ML20024J037

From kanterella
Jump to navigation Jump to search
Advises That Changes to Plant Radiological Emergency Response Plan Meet Planning Stds of 10CFR50.47(b) & Requirements of App E to 10CFR50
ML20024J037
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/02/1993
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Beard P
Florida Power Corp
References
NUDOCS 9308310182
Download: ML20024J037 (3)


Text

_

)

Q.{fjfd %I[{!)(.

JUL 0 21993 Docket No. 50-302 License No. DPR-72 Florida Power Corporation f

Mr. P. M. Beard, Jr.

tr VP, Nuclear Operations lu iN:

Mgr., Nuclear Licensing l

P. O. Box 2i9-NA-21 Crystal River, FL 34423-0219 l

Gentlemen:

I i

SUBJECT:

CRYSTAL RIVER RADIOLOGICAL EMERGENCY RESPONSE PLAN REVISION 12 i

Based on our review of the subject submittal, we have concluded that the changes therein meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

Please be rem nded that 10 CFR 50.54(q) requires that propsed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.

However, changes may l

be made without Commission approval if such changes do not decrease the 3

effectiveness of the Plan, and the Plan, as changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q). Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 4

Appendix E to 10 CFR Part 50 i

Should you have any questions regarding this letter, please contact Mr. Kenneth P. Barr of our staff at (404) 331-0335.

l Sincerely, I

/

m William E. Cline, Chie U

Radiological Protection and i

Emergency Preparedness Branch i

Division of Radiation Safety and Safeguards cc:

(See page 2) 9308310182 930702 PDR ADOCK 0500 2

F TE351 1

i i

Florida Power Corporation 2

E i

cc:

Gary L. Boldt Vice President, Nuclear Production Florida Power Corporation P. O. Box 219-SA-2C Crystal River, FL 34423-0219 i

B. J. Hickle, Director Nuclear Plant Operations Florida Power Corporation P. O. Box 219-NA-2C Crystal River, FL 34423-0219 R. C. Widell, Director Nuclear Operations Site Support Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 34423-0219 i

Gerald A. Williams Corporate Counsel Flo,-ida Power Corporation MAC - ASA P. O. Box 14042

-l St. Petersburg, FL 33733 Attorney General Department of Legal Affairs The Capitol i

Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services i

1317 Winewood Boulevard Tallahassee, FL 32399-0700 i

Adminbtrator Depa'tment of Environmental degulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 cc:

(cont'd on page 3)

'1

Florida Power Corporation 3

l cc:

(cont'd)

Chairman i

Board of County Commissioners l

Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Robert B. Borsum B&W Nuclear Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 j

bcc:

K. Landis, RII S. Vias, RII H. Silver, NRR i

Document Control Desk i

NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 i

l I

I i

1 i

4 L

l l

i RI SS P

S RII:DRP p$

1

.JJclisij T<)LWws AGooden CJBhrr Mb 7 i}W 6/jp93

-T/./93 l

[

i f

i-r

..