Requests That One Copy of Documents from Encl SBO Document List Be Sent in Order to Conduct Insp at Plant for Wk of 930920-24.Purpose of Insp,To Verify Adequacy of Program, Procedures,Training,Equipment & Sys
ML20024J035
Person / Time
Site: Pilgrim
Issue date: 08/25/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
References
NUDOCS 9308310180
Download: ML20024J035 (4)


Text

. _..

AUG 2 51993 Docket No. 50-293 E. Thomas Boulette, PhD Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Sntion Rocky Hill Road Plymouth, Massachuseus 02360

Dear Dr. Boulette:

SUBJECT:

DOCUMENT REQUEST FOR STATION BLACKOUT RULE.

IMPLEMENTATION INSPECTION As discussed with Ms. Nancy Desmond of your staff, we have scheduled an inspection at your Pilgrim Nuclear Power Station for the week of September 20-24,1993. The purpose of this inspection is to venfy the adequacy of your program, procedures,' training, equipment and systems, and supporting documentation for implementing the Station Blackout (SBO) rule,10 CFR 50.63.

In order to conduct this inspection, we will need to review, in advance, documents l

concerning coping with an SBO event. We request that you send one copy of the documents identified in the enclosure to the NRC, Region I office, c/o Mr. J. Trapp, 475 Allendale Road, King of Prussia, PA 19406, by September 13, 1993.

Your cooperation with us during this inspection will be appreciated. Should you have eny questions regarding this inspection, you may contact Mr. Jim Trapp at (215) 337-5186 or Mr. William Ruland at (215) 337-5376.

Sincerely, Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety G:PLDOCRQS.SBO OFFICIAL RECORD COPY 9308310180 930825 M

PDR ADOCK 05000293 y

G PDR I

.i l

R.n.2

)

1 Mr. E. Thomas Boulette 2

)

l cc w/ encl:

j E. Kraft, Vice President, Nuclear Operations and Station Director L. Schmeling, Plant Department Manager j

V. Oheim, Manager, Regulatory Affairs and Emergency Planning Department l

D. Tarantino, Nuclear Information Manager

}

N. Desmond, Compliance Division Manager j

R. Hallisey, Department of Public Health. Commonwealth of Massachusetts l

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts l

The Honorable Edward M. Kennedy l

The Honorable John F. Kerry j

The Honorable Edward J. Markey The Honorable Terese Murray The Honorable Peter V. Forman B. Abbanat, Department of Public Utilities Chairman, Plymouth Board of Se'ectmen Chairman, Duxbury Board of Selectmen Plymouth Civil Defense Director Paul W. Gromer, Massachusetts Sncretary of Energy Resources l

Sarah Woodhouse, Legislative As',istant A. Nogee, MASSPIRG Regional Administrator, FEM A l

Office of the Commissioner, Massachusetts Department of Environmental Quality j

Engineering

.i Ofnce of the Attorney General, Commonwealth of Massachusetts l

T. Rapone, Massachusetts Executive Office of Public Safety Chairman, Citizens Urging Responsible Energy

[

Public Document Room (PDR) l Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (32) SALP Reports and (2) All Inspection Reports NRC Resident Inspector Commonwealth of Massachusetts, SLO Designee l

l G:PLDOCRQS.SBO OFFICIAL RECORD COPY i

e i

-i AUG 2 51993 j

Mr. E. Thomas Boulette -

3 l

i bec w/ encl:

i i

Region 1 Docket Room (with concurrences) j bec w/enci (VIA FeMAIL):

}

W. Butler, NRR l

R. Eaton, NRR j

V. McCree, OEDO l

y 4

3 I

i s

e e

i s

l i

I

~

)

i l

i i.

i i

i i

RI:DRS R1:DRS 71' Trapp hRuland w

y OSFf/93 083f/93 a

G:PLDOCRQS.SBO OFFICIAL RECORD COPY

_q i.

4 h

1

.,u._.

i ENCLOSURE 1

SBO Document List j

]

Surveillance procedures to ensure operability of necessary SBO equipment.

Training and procedures implemented to cope with SBO (SBO Response including i

alignment of AAC source to appropriate buses, AC power restoration, severe weather procedure, etc.).

Quali5 cation Program of non-class IE equipment necessary for SBO coping (if applicable).

Engineering calculations and studies pertaining to the AAC capacity and capability to maintain acceptable voltage and frequency while powering SBO Imads.

Modification packages imple-mented for SBO coping.

i Test procedure, results, acceptability criteria for initial test of AAC power source (NUM ARC 87-00, B.12).

Abnormal operating procedures for loss of all AC power.

EDG Reliability Program.

l i