Responds to NRC Re Violations Noted in Insp Rept 50-254/91-05 on 910128-0214 & 0321.Corrective Actions: Positive Tolerances to Specified Settings Added to Procedure QEMP-600-1 Re Maint of motor-operated Valves
ML20024H251
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/23/1991
From: Kovach T
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9105310033
Download: ML20024H251 (7)


Text

. _ _ _ _ _ _

o Commonwealth Edison 1400 Opus Place OQ,'

Downers Grove. Illinois 60515

,V April 23,1991 Mr. A. Bert Davis Regional Administrator Region ill U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Quad Cities Nuclear Power Station Units 1 and 2 Response to Two Level IV Violations Inspection 50-254/91005 NRC Docket No. 50 254

Reference:

Mr. P. Phillips letter to Cordell Reed dated March 25; 1991 Transmitting NRC Inspection Report 50-254/91005 Mr. Davis:

This letter is in response to the inspection conducted by Mr. l. T. Yin from January 28 through February 14,1991 and March 21,1991, of activities at Quad Cities State" The referenced Inspection Report indicated that certain activities appeared to be i-violation of NRC requirements. Commonwealth Edison (CECO) has reviewed the notice of violations and in all but one example agrees that the violations occurred a described. The attached Response to Notice of Violation provides response to the proposed violations 1.b.,2.a.,2.b. and 2.c.

CECO has reviewed proposed violation 1.a. and believes that this item does not represent a violation of 10 CFR 50, Appendix B, Criterion Ill. CECO concludes that an adequate design review was 3eriormed for modification M 4-1-88 019, and in light of the information contained in t le Response to Notice of Violation for 1.a., CECO requests that the Staff reconsider this example of the violation.

If your staff has any questions or comments concerning this letter, please refer them to Rita Radtke, Compliance Engineer at (708)515-7284.

Very truly yo,urs,

/[

.J

, vach Nuclear

_nsing Manager cc:

L. Olshan, Project Manager, NRR T. Taylor Senior Resident inspector NRR Document Control Desk AP^' 2 6 1931 m os:wc:

m oa oSood;iS4 g\\

PDR ADOO v

pg ZNLD/865/5 0

033 M CI

RESPONSE TO NOTICE OF VIOLATION VIOLATION 1 10 CFR 50, Appendix B, Criterion Ill, requires in part, that design changes be subject to design control measures commensurate with those applied to the original design. This controlincludes the specification of design bases and that verification of the design be acccmplished through a design review or adequate testing program, it also requires that the design basis be correctly translated into specifications, drawings, procedures, and instructions.

g Contrary to the above, the f ollowing violations were identified:

This is a Severity Level IV violation (Supplement I),

EXAMPLE a.

g An inadequate design review was performed for modification M-4188-019, f ailing to include the seismic qualification reporis regarding whether installed instrumentation would remain within calibration.

DifiCUSSION Quad Cities Station wishes to take exception to the above violation and provides the following statement:

A review of the seismic qualification report," Power System SO Test Report No.

11019," dated January 8,1982, was performed by Sargent & Lundy Engineers (S&L). This report included documentation of the test results of component seismic testing from a structural and pressure integrity point of view, and was accepted by S&L. This report referenced a supplemental report, which would be issued to document the results of the functional tests. S&L concluded that a review of the supplement was not required, because the instruments are safety related only in their passive ability to maintain lube oil pressure integrity.

The supplement was issued on February 10,1982.

The violation states "An inadequate design review was performed for modification M-4-1-88-019, f ailing to include the seismic qualification reports regarding whether installed instrumentation would remain within calibration." The instruments are used to provide indication and/or annunciation functions, which are non-essential.

Based on the non-essential status, S&L determined that it was not necessary to review the functional testing report. CECO concurred with this evaluation and when the supplement was issued it was not transmitted to or required to be reviewed by S&L. In response to the NRC's question regarding the ZNLD/865/6

DISCUSSION (continued) functional capability of the instruments, S&L performed a review of the supplemental report The results of this review indicated that the instrumentation meets its design intent from both a pressure boundary / structural integrity and a functional standpoint. These results were documented in S&L letter dated February 15,1991, and transmitted to the Station by letter, H.L. Massin to R.L.

Bax, dated February 21,1991.

Engineering and Quart Cities Station have thoroughly evaluated this design review. We believe that the initial design review was appropriate to verify system integrity, and it was not required based on their application and use to determine functionalintegrity for the instruments in question. We request that the NRC reconsider this example of the violation.

EXAMPLE b.

The maintenance work instruction associated with modification M-41-88 016 open limit switch!close indication rotor sotup f ailed to appropriately translate the design specification that the rotor be set at h safe distance away from the full open position of the associated tactor operated valves. Furthermore, the associated proceduro did not require documentation of the final setup.

DISCUSSION The Motor-Operated Valve (MOV) VOTES test results were reviewed and showed that the bypass switch settings and the close limit switch /open indication met the modification plan test acceptance criteria. The acceptance criteria for open limit switch /close indication, specified that the limit switch should be set 1/2 inch from the full open position for valves over 10 inches in diameter, and 1/4 inch from the full open position for valves under 10 inches in diameter. The settings were done in accordance with a site maintenance procedure which s ascified a setting within 1/2 inch or 1/4 inch from the full open position, respective y. This acceptance criteria in the maintenance procedure appeared to be unacceptable, because the possibility of the limit switch being set too close to the full open position (set at 0) was not precluded. This could cause valve damage during opening of the MOVs if the valve was backseated. However, all safety related MOVs are tested using VOTES methodology. MOV performance computer plots are recorded during VOTES testing and would revealif a valve was in a back seated condition.

ZNLD/865/7

COBRECTIVESTERS_TAKEN AND RESULTSACHIEVED The station is currently reviewing procedure OEMP 6001 " Electrical Maintenance of Safety-Related and Non Safety Related Motor Operated Valves to add positive tolerances to the specified settings. This will preclude the possibility of the limit switch being set too close to the full open position. The procedure will be revised by July 1,1991. The procedure change will also include a requirement to document the as left limit switch settings.

CORRECTIVE ACTION 10 PREVENT FURTilER NONCOMPLIANCES CECO believes the corrective steps taken above will prevent further non-compliance.

DATE.WHEN FULL COMPLIANCE Will, DE ACHIEVED.

Full compliance will be achieved by July 1,1991 when OEMP 600-1 is revised.

VIOLATION 2 10 CFR 50, Appendix B, Criterion XI, requires in part, that a test program be established to assure systems will periorm satisf actorily in service

~l he test shall be periormed in accordance with written procedures, which contain acceptance limits. Test results shall be documented and evaluated to assure that test requirements have been satisfied.

Contrary to the above, the following violations were identified:

This is a Severity Level IV violation (Supplement I).

EXAMPLE a.

Modification M-4-188-019 construction test f ailed to document the basis for concluding that the temperature gauge was satisfactory when the test results were outside of the acceptance limits specified by Engineering. The acceptance criteria were subsequently modified without proper test f ailure evaluation. Furthermore, the modification test procedure f allec. to incorporate the engineering instruction to monitor leakage of the Emergency Diesel Generator turbo oil pump into the modification test procedure.

DISCUSSION The original testing criteria provided in the modification approval letter dated December 20,1989, required that the temperature gauge accuracy be tested to within +/-1% of full scale (300F). Following the calibration test for the temperature cauge performed on December 7,1990 the Station informed Engineering that the

$tation instruments only allow for testing of +/-4F (1,3% accuracy), which does not ZNLD/865/8

4

' DISCUSSION (continued) meet the acceptance criteria specified in the modification approval letter.

Engineering discussed this with S&L, who evaluated the acceptance criteria and determined that +/-1% was the vendor's published accuracy, which was conservative and unnecessary for this non-safety related gauge (documented per telecon to L.T. Wright from J.W. Dingler dated 12-14-90). The S&L evaluation determined that changing the acceptance criteria from +/-1% to +/1 1.5% of full scale would not alter the conclusions of the original modification approvalletter or addendums, including the 10 CFR 50.59 safety evaluation. The FSAR, UFSAR, and Technical specifications were also reviewed, and did not require revision. This justification was in turn incorporated in modification approvai letter addendum 4, E

dated December 14,1990. Although addendum 4 was appropriately added to the modification package, the temperature gauge calibration documentation portion of the package was not changed to reference the addendum.

Additionally, during modification testing, a small leak was observed at the threaded fitting downstream of the 3 gpm turbo oil pump. CECO Engineering issued an addendum to the test specification on January 15,1991, requiring the checking and 3

monitoring of the leak. This addendum was not incorporated into the test procedure and no record was kept to document its implementation. However, the system enginear did monitor the leak, per the engineering addendum, for the first eight hours of diesel operation. Due to the uniqueness of the test criteria," ensure that the leakage does not exceed the original observed leakage of one drop cer minute,"

the engineer did not modify the modification test checklist to document 11ese test results. He referenced the addendum letter and signed the test acceptance.

CORRECTIVE STEPS _TAKEN AND. RESULTS ACHIEVED Regarding the construction test, a discussion will be held with the individual (s) involved regarding appropriate annotation of addendum changes by May 15,1991.

Regarding the modification test, this appears to be an unique case and the system engineer was counselled to be more careful when reviewing the addendums for incorporation into the work packages relating to the modifications.

CORRECTIVE _ ACTIONIO1REVENT_FU RTHER.NONGOMELI ANCES Regardinti the construction test, CECO believes the corrective step to be taken above will prevent further non-compliance.

Regarding the modification test the Technical Staff will discuss the importance of attention to detail when reviewing addendums for incorporation into work packages relating to modifications with all the system enginee s at a tailgate meeting.

DATE WHEN FULL. COMPLIANCE.Wll,L.BE ACHIEVED Full compliance regarding the construction test was achieved on December 14, 1990, when Addendum 4 to the modification approvalletter was issued to change the acceptance criteria for this construction test.

Regarding the modification test, full compliance was achieved when Engineering issued the addendum to the test specification on January 15,1991.

ZNLD/865/9

4 EXAMPLE b.

The testing associated with Modification M-4-0 89-066 was inadecuate to assure adequate air-operated containment valve leakage in that the test c'id not specify a minimum leak rate but rather evaluated a leahge time irrespective of initial testing pressure.

DJSCUSSION As a part of the modification design basia r6*r, the inspector evaluated the licensee's response to NRC Ge ieric Letter (GL) P814. The leak test for

. containment valves in response to GL 88-14 was colisidered unacceptable. Test acceptance criteria stated that air pressure shall be maintained at 65 psig for a 15 minute holding period. The inspector reviewed several valve test results and noted that depending on the initial instrument air (IA) system pressure, the same leakage rate would f ail a valve in one test, but allow it to pass in another test. For example, suppression chamber isolation valve A01601-60 failed with a leak rate of 0.53 psig/ min. but the reactor building vent exhaust valve 5642B passed at a higher initialIA system pressure with a leak rate of 0.787 psig!niin. Procedure OTS 105 9 " Pneumatic Accumulator System Pressure and Fail Safe Test," was

- deficient since the pressure decay portion of the test did not include a firm system starting pressure requirement. The acceptance criteria for the test required a final pressure of 65 psig after a valve actuation and a 15 minute waiting period.

COBBEVTHE STE ES_TAKEN AN D_R ESULTSACHIEVER The station has revised the test procedure OTS 105-9 to include a starting pressure. Acceptance criteria for the accumulator system leakage now depends on the system leak rate and is not affected by system operating pressure. '

COBBEGIIVEACllON_TO,EREVENT_EURTHERNONCOMELIANCES CECO believes the corrective steps taken above will prevent further non-compliance.

DATE WHEN_EULLCOMPLI ANCE_WILL BEACHIEVED Full compliance was achieved on April 8,1991 when test procedure OTS 105-9 was revised and approved.

EXAMELE_c, Although minor design change 04-1-91-009 specified that functional verification testing for the Motor Operated Valves would be performed using the VOTES method, no testing acceptance criteria were specified.

ZNLD/865/10

t DISCUSSION The inspector selected one Minor Design Change (MDC), PO41-91-009, for review. This MDC was to replace reactor core isolation cooling (RCIC) system Motor Operated Valves (MOVs) 1-130122 and 26 spring packs. The spring packs had been t_oo stiff to meet the licensee engineering MOV thrust window requirements. A review of the 10 CFR 50.59 design change evaluation and systems interadion studies was completed and no deficiencies were identified.

However, during the inspection the following concerns were identified:

ould The MOC work package specified that functional verification testing w(thrust use the VOTES method, but f ailed to specify the acceptance critena windows). Test acceptance criteria had previously been determined by licensee Engineering in a December 7,1990, letter to the station.

COBRECTIVE_SIEE.SJMENANDJESULTS ACHIEVED Acceptance criteria was added to the work package for the MDC on February 14, 1991. This corrected the deficiency.

CORRECIIVEACTIONJO_PREVENLEU BRIERNONCOME LI ANC ES The Minor Design Change Program is beina reviewed and changes will be made to ensure test acceptance criteria is specifiedin MDC work packages. These changes will be made by July 1,1991.

DATE_WHEN.EULLCOMPLIANCE_WILL BE ACBIEVED Full compliance was achieved February 14,1991 when test acceptance criteria was added to the MDC work package.

ZNLD/865/11

.