_ _ _ _ _ _ _ _ _

m May 24, 1991 Docket Nos. 50 259

.j 50-296 LICENSEE:

Tennessee Valley Authority FACILITIES:

Browns Ferry Nuclear Plant Units 1 and 3

SUBJECT:

MAY 22, 1991 MEETING WITH TENNESSEE VALLEY AUTHORITY TO PLAN LICENSING ACTIONS REQUIRED TO SUPPORT RESTART OF BROWNS FERRY UNITS 1 AND 3 On May 22, 1991, a meeting was held between representatives of the Tennessee Valley Authority (TVA) and the NRC staf f in Peckvilla, MD.

This meeting was held to discuss licensing actions required to support restart of Browns Ferry Nuclear Plant (BFN) Units 1 and 3.

A list of attendees and copies of handouts are attached.

The discussion focused on the letter from TVA to NR' dated January 9,1991, which described TVA's plans for restart of BFN_1 and 3.

in the past, the NRC staff has closely reviewed both criteria and methodology in TVA's corrective action programs used to restore BFN-2 to service.

in general., TVA plans to use the same criteria and methods to refurbish BFN-1 and 3.

TVA had proposed that f4RC review was not required for changes to methodology if the BFN-2 criteria are preserved. These programs are listed in Enclosure 3 of the January 9,1991 letter.

The NRC staff recognizes improvements in TVA's engineering capability, but plans to review the Enclosure 3 program changes at the same level of detail as the original review for BFN_2.

Original signed by Joseph F. Williams, Project Manager Project Directorate 11-4 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation

Enclosures:

1, Attendance List 2.

TVA Meeting Slides 3.

TVA Meeting Handout cc w/ enclosures:

See next page

.:.. 4 _g _.___:.___-4/QcQ______:______________

PDII-4/DD
PDII OFC
PDII 4/LA
PDIl 4/PM ~

O _____:_________

______:__.:..k_c/[

SBlac6
FHebdon NAME
t k
JWilliam

__:____.__/. ____:._____________: _____________:____ -_____.__

6/)y/91
T / pt /91
C/Ul/91 7? '[ /91 DATE 0FFICIAL REURD COPY Document Name:

BFN MEETING

SUMMARY

9 9106040105 910524 T[O f 5 N '" 3d D P 'ill

  • M L L W.,

M2dkn Wf PDR ADOCK 05000259 P

PDR

( g

M fieetino Suminary, tiemorada for Trip Reports, or Site Visits **

i. Docket file tJRC PDR

~

Local PDR F. Miraglia 12-G-10 J. Partlow 12-G-18 S. Varga 14-E-4 G. Lainas 14-H-3 F. Hebden S. Bleck M. Krebs J. Williams T. Ross D. Moran B. Wilson RII J. tieschelberger 17-G-21 P. Kellogg R!!

C. Patterson Ril 0GC 15-B-18 E. Jerc'ari l'.fil:E -3701 D. Houster P-315 ACRS (10) i l

l l

l l

l l

'o e

cc:

Mr. Marvin Runyon, Chairman Mr. O. J. Zeringue, Site Director Tennessee Valley Authority Browns Ferry Nuclear Ploot ET 12A Tennessee Valley Authority 400 West Sunr.it Hill Drive P. O. Fox 2000 Knoxville, Tennessee 37902 Decatur, Alabamo 3Ef02 Mr. Edward G. Wallace Mr. P. Carier, Site Licensing l'anager Manager, Nuclear Licensing Browns Ferry Nuclear Plant and Regulatory Affairs Tennessee Vality luthority Tennessee Valley Autherity P. O. Box 2000 SB Lockout Place Decatur, Alabama 35602 Chattanooga, Tennessee 37402-2801 Mr. John B. Waters, Director Mr. L. W. Myers, Plcr t Manager

~

Tennessee Valley Authority Browns Ferry Nuclear Plant ET 12A Tennessee Valley Authority 400 West Sunmit Hill Drive P. O. Box 2000 Knoxville, Tennessee 370C:

Decatur, Alabama 35602 Mr. W. F. Willis Chairman, Limestone County Commission Senior Executive Cfficer P. O. Box 188 ET 12B Athens, Alabama 35611 400 Vest Summit Hill Drive Knoxville, Tennessee 37902 Claude Earl Fox, M.D.

State f.ealth Officer General Counsel State Department of Public Fealth Tennessee Valley Authority State Office Building ET 11H Uentgomery, Alabama 3613C 400 West Summit Hill Drive Knoxville, Tennessee 37902 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. Dwight Nunn 101 Marietta Street, N.W.

Vice President, Nuclear Projects Atlanta, Georgia 30323 Tennessee Valley tuthority 3C Lcokout Place Mr. Charles Patterson 1101 Market Street Senior Resident Inspector Chattanooga, Tennessee 37402-20C1 Crowns Ferry Nuclear Plant U.S. Nuclear Regulatory Commission Dr. Mark 0. Medford Route 12, Box 637 Vice President, Nuclear Assurante Athens, Alabama 3c611 Licensing and Fuels Tennessee Valley Authority Tennessee Valley Authority 68 Lookout Place Rockville Office Chattanooga, Tennessee 37402-2801 11921 Rockville Pike Suite 402 Mr. Dan A. Nauman Rockville, Maryland 20852 Senior Vice President, Nuclear Power Tennessee Valley Authority CN 38A Lookout Ploce 1101 Market Piece Chattanooga, Tennessee 37402-2801

l*

ENCLOSUEE 1 i

ATTENDANCE LIST t'EETING BETWEEN TVA_Affd NRC NAME TB

5. Varga E. G. Wallate D. Houston D. Nye F. Hebdon H. F. McClusky T. Ross J. McCarthy J. Wechselberty r G. Lainas S. Black J. Williams

ENCLOSURE 2 7

/ ;' -

AGENDA FOR TVA/NRC MEETING ON MAY 22, 1991 i

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 TOPIC SP0KESMAN INTRODUCTIONS E. G. WALLACE OVERVIEW 0F MEETING H. F. MCCLUSKEY l

UNIT 2 RESTART PROCESS J. E. MCCARTHY r

l LESSONS LEARNED J. E. MCCARTNY PROPOSED UNITS 1 AND.3 RESTART PROCESS J. E. MCCARTHY

.?

SPECIFIC AREAS OF STAFF INTEREST H. F. MCCLUSKEY t

l CONCLUSION E. G. WALLACE I

t DISCUSSION i

OPEN l

= ? ';j y s

'TVA/NRC MEETING ON MAY 22, 1991:

i-REGULATORY-FRAMEWORK FOR-THE RESTART 0F BROWNS FERRY UNITS 1 AND 3 l

TOPIC SP0KESMAN i

OVERVIEW 0F MEETING H. F. MCCLUSKEY I

REVIEW'0F UNIT 2 RESTART PROCESS

+

l LESSONS LEARNED FROM UNIT 2 RESTART PROPOSED UNITS 1 AND 3 RESTART PROCESS i

i SPECIFIC AREAS OF STAFF INTEREST i

i CONCLUSION i

DISCUSSION i

5 L

6

1,-

TVA/NRC MEETING ON MAY 22, 1991 i

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 TOPIC SPOKESMAN UNIT 2 RESTART PROCESS J. E. MCCARTHY NRC'S SEPTEMBER 1985 50.54(F)

SUBMITTAL OF CORPORATE AND BROWNS FERRY NUCLEAR PERFORMANCE PLANS PROGRAMMATIC SAFETY EVALUATIONS RESOLUTION OF MANAGEMENT ISSUES SUBMITTAL OF PRE-RESTART COMMITMENTS AND PROGRAMS COMPLETION LETTER UPDATE FSAR TO REFLECT FACILITY UPGRADE SUBMITTAL OF SCHEDULE FOR POST-RESTART COMMITMENTS (120 DAYS AFTER RESTART) l

- - m -

.m

.. - s TVA/NRC MEETING ON MAY 22, 1991 REGULATORY. FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1.AND.3 TOPIC SP0KESMAN l

LESSONS LEARNED J. E. MCCARTHY SIGNIFICANT TVA/NRC RESOURCES REQUIRED TO NEGOTIATE PROGRAMS AND CRITERIA PRIOR TO IMPLEMENTATION TVA DESIGNED "AT RISK" UNTIL NRC APPROVAL OBTAINED USE OF INTERIM CRITERIA FOR RESTART OF i

UNIT 2 c

TVA/NRC MEETING ON MAY 22, 1991 REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 TOPIC SP0KESMAN PROPOSEC UNITS 1 AND 3 RESTART PROCESS J. E. MCCARTHY UPGRADE OF FACILITIES TO IMPLEMENT PROGRAMS AND COMMITMENTS TO MEET FSAR CRITERIA USING 50.59 PROCESS REVIEWED ISSUES DISCUSSED IN BROWNS FERRY NUCLEAR PERFORMANCE PLAN (BFNPP)

FOR APPLICABILITY COMPLETION OF REMAINING BFNPP SPECIAL i

PROGRAMS T0' FINAL DESIGN CRITERIA EXCEPT FOR SEISMIC ISSUES RELATED TO USI A-46 l

COMPLETION OF OUTSTANDING REGULATORY COMMITMENTS (PROJECT PLAN)

SUBMITTAL OF PRE-RESTART COMMIIMENr5 AND PROGRAMS COMPLETION LETTER NRC APPROVAL PRIOR TO RESTART l

  • lj...

TVA/NRC MEETING-0N MAY 22, 1991 l

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 i

i TOPIC SPOKESMAN I

SPECIFIC AREAS OF STAFF INTEREST H. F. MCCLUSKEY MANAGEMENT ISSUES i

l OPERATIONAL READINESS REVIEW J

I CURRENT RESTART SCHEDULE t

I l

TVA/NRC MEETING ON MAY 22, 1991 REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 1

TOPIC SP0KESMAN l

MANAGEMENT ISSUES H. F. MCCLUSKEY 1

ROOT CAUSES OF PROBLEMS WITH MANAGEMENT ABSENCE OF EFFECTIVE ORGANIZATIONAL STRUCTURE WITH CLEAR LINES OF RESPONSIBILITY, AUTHORITY, AND l

ACCOUNTABILITY INSUFFICIENT FOLLOWUP TO VERIFY IMPLEMENTATION OF GOALS AND OBJECTIVES FAILURE TO SCOPE, PLAN FOR, AND APPLY RESOURCES TO RESOLVE EMERGING ISSUES l

s

. c TVA/NRC MEETING ON MAY 22, 1991 I

REGULATORY FRAMEWORK FOR THE PESTART OF BROWHS FERRY UNITS 1 AND 3

[

l l

t TOPIC SPOKESMAN MANAGEMENT ISSUES H. F. MCCLUSKEY OVERALL CORRECTIVE ACTIONS i

RESTRUCTURED OFFICE OF NUCLEAR POWER AND SITE ORGANIZATIONS TO CLEARLY DEFINE RESPONSIBILITY, AUTHORITY, AND ACCOUNTABILITY DEVELOPED POSITION DESCRIPTIONS FOR I

SITE MANAGEMENT TO FURTHER DEFINE l

RESPONSIBILITIES l

INITIATED MANAGEMENT DEVELOPMENT PROGRAM i

I l

_. 0 e.-

i TVA/NRC MEETING ON MAY 22, 1991 f

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 1

TOPIC SPOKESMAN i

MANAGEMENT ISSUES H. F. MCCLUSKEY f

I' CORFORATE ISSUES RESOLVED PRIOR TO RESTART OF SEQUOYAH BROWNS FERRY SITE SPECIFIC ISSUES RESOLVED PRIOR TO APPROVAL OF UNIT 2 RESTART i

l s

i I

i l

l i

[

s i

i

TVA/NRC MEETING ON MAY 22, 1991 l

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 r

i TOPIC SPOKESMAN i

MANAGEMENT ISSUES i

H. F. MCCLUSKEY BFN RESTART MANAGEMENT TEAM INITIATED TO PROVIDE DEDICATED RESOURCES TO RELIEVE BFN OPERATIONS OF DAY-TO-DAY UNIT 3 RESTART RESPONSIBILITIES AND TO l

CONCENTRATE ON SAFE AND EFFICIENT j

UNIT 2 OPERATIONS

}

BFN RESTART ESTABL'ISHED AS A SPECIAL PROJECT WITHIN THE CURRENT dFN SITE 0~;GANIZATION DIVISION OF RESPONSIBILITY AND LINES OF COMMUNICATION BETWEEN BFN OPERATIONS i

AND BFN RESTART CLEARLY AND FORMALLY DEFINED I

l l

i i

k i

TVA/NRC MEETING ON MAY 22, 1991 I

l l

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 t

i VICE-PRES

{

VICE-PRES BFN BFN OPERATIONS v

l SERVtCES TO 1

RESTART srTE FOR P.ESTART I

l PUNT l

MANAGER f

PtANNINGl$

l SCHEDUtfNG/ _

i IMPLEMEl4TATION l

l g g7 RESPON98tfTIES NAER l

l CA ttCENS:NG OPERAT1ONS NUCLEAA FtELD ENGNEERWG I

" WQS l

d 4

QA

}

BECHEL l

'A/E 4

1 I

I i

l

~

MOOtFICATION LICENSNG TECHN! cat f

i CONTRACTOR RESPONS8ttfTV i

I 1

1 OPERATIONS

'j j

GENERR "NI l

i ELECTRIC i

FOR RESTART 4

otGITAL I

ENGNEERING MAINTENANCE 4

1 l

1 f

1 NuCtEAn 2

ENGNEERtNG j

t I

i i

~

TVA/NRC MEETING ON MAY 22, 1991 REGULATORY FRAMEWORK FOR Th1 RESTART OF BROWNS FERRY UNITS 1 AND 3

'l TOPIC SPOKESMAN 1

UNIT 2 OPERATIONAL READINESS REVIEW H. F. MCCLUSKEY

{

OVERALL GOAL WAS TO ESTABLISH A HIGH DEGREE OF CONFIDENCE THAT THE PLANT AND 4

PERSONNEL WERE READY TO RESTART AND OPERATE UNIT 2 IN A SAFE AND RELIABLE MANNER

)

4 4

I I

I 4

'f e

...w-.-

..m.,-

.s

4 TVA/NRC MEETING ON MAY 22, 1991 1

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 t

i t

I f

l TOPIC SPOKESMAN UNIT 3 OPERATIONAL READINESS REVIEW H. F. MCCLUSKEY WILL VERIFY COMPLETION OF RESTART COMMITMENTS AND PREREQUISITES I

WILL REQUIRE TVA PERFORM AN EVALUATION OF t

}

LESSONS LEARNED AFTER UNIT 2 POWER

{

ASCENSION COHPLETED i

i WILL ESTABLISH THE SAME HIGH DEGREE OF j

CONFIDENCE THAT THE PLANT AND PERSONNEL i

ARE READY TO RESTART UNIT 3 AND OPERATE I

THE PLANT IN A SAFE AND RELIABLE MANNER f'

i I

j l

~

i

?

l l

[

l L

l i

I t

  • l.'.

TVA/NRC MEETING ON MAY 22, 1991 REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 TOPIC SPOKESMAN CURRENT UNIT 3 RESTART SCHEDULE H. F. MCCLUSKEY OVERALL TARGET RESTART DATE DETAILED SCHEDULE BEING REFINED WILL PRDVIDE NRC WITH CDPIES DF DETAILED SCHEDULE ONCE SUFFICIENTLY DEVELOPED

TVA/NRC HEETING ON MAY 22, 1991 REGOLATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 b

BFN UNIT 3 MILES FONE

SUMMARY

SCHEDULE

.I L4 Sk.ss t Oedt t 11 (CeeSI' d Is3e4 LDadtL1t ie A L t0 0 f1A t RfA 5 0

0

,m 0 0

,$ U

..... ~.

m m,

as J l J gA 5

o te D

J e

u a

as J

J A

5 o

N to J

f to a

M J

J A

S O

N O

1 _ a _... _ _.

j l

l pdi E t,8% ii O a at

  • DOwed t:

o~,

( Al U 2.: l 6

51 RAM !'

-o-o-

-o ANAL t $rs & Li StLit let rart t L & Ha t>t a 444, (pf agi Aq

^

tl C

lo--

a 3

e t UW2 Pt K:I sied

  • e r,aial l

e g_

____.%e-

. _..Slette11% {

tem Pj4le OHus. 8 w tr2 aa30s. &

4, l

j e

e

.t II t t.t TRt.at Ap4At V5fs4 & Ot%sLN l

l

.o

~

]

{

(4) UIT T

Y

{ t OtstIHir: Inn 1! E C ikE. At mesa p..._.,,

ml

=

=

e e

l j cfileaflows twE F5 e

.--____...-._-__Q

().

gg

- s eaaA ro.

. e ur t 4

~

l ri f itmee3sf et $ 35 $ f te I t C [Wh i s f l t Ca3 Put & M5 g

rp p

O-

- b -(

g Y '-* '

E Y-4 l

ttf( 19m.at l

Id WI Mi t 8

f**I PS a5ST I

l e

It SI e

l

/-

. n* Re sta

+

4 a :

d g_ _ _._. _ I sat Auct ct,._et e.r ucca Aa 5 _ - _. - ~ _.. -

6-a

{

7,/-[.

_ comest a et immr A

a 4

[

,a,

, IlettilIPs QMF HaiOR [tPt.S AD( $ & MA NIi Ma M E o _.

"t ItLMikr# (J oe ka f 4A4 &

Ftlll 1

Y a

[(wi l f t kt"V *ONE &

l [aejas t eAHat s Sv",tt aa s t itr0 I'

N%PE CTKlee oe n _. s.i i _a v en,.__

y, T

...o.-(r__---_.

4 cue rb.__ _

i

.__. o ___ r Lu s/es 4tActon wtssia w mA k& Okt & Herts tvE i

I

& inf4 48!4MKIWJee ST9't AC1 TENT erw a snars.

(JtD NiaaOVAt

6 TVA/NRC MEETING ON MAY 22, 1991 i

L REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 i

2 i

TOPIC SPOKESMAN CONCLUSION l

1 E. G. WALLACE q

NRC'S 1985 50.54(F) REQUEST SATISFIED i

UNITS 1 AND 3 REQUIRE LESS NRC OVERSIGHT i.

J UNITS 1 AND 3 ARE " NORMAL" PLANTS I

t b

i I

I i

I e

l i

I l

l TVA/NRC MEETING ON MAY 22, 1991 l

REGULATORY FRAMEWORK FOR THE RESTART OF BROWNS FERRY UNITS 1 AND 3 i

TOPIC SPOKESMAN DISCUSSI0?1 OPEN i

i i

4 I

I t

t

iM L O M f. 3 o

e DROWNS FEPRY NUCLEAR PLANT NUCLEAR PERFORMANCE PLAN (NPP) SPECIAL PROGRAMS WHICH HAVE BEEN COMPLETED ON UNITS 1,2 AND 3 l

secondary containment Penetrations Welding

)

Wall Thinning Assessment Program (Pipe Frosion/ Corrosion) 1 Heat Code Traceability UNITP

  • AND 3 NPP SPECIAL PROGRAMS TO DE IMPLEMENTED ACCORDANCE WITH THE UNIT 2 PRECEDENT rnvironmental via11fication La o Dore Piping and Supports (Bulletins 79-02 and 79-14)

HVAL Duet Supporte Control Pod Drive (CPD) Insert and Withdrawal Piping Upper Drywell Platforms Miscellaneous Steel Frames Seismic Class l' Over Class ! / Spacial System Interactions Design Calculations Peview Intergranular Stress Corrosion Cracking (icSCC)

Probabilistic Disk Assessment Component and Piece Part Qualification Cable Ampacity Flexible Conduite Thermal Overloads Splices Fuses Q-List Moderate Fnergy Line Dreak (HFLD)

Containment coatings Platform Thermal Crowth UNITS 1 AND 3 NPP SPECIAL PROGRAMS WHICH WILL DEPART FROM THE UNIT 2 IMPLEMENTATION PRECEDENT Cable Installation (Including Cable Separation)

Submitted 5/10/91 Instrument sensing Lines Submitted 2/13/91 Small Bore Piping Submitted 2/27/91 Iastrument Tubing Submitted 2/27/01 Seismic Class !! Over ! - Water Spray Submitted 2/27/91 Cable Tray Supports Submitted 3/27/91 Long Term Torus Integrity Program Submitted 4/29/91 Conduit Supports submitted 5/06/91 Configuration Hanagement / Design Baseline Scheduled 6/14/91 Postart Test Program To be scheduled UNITS 1 AND 3 NPP SPECIAL PROGRAMS WHICH WILL DEPART FROM THE UNIT 2 CRITERIA PRECEDENT Drywell Steel Platforms Scheduled 6/14/91 Fire Protection / 10 CFR $0, Appendix R Scheduled 7/15/91