i
.1 NSRm btu]atory Docket 34 g
L NOMTHERN STATES POWKR COMPANY M I N N E A PO L.l a, M I N N g s OTA 55401 f0 L?! I
^
mirw N.
03
"*7 h
/ 7 s
kfAY Mr Victor Stello, Director 2l-h 2 /S/g u,,,
i Division of Operating Reactors g)M 9
ce U S Nuclear Regulatory Cocanission
(*
- 8 m.,
$$0 4
e s
Washington, DC 20555 Dear Mr Stello D
f 4 MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Revisions to Report of Conformance to 10CFR50, Appendix J, and License Amendment Request dated January 30, 1976 ke f:
(a) Letter from L 0 Mayer to K R Coller, USNR, da ted September 19, 1975 (b) Monticello License Amendment Request dated January 30, 1976 Reference (a) was our initial report of areas of nonconformance with 10CFR50, Appendix J, testing requirements at the Monticello Nuclear Generating Planc.
Reference (b) was a License Amendment Request revising the Monticello Technical Specification. ;o conform to Appendix J.
Evaluation of our ability to conduct testing in accordance with the Regulation has been continuing following submittal of these documents. As a result, a number of changes have been identified which should be made to them.
These changes are required for one or more of the following reasons:
a.
To correct an error in the initial document b.
To remove inconsistencies between the initial document and planned submittals of requests for exemptions from the requirements of Appendix J and planned modifications to permit testing in accordance with Appendix J To inc1nde the recently installed Nitrogen Recirculation System c.
Attached are 40 copies of a revision to Reference (a) and 40 copies of a revision to Reference (b). None of these changes affect the intent or the substanco of the original submittals.
Yours very truly, l
L 0 Mayer, PE l
Manager, Nuclear Support Services LOM/ RIM /de'a i
cc:
J G Ks.ppler MECCA G Charnoff Attn:
H J Vogel 7; ~/u MPCA City of St. Paul
~
Attn: J W Ferman Attn:
D L Ficker 9102110381 760504 3 J Cadler PDR ADOCK 05000263 l
P PDR 1
.=
s
, e L'
j May 4, 1976 Revision to letter dated September 19, 1975 in.e. Mr L 0 Mayer, NSP to Mr K R Coller, UsiRC. "Monticello Compliance with the Requirements of 10CFR50 Appendix J" Replace Table 2 of the September 19, 1975 letter with the attached revised Table 2.
Changes in the original table arc indicated with lines in the margin.
- 1he following additional containment penetrations, which have been construed to require testing in accordance with Appendix J, are not testable.
Refer to Table 2.
Description Type Teg Reason Not Testable X-20 Demin Water Supply C
No test connection X-21 Service Air Supp1; C
No test connection X-29E Drywell Pressure B
No provision for testing 6
Sensing Lines X-29F X-32C Drywell Flood Level B
No provision for testing Sensing Line X-60E Drywe,11 Pressere B
No provision for testing Sensing Lines Y-50F X-206A Torus Instrumentation B
No provision for testing thru X-206D X-209A Torus Instrumentation B
No provision for testing thru X-209D X-229B Instrument Air to Torus C
No test connection
2 It has also been determined that there are several cases where primary containment isolation valves are leakage tested with the inboard valve pressurized in a direction Opposite to the direction of pressurization following an accident.
Test connections at Monticello have generally been provided in the connecting volume between the inboard and outboard isolation valves. The coanecting volume is pressurized and the pressure decay rate is measured.
In some cases there is no other provision for testing the inboard isolation valve.
The following penetrations can only be tested with at least one valve subjected to pressure in the opposite direction (refer to Table 2):
Type Valve X-18 Floor Sump Globe X-19 Equip Sump Globe X-25 Drywell Vent Butterfly X-26 Drywell Vent Butterfly X-27D 02 Analyzer Globe X-27E O Analyzer Globe X-27F 0 Analyzer Globe X-39A Drywell Spray B Gate - Wedge Type X-39D Drywell Spray A Gate - Wedge Type X-41 Coolant Sample Globe X-48 N2 Pumpback Globe X-205 Torus Vent Butterfly X-214 02 Analyzer Globe X-220 02 Analyzer Globe Except in the case of penetrationc X-39A and X-39B, testing of these valves in the reverse direction is permissible under the provisions of Section XI, Subsection IWV, of the ASME Code.
l
~
1 T&ble 2 lbnticello Containment Penetrations Pa6e 1 of Ik I
Penetration Applicable Appendix IT.TSR BARRIER OUTER BARRIER Dasignation Description J T,e Test Desi6 nation Type Testet17 les16 nation Iype Iestetil 1
Seismic Restraint B - Section II.G.1 1
Yes I
Port A l
i r
l t
Seismic Restraint B - Saction II.G.1 1
Yes i
Port B I
i Seismic Restraint B - Section II.G.1 1
Yes Port C
+
t Seismic Festraint B - Section II.G.1 1
Yes Port D
[
Seismic Festraint B - Section II.G.1 1
Yes Port E i
j Seismic Restraint B - Section II.G.1 1
Yes
[
t Port F i
Seismic Pestraint B - Section IL G.1 1
Yes I
Port G r
1 j
Seismic Festraint B - Section II.G.1 1
Yes Port H Dryvell Head B - Section II.G.1 1
Yes p
M
[
i H
w N
I f
4
i
~
t Table 2 tbnticello Containment Penetrations Page 2 of 14 l
g Penetration Applicable AppendLx INTIER BARRIEH OUTER BARRIER l
Dzsigration Description J Test Type Designation 1ype Tested 2 Designation
'R/pe TestedT i
t 1
1 X-1 Equipment Hatch B - Section II.G.1 1
Yes
\\
fl' X-2 Air lock B - Section II.G.2 Yes X-3 Not Assigned Ibne g
X-4
- Head Access Hatch B - Section II.G.1 1
Yes X-5A - 5H Drywell-Torus Ibne (Note 7)
Vent Pipes I
X-6 CED Access Hat;:h 4 B - Section II.G.1 1
Yes i
X-7A Bellows B - Section II.G.1 2
Yes Primary Steam Line A C - Section II.H.4 A0-2-80A 3
Yes A0-2-86A 3
Yes
( Note 1)
X-7B Bellows B - Section II.G.1 2
Yes
[
l Primary Steam Line B C - Section II.H.h A0-2-80B 3
Yes A0-2-86B 3
Yes (tbte 1)
X-7C Bellows B - Section II.G.1 2
Yes
)'
M Primary Steam Line C C - Section II.H.h A0-2-80C 3
Yes A0-2-86C 3
Yes 7
(Tbte 1) 9 X-7D Bellows B - Section II.G.1 2
Yes CN l
Primary Steam Line D C - Section II.H.h A0-2-80D 3
Yes A0-2-86D 3
. Yes (Note 1) i X-8 Bellows B - Section II.G.1 2
Yes Primary Steam Drain C - Section II.H.h MO-2373 4
Yes M0-2374 4
Yes l
J x
i L
i' Table 2 Monticello Containment Penetrations '
Pa6e 1 of M
{
+
Penetration Applicable Appendix-INNER BARRIER OUTER BARRIER
'J T pe Test Designation Type Ibsted?
Designation Type Testedi i
I Dasignation Description
/
t
.i i
X-9A Bellows B - Section II.G.1 2
Yes i
L l
Feedwater Line C - Section II.H.h W-97-2 5
Yes W-94-2 5
Yes l
X-9B Bellows B - Section II.G.1 2
Yes i
f i
Feedwater Line C - Section II.H.h W-97-1 5
Yes W-94-1 5
Yes t
X-10 Bellows B - Section II.G.1 2
Yes r.
i.
Steam to RCIC C - Section II.H.h MD-2075 h
Yes MO-2076 h
Yes l
I X-11 Bellows B - Section II.G.1 J 2
Yes t
l Steam to HPCI C - Section II.H.h MO-203h 4
Yes MO-2035 h
Yes
[
)
i 1
i X-12 Bellows B - Section II.G.1 2
Yes j
i RHR Supply C - Section II.H.3 Mc-2029 h
Yes Mo-2030 1
Yes l
X-13A
' Bellows B - Section II.G.1 2
Yes i
l LPCI to B Ioop C - Section II.H.3 A0-10-h6B 6
Yes MO-2015 4
Yes
[
x f
X-13B Bellows B - Section II.G.1 2
Yes E
[
v i
LPCI to A Loop-C - Section II.H.3 Ao-lo 46A 6
Yes MO-201h k
Yes
'O cs X-lh Bellows B - Section II.G.1 2
Yes e
i RWCU Supply C - Section II.H.2 Mo-2397 h
Yes MO-2396 4
Yes
(
X-15 Spare Penetration None 17 l
[
l
[
t e
I i
I
~
e,.
Table ?
Monticello Containment Penetrations Page 4 of lh i
Penetration Applicable Appendix INNER BARFTRR OUIER BARRIER J P pe Test Designation Type Asted?
Desi6 nation Type TestedT Dasignation.
Description.
/
l j
X-16A Bellows B - Section II.G.1 2
Yes Core Spray' B C - Section II.H.3 A0-lh-13B 6
Yes Mo-175h h
Yes ll I
j X-16B Bellows B - Section II.G.1 2
Yes l
Core Spray A C - Section II.H.3 AO-14-13A 6
Yes MO-1753 h
Yes I
X-17 Bellows B - Section II.G.1 2
Yes 1
l.'
Head Cooling C - Section II.H.2 M0-2027 4
Yes MO-2T6 4
Yes 1
i l
X-18 Floor Sump Discharge C - Section II.H.2 A0-25hlA 7
Yes a
i i
AO-2541B 7
Yes 4
{
X-19 Equip Sump Discharge C - Section II.H.2 AO-2561A 7
Yes
[
A0-2561B 7
Yes l
X-20 Demin Water Supply C - Section II.H.1 IE-57 8
No DM-58 8
No i
X-21 Service Air Supply C - Section II.H.1 AS-39 8
No i
I i
AS-hO 8
Ib i
i t
i X-22 Instrument Air C - Section II.H.3 cv-lh78 9
No I
X-23 RBCCW to Drywell C - Section II.C.3 RBCC-15 5
No l
l X-24 RBCCW from Drywell C - Section II.C.3 MO-lh26 h
No s
I w
t 5
N
[
~
Table 2 tbnticello Contairunent Penetrations Page 5 of1h Penetration Applienble Appendix I?CER BARRIEH OUTER BAPRIER Easignation Description J Type 'Ibst Designation
~1ype Tested'?
Lesignation Type Testedi 1
X-25 Dryvell Ventilation C - Eaction II. H.1 AO-2386 10 Yes Exhaust A0-2387 10 Yes i
CV-2389 9
Yes X-26 Drywell Ventilation C - Cection II.H.1 A0-2377 10 Yes Supply AO-2 381 10 Yes CV-3268 9
Yes CV-3269 9
Yes X-27A - 27C Instrumentation ibne ( Note 3) 18 3
l CV-3305 9
Yes i
X-27D Oxygen Analyzer C - Section II.H.1 Sa=ple Point CV-3306 9
Yes X-27E Oxygen Analyzer C - Section II.H.1 CV-3307 9
Yes Sample Point CV-3300 9
Yes X-27F Oxygen Analyzer C - Gection II.H.1 CV-3309 9
Yes Y
Sample Point CV-3310 9
Yes
?
cl
Table 2 f4onticello Containment Penetrations Page 6 of lh Penetration Applicable Appendix ITINER BARBIEP OtrTER RARPIER Dzsignation Description J Type Test Designation Type Ibsted?
Designation Type Tested?
X-28A - 28F Instrumentation Tbne (Nate 3) 16 X-29A - 20D Instrumentation None (Note 3) 16 X-29E - 29F Instrumentation B - Cection II.G.h 19 No (rete 8) l X-30A - 30F Cpare Penetrations None 17 18 X-31A,B,D,E,F Instrumen mtion None (Note 3)
X-31C Spare Penetration None 17 X-32A,B,D,E,F Instrumentation None (Note 3) le l
No X-32C Dryvell Flood IcVel Sv B - Section IL G.h la (Note 8)
X-33A - 33F Instrumentation None (tbte 3) 18 X-3hA - 3hF Spare Penetintions None 17 l
X-35A,B,C TIP Probes (Note h)
C - Gection II.H.2 TIP 1,2,3 15 No X-35D Spare Penetration Ib n.-
17 X-35E TIP Purge Supply C - Cection II.H.2 Purge Check 5
No t-Purge SV 16 To 5#
4 j
r hble 2 tbuticello Containment Penetrations Page 7 orlh A plicable Appendix INNER BARRIER OUTER BARRIER P
Penetration Designation Description J Type hst tusignation
'lype Tested?
Designation Type Tested 7 l
}
i X-36 CED Hydraulic Return C - Section II.H.2 CRD-3h 5
- b CRD-31 5
Yes f
i I
X-37A 12 Rectre Seal Inj C - Section II.H.3 XR-27-2 5
Yes XR-26-2 5
Yes X-37A - 37D CRD Insert Lines None (tbte 5) j j
X-38A 11 Recire Seal Inj C - S~ction II.H.3 XR-27-1 5
Yes XR-26-1 5
Yes X-38A - 38D CRD Vithdraw Lines None (Note 5) l X-39A Drywell Spray B C - Section II.R.1 MO-2021 h
Yes MO-2023 h
Yes X-39B Dryvell Spray A C - Section II.H.1 MO-2020 h
Yes MO-2022 A
Yes X h0AA - 40DF Inst rumentation Ibne (tbte 3) 13 X-k1 Recire loop B Sa:::ple C - Section II.H.2 CV-2790 9
Yes CV-2791 9
Yes X-42 Standby Liquid Control C - Section II.H.2 XP-7 5
Ib XP-6 5
Yes j
X h7 Spare Penetrations Ibne y
X 48 N2 Pumpback Suction C - Section II.H.1 CV-7h36 9
Yes CV-7437 9
Yes X-h9A - 49F Instrumentation Ibne (Ibte 3) 18
[
j X-5GA - SOD Instrumentation Ibne (Ibte 3) 18 X-50E - SOF Instrumentation B - Section II.G.h 19 tb M
(Note 8) 7I X-51A - 51F Instrumentation.
Ibne (Note 3) 18 y
i
- n e
X-52A - 52F Instrumentation None (Note 3) 18 X X-99 Not Assigned None I
[
a I
~
Table 2 Monticello Containment Penetrations Page 8 of 1h t
Penetration Applicable Appendix INNER 3ARRTTR OIFPRn MannTro i
Designation Description J Type Test Designation Type Tested?
Designation P pe Testedi f
l X-100A - 100D Electrical Penetration B - Section II.G.1 11 Yes X-100E Spare Penet, ration None 17 i
X-101A,101C Spare Penetrutions None 17 X-101B,101D Electrical Penetration B - Section II.G.1 11 Yes
^
f 17 X-102 Spare Penetration Ibne X-103 Electrical Penetration B - Section II.G.1 11 Yes l
i X-104A-- 104D Electrical Penetration B - Section II.G.1 11 Yes X-104E Spare Penetration None 17 l
f X-105A,105C, Electrical Penetration B - Section II.G.1 11 Yes l
105D X-105B Spare Penetration None 17 t
X-106 Spare Penetration None 17 X-107 Spare Penetration None 17 t
X-108 - X-199 tbt Assigned None I
l L
X-200A Torus Hatch (h50)
B - Section II.G.1 1
Yes l
M
.V X-200B-Torus Hatch (225 )
B - Section II.G.1 1
, Yes p
i 0
X-201A - 201H Ibrus Vent Pipes None (Note 7)
O X-202A,B,C,D, Dryvell-Torus None (Note 7)
E,F,G,H, Vacuum Breakers J,K I
j
1hble 2 Monticello Containment Penetrations Page 1 of lh Penetration Applicable Appendix IIMER HARRIER OUTER BARRIER l
7 Designation Description J Type Test Desi nation Type.
Tested?
Designation Type Testedi 6
X-202I Not Assigned Ibne X-203 Net Assigned None 1
X-20hA - 20hD Torus Ring Header None (Ibte 7)
X-205 Tonis Ventilation C - Section II.H.1 AO-2383 10 Yes Exhaust and Supply to i
Nitrogen Becirculation C7-2384 9
Yes I'
System CV-74hO 9
Yes AO-28;6 10 Yes i
X-206A - 206D Torus Instmmentation B - Section II.G.h 19 Ib (Ibte 8)
X-207A - 207H Torus Vent Pipe Drains Ibne (Mote 7)
X-206A - 208H Relief Valve Discharge Ibne (tbte 7)
Pipes I
X-209A - 209D Torus Instrumentation B - Saction II.G.4
~
I 19 Ib j
(Ibte 8)
X-210A RHR and Core Spray B None (Note 9)
RHR-8-2 5 ~
f Test Line to 1brus MO-2007 h
r MO-2009 12 J
M MO-1750 12 E
I-w.
I C3-10-2 13 3
m y
I
[
I 1
o
Table 2 Monticello Containment Penetrations Page 10 of ik Penettstion Applicable Appendix IIENER BARhIEH OtTIER BARRIER f
Designation Description J Type Test Lbsignation Type Ibsted?
Designation Type TestedT X-210B FlIR and Core Spray A Hone ( Tbte 9)
Test Line to Tbrus RHR-8-1 5
MO-2006 4
MO-2006 12 MO-1749 12 CS-lO-1 13 t-X-211A HHR B lorus Sprny C-Section II.H.1 MO-2OG7 4
No MO-2009 12 No MO-2011 12 No i
i X-211B FJIR A Tcrus Fpray C - Section II.H.1
}O-2006 h
No t
i MO-2006 12 No MO-2010 12 No X-212 RCIC Turbine Exhaust C - Section II.H.1 RCIC-9 5
Yes i
t X-213A,213B Flanged Bottom 1brus None (Tbte 10)
Dmins k
X.214 Oggen Analyzer Return C - Se.ction II. H.1 i
CV-3313 9
. Yes 1
-o cv-331k 9
Yes X-215 - 216 Spare Per_etrations Ibne 17 M[
'o X-217 HPCI Exhaust Vac Bkr None (Ibte 11) f
- ~
t Thble.2 tbnticello Containment Penetrations Page 11 of Ik
~
Penetration Applicable Appendix INNEP BARRIEB OTTER BAPPTFR Designation Description J Type Test Designation lype Tested?
Lesignat:.on Type Tested 1 X-218 Torus-Heactor Building C - Section II.H.1 AO-2379 10 YES Vacuum Breakers INV-8-2 14 YES AO-2380 lo TES INV-8-1 1h YE3 X-219 RCIC Exhaust Vse Bkr Ibne (Ibte 11)
X-220 Oxygen Analyzer C - Section II.H.1 CV-3311 9
Yes Sample Point C.~-3312 9
Yes X-221 HPCI Turbine lhhaust C - Section II.H.1 HPCI-9 5
Yes X-222 HPCI Steam Line Drains None (Note 9)
HPCI-lk 5
HPCI-15 5
l 4
X-223 RCIC Steam Line Drains None (Tbte 9)
RCIC-16 5
RCIC-17 5
i t
X-224A RHR B Suction None (Note 9)
MG-1987 L
1 5
l X-22hB RHR A Suction None (Ibte 9)
MO-1986 L
?
X-225 HPCI Suction Ibne (Note 9)
MO-2061 4
wd*
no-2062 4
j
Table 2 tbnticello Containment Penetrations Page _12 of lh I
INNER BARRIER OCTER BARRIER Penetration Applicable Appendix Designation Ihscription J Type Test Designation Type Tested?
Designation
'Iype Tested 7 X-226A Core Spray B Suction Ibne ( Note 9)
FD-17k2 h
X-226B Core Spray A Suction Ibne (fbte 9)
Mo-17k1 4
~
X-227 RCIC Suction None (note 9)
MO-2100 4
l X-228 Not Assigned X-229 A, 3 pare Penetrations Ibne 17 l
X-229C - 229K l
X-229B Instrument Air to Torur C - Section II.H.1 CV-7956 9
Ib l
11 Yes X-230 Electrical Penetration B - Section II.G.1 l
l k
I i
x t-l 3
I
Table 2 tbnticello Cbatainment Penetrations Page 1,,,3 of 8 Explanation of Notes:
1.
Durirv:; refueling outages, when the vessel head is removed, MSIV's are tested by pressurization between valves. Since test pressure tends to uncent the inboard valve, a lover test presture than Pa is specified.
l 2.
Isolation is accomplished using manual valves in the containment supply line.
These valves are opened only when containment integrity is not required. The valves are closed in acconlance with valve lineup checklists which am completed prior to plant heatup.
i 3
One-inch instrumentation lines equipped with excess flow check valves. Subject to leakage testing in acconiance with Technical Specification L.7.D.l.b.
Icakage can occur only throu6h rupture of the line or its associated instrument outside of contniranent.
L 4
TIP probes are withdrawn on a containment isolathu signal and the line is isolated by autocatic closure of a ball valve. A shear valve can be manually netuated fmm the Control Room in the event a probe fails to retract. A solenoid valve in the purge supply line automatically closes on a containment isolation signal.
5 Containment isolation of the CRD hydraulic control lines is accomplished with a ball check valve internal to each drive mechanism and the nomally closed hydraulic system control valve.
6.
The dryvell air lock is constructed with both doors opening inward so that containment pressure. will tend to seat the door seals. During overall air lock pressure tests, a support r. :mber is installed on the inner door to prevent the door from being forced open.
7.
These are internal penetrations between sections of the containment structura.
8.
Instrumentation lines not equipped with excess flow check valves.
the line or its associated instrument outside of containment.
Leakage can occur only through rupture of 9
This penetration terminates at the bottom of the suppression pool.
It is not exposed to the containment atmosphere.
g t
c-
- 10. 'Ibese drains are installed at the bottom of the suppression pool.
U
- 11. The HPCI and RCIC steam exhaust line vacuum breaker penetrations utilite the HPCI and RCIC steam exhaust M
line check valves for containment isolation.
l
Table 2 bbnticello Containment Penetrations Pa6e IL of lh Barrier Type Codes 1
Double gasketed seal l
2 Hot pipe expansion bellows I
3 Air operated globe valve 4
Motor operated gate valve 5
Testable check valve 7
Air operated gate valve 8
hhnual gate valve 9
Diaphran:1 air operated control valve 10 Air opemted butterfly valve 11 Electrical penetmtion 12 bbtor operated globe valve 13 lhnually operated globe valve 14 Self-setuating vacuum breaker 15 Ball Valve 16 Solenoid Valve 17 Spare Penetration - we]ded cap 18 Instmment Line with excess flow check valve 19 Instrtment Line without excess flow check valve I
w
?
E l
May 4, 1976 Revision to License Amendment Request Dated January 30, 1976 Replace D.hibits A and B in their entirety with the attached revised Exhibits A and B.
Changes in the Exhibit A are indicated with lines in the margin.
l l
l
._