Text
kp oca e
UNITED STATES
ATOMIC ENERGY COMMISSION
.
e
.
,
DIRECTOR ATE OF REGULATORY OPERATIONS
'
REGION 111
o
'88 0'
799 ROOSEVELT MOAD
m
GLEN ELLYN ILLINOIS 6o137
010 854-2000
/
APR 1 1 1974
.
Worthera States Power 'supeny
Docket No. 50-263
ATTN:
Mr. Leo Wachter
Vice President
Power Production and
System Operatios
414 Nicollet Mall
Minneapolia, Minnesota 55401
Gentlemen:
This refers to the inspection conducted on February 27--March 1,1974,
by Mr. Hueter of this office of activities authorised by AEC Operating
License No. DPR-22 and to the discussion of our findings with Messrs.
Clarity and Fliason of your staff at the ecocissies of the inspection
and subsequently on March 29, 1974 with Mr. Larosa.
The enclosed copy of our inspection report identifies areas en=fnad
during the inspection. 91 thin these areas, the taspection eensisted
of a selective ensadaatten of procedures and repsesentattge ressuds i
e
a
interviews with plant persennel, and observations by the inspector.
This inspection included a review of Items 2 and 3 of the three items
described in our letter dated June 29, 197;.
During this inspection certain of your activities were found to be in
apparent violation of AEC requiresmats, as described under Rnforcement
i
Actism in the Susnary of Fladiass Section of the saaleoed inspecties
report.
This notice is sent to you pursuant to the provisions of Section 2.201
of ths AEC's " Rules of Practice," Part 2. Title 10, Code of Federal Reg-
ulations. Section 2.201 requires you to submit to this office within
,
j
twenty days of your receipt of this notice a written statement or
explanation in reply, including for Violation A:
(D nrrectiive action
,
taken and the results achieved; (2) corrective actio..
be taken to
i
avoid further violations; and (3) the date when full
epifance n111
I
be achieved. Regarding Violation B, the inspector deterr.iued that cor-
rective action had been taken and that anasures had bee 4 taken to
l
prevent recurrences. Consequently, no reply is required for Violation
l
B and we have no further questions regarding that mettor at this time.
l
i
[
l
l
9102110421 740419
ADOCK 05000263
l
G
I
._, _
- _ _ _ _ _ _ - _
.
.
APR 1 '9 1974
Northra States
Fower Company
-2-
.
In accordance with Section 2.790 of the AEC's " Rules of Freetice," Part 2
Title 10, Code of Federal Regulations, a copy of this notice, the enclo ad
inspection report, and your response to this notice will be placed ir.
w
AEC's Public Document Room, except as follows. If this report contains
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twent; days of your receipt
of this notice, to withhold such information from public disclosure. The
application must include a full statement of the reasons for which the
information is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained in an
enclosure to the application.
We vill gladly discuss any questions you have concerning this inspection.
Sincerely yours,
i v. -
e,
r
James G. Kapplar
,
Rigional Direitte#
' ~ '^
'
'
Enclosure:
RO Inspection Rpt
No. 050-263/74-01
bec:
RO Chief, FS&EB
RO:HQ (4)
Licensing (4)
DR Central Files
RO Files
Local PDR
DTIE
OGC, Beth, P-506A
,
._
_ _ . _ . _ . - _ _ . _ _ . - _ _ . _ _ _ . . _ _ _ _ _ _ _ . _ _ _ _
-_