ML20024G899

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-336/91-06 on 910226-0301 Per Programmed Enhancements Described in Generic Ltr 88-17, Loss of Dhr. No Violations Noted
ML20024G899
Person / Time
Site: Millstone 
Issue date: 04/24/1991
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20024G900 List:
References
GL-88-17, NUDOCS 9105020065
Download: ML20024G899 (3)


See also: IR 05000336/1991006

Text


,

. ,

.

. . . _

- - -

,

\\M

.

APR 2 41991

.

Docket No. 50-336

Northeast Nuclear Energy Company

ATTN:

hir. E. J. hiroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Ilox 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection Report No. 50 336/91 06

This letter refers to the safety inspection of your actions in response to Programmed

Enhancements described in Generic Letter 8817, "!.oss of Decay Heat Removal." A well

implemented program is essential to prevent loss of decay heat removal during non power

operation and to avoid unnecessary risk to the health and safety of the public during such

operation. The inspection was conducted by Mr. D. T. Moy of this office on February 26 to

March 1,1991, at the Millstone Nuclear Station, Unit 2, Waterford, Connecticut. Mr.Moy

discussed the results of the inspection with Mr. Jeffrey Smith and other members of your

staff at the conclusion of the inspection.

'

Areas examined during this safety inspection are described in the NRC Region i Inspection

Report which is enclosed with the letter.

Vithin these areas, the inspection consisted of

seiceted examinations of Mid Loop Operating procedures, representative calculation records,

interviews with plant technical personnel, and general observations by the inspector.

The inspector verified that the " Programmed Enhancements" deseIribed in your response to

Generic letter 8817 (January 31,1989) had been implemented adequately at Millstone 2

Nuclear Station.

h

sll

(

9105020065 910424

gDR

ADOCK 0%g6

/ (){

- - - - - - - - -

-~

4

APR 0 41991

,

Northeast Nuclear

2

Energy Company

Within the scope of this inspection, no violations were observed. No reply to this matter is

1

required. Your cooperation with us in this matter is appreciated.

,

i

Sincerely,

Otir *M1 $ip.ed By1

}'. ):. Et.p n

Jacque P. Durr, Chief

Engineering Branch

Division of Reactor safety

Enclosure: NRC Region i Inspection Report No. 50-336/91-06

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Nuclear Station Director

J. S. Keenan, Nuclear Unit Director

R. M. Kacich, hianager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

Gerald Garfield, Esquire

K. Abraham, PAO (2) All Inspection Reports

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

State of Connecticut

bec w/ encl:.

_

Region I Docket Room (w/concunences)

hianagement Assistant, DRMA (w/o encl)

J. Joyner, DRSS

'

E. Kelly, DRP

W. Raymond, SRI, hiillstone

J. Shediosky, RRI, Haddam Neck

G. Vissing, PM, NRR

K. Brockman, EDO

R. Arrighi, DRP

E. Wenzinger. DRP

__

. . -

_ , _ .

.

. _ _ _ _ - . ~ . , _ . - _ _ . _ . . _ _ . _ _ _ , . . _ , _ _ _

_ . _ . _

..__ __ _

_

_ _ .

l

APP,2 41991

Northeast Nuclear

3

Energy Company

.

1

1

I

N

Rl:I RS/

RI:DRS

R PRS

Moy

f

Eapen

i' p h

g,yy, ( /)i'

41

4/,f'91

4//r/91

4/n/9]

OFFICIAL RECORD Col'Y

F:MS9106

__ .

..- -

_.

, _. ..

.

.