg RE W4M UN f[TM N 4

A ns l

s 4 <

/

/

' September 27, 1994 l

l l

PARTICIPANTS *:

NRR Gf i

l J. Kudrick T. McIntyre l

A. Drozd J. Torbeck K. Campe Jim Fitch, et al.

M. Razzaque J. Staudenmeier l

A. Notafrancesco M. Malloy, et al.

Docket No.52-004 l

l

Attachment:

Proposed Agenda cc w/ attachment:

See next page i

  • Meetings between the NRC technical staff and applicants or licensees are 1

open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78.

However, portions of this meeting may be closed to protect GE proprietary information.

Members of the public who wish to attend should contact either Melinda Malloy at (301) 504-1178 or Son Q. Ninh at (301) 504-1125.

DISTRIBUTION:

Docket File, PDST R/F RBorchardt PDR JNWilson MMal1oy SNinh RHasselberg DTang PMagnanelli NRR Mailroom, 0-12G18 EJordan, T-4 D18 JMoore, 0-15 B18 OPA WDean, 0-17 G21 ACRS (11)

AChaffee TGody, 0-12 G18 i

JKudrick, 0-8 H2 MRazzaque, 0-8 E23 JStaudenmeir, 0-8E2 ANotafrancesco, T-10 K8 Receptionist, T-WF DMcPherson, 0-8E2 RCaruso, 0-8E2 KCampe, 0-8E2 RBarrett, 0-8H2 ADrozd, 0-8H2 RJones, 0-8E23 Alevin, 0-8E23 MRazzaque, 0-8E23 GCwalina, 0-9D4 RMcIntyre, 0-9D4

)

GBagchi, 7H15 RWessman, 0-7E23 DFischer, 0-7E23 MHodges/TKing, T-10E37 LShotkin, T 10G6 FEltawila, T-10K8 ANotafrancesco, T-10K8 PBoehnert, T-2E26 A _,[

0FC LA;RDST:ADAR Pfi:PDST:ADAR PM:PDST:ADAR SC'IPDST;[0k Phanelli f

kdhsg Ninh dNWilNn /

NAME 09/1h94 09Mk 09/y1/94 09/sf/ /

DATE OFFICIAL RECORD COPY:

DOCUMENT NAME: MTG0929.MM

i GE Nuclear Energy Docket No.52-004 cc: Mr. Patrick W. Marriott, Manager Mr. Richard W. Burke Sr., Manager Advanced Plant Technologies BWR Design Certification i

GE Nuclear Energy Electric Power Research Institute 175 Curtner Avenue 3442 Hillview Avenue San Jose, California 95125 Palo Alto, California 94304-1395 Mr. Laurence S. Gifford Mr. Brian McIntyre GE Nuclear Energy Westinghouse Electric Corporation 12300 Twinbrook Parkway Energy Systems Business Unit Suite 315 Box 355 Rockville, Maryland 20852 Pittsburgh, Pennsylvania 15222 Director, Criteria & Standards Division Office of Radiation Programs U.S. Environmental Protection Agency 401 M Street, S.W.

Washington, D.C.

20460 l

i Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 Mr. John E. Leatherman, Manager SBWR Design Certification GE Nuclear Energy 1

175 Curtner Avenue, MC-781 San Jose, California 95125 Mr. Steven A. Hucik 4

GE Nuclear Energy l

175 Curtner Avenue, MC-780 San Jose, California 95125 Mr. Frank A. Ross Program Manager, ALWR Office of LWR Safety & Technology i

U.S. Department of Energy NE-42 19901 Germantown Road Germantown, Maryland 20874 Mr. Victor G. Snell, Director Safety and Licensing AECL Technologies 9210 Corporate Boulevard Suite 410 Rockville, Maryland 20850 l

4 i

PANDA TEST AND ANALYSIS REVIEW Thursday, September 29, 1994 PROPOSED AGENDA 1.

GE presentation regarding PANDA test program (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

PANDA relationship to other tests (GIRAFFE, PANTHERS)

=

i review of the test matrix:

=

steady-state runs main steam line break simulation other plans PANDA TRACG model 2.

Technical details - open discussion (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />) adequacy of instrumentation for TRACG simulation relevance of measured parameters to TRACG qualification a

Passive Containment Cooling System performance calculations i

l l

i Attachment i

l

,