ML20024G885

From kanterella
Jump to navigation Jump to search
Partially Withheld Notice of Violation from Insp on 910304-08 (Ref 10CFR2.790 & 73.21).Violations noted:25 Handguns & 26 Shotguns Identified for Which No Documentation to Indicate Guns Been Tested within Required Time Period
ML20024G885
Person / Time
Site: Millstone  
Issue date: 04/24/1991
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20024G882 List:
References
50-245-91-05, 50-245-91-5, 50-336-91-07, 50-336-91-7, 50-423-91-06, 50-423-91-6, NUDOCS 9105020049
Download: ML20024G885 (2)


Text

-

T cd.F.D$ INiMuTIOR.

~ 6

'DNRL:,'JS. IMDT IE ~

H4L'-A % a6

,,[#

j APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket Nos. 50-245 Millstone Nuclear Power Station, Units 1, 2, and 3 50-336 50-423 License Nos. OPR-21 OPR NPF-49 As a result of:the inspection conducted on March.4-8, 1991, and in accordance with the " General Statement of Policy and Procedure for NRC Enforcement

Actions," 10 CFR Part '2, Appendix C (Enforcement-Policy) (1990), the following violations were identified:

-License Condition E to facility Operating License Nos. DPR-21, OPR-65 and NPF-49, dated December 10, 1984, requires that the licensee fully implement l

and maintain all_ provisions.of the NRC-approved Physical Security Plan.

1.

The NRC - approved Millstone Nuclear Power Station Physical Security Plan, Revision 13, dated July 1990, Section 13.5, Security Personnel Equipment, states,. in part, that weapons are inspected upon issue daily _and. tested every twelve (+/-) 2 months.

._ Contrary to the above, on March 7 -1991, twenty-five handguns and twenty-six shotguns were identified for which there was no documentation to indicate that they were tested within the required time period.

This is a; Severity Level V Violation (Supplement-III).

T1:15 FCASRMH COEAlH3 SAiEGE23 '

MiEZT.'J.i GD li Mal FOR PUMIC Lismii, li 13 (NTEH30 Mil.Y WT BLf.il This is a Severity Level IV Violation (Supplement III) 0FFICIAL RECORD COPY SG CIR MILL: TONE 91-05/07/06 - 0004.0.0 9105020049 910424 PDR ADOCM 05000245 0

PDR

..m T

1 2

Appendix A o

3.

Appendix-G, to 10-CFR 73, " Reportable Safeguard Events,"

Paragraphil, " Events to be reported within one hour of discovery, followed by a written report within;30 days,"

subparagraph-(d) includes "the actual or attempted introduction of H

. contraband into a protected area,'. material access area, vital area,.or' transport." The Millstone Access Control Procedure, ACP 7.05,; Revision 44, Page 8,.Section 6.7.1 states that all personnel _are subject to search each time they enter the Protected Area. ' Searches are' conducted for items of contraband

- such as alcohol, controlled drugs (prescribed),. illegal drugs etc.

In addition,'the Millstone Administrative Control Procedure, ACP 7.13, Revision _1, Page 3, Section 4.5.1

" Safeguards Events To Be. Reported with One (1) Hour,"

Subsection 4.5.1=.1 states,_in-par.t, that certain s.ignificant safeguards events must be telephonically _ reported to-the NRC withi_n one hour of discovery of the event and_ a detailed written report (SER) must follow within 30 days.

These one hour reportableJsafeguards-events include' actual or attempted j

' introduction of contraband-into a PA or VA.

Contrary to the above on_ August 10, 1990, the licensee investi -

-gated the introduction of contraband (alcohol) into the Protected Area.by a security officer on August 2, 1990.

The licensee-

-determined that'the-security officer had unintentionally brought a caniof beer into the PA and failed to report:it to his o

supervisor when he became aware of it.

The licensee did-not l

report the event _to-the NRC b'y-telephone nor.was;a written l'

. report submitted within;30 days. Additionally, the event was.

not documented.'in.the security log-that is required to be-submitted to;the NRC.each calendar quarter.

This is a Severity-Level IV! Violation.-(Supplement'III).

l Pursuant lto the-provisions of 10 CFR 2.201, Northeast' Nuclear Energy Company =

' is hereby: required to. submit'to this office within thirty days _of theldate of the letter which transmitted this Notice, a written statement. or explanation in reply, including: (1) the corrective steps which have:been taken_and the-h results achieved; (2) corrective. steps-which will be taken to avoid further siolations; and;(3)' the' date' when full compliance will be achieved. Where good

-cause is_shown, consideration will be given to' extending this response time.

?

L E

-OFFICIAL RECORD COPY SG CIR MILLSTONE 91-05/07/06 - 0005.1.0 l

04/17/91 h

L.

.u.

,-