ML20024G318

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-22 to Comply W/Request to Stipulate in Tech Specs,Means by Which Safety/Relief Valve Operability Verified
ML20024G318
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/08/1977
From: Wachter L
NORTHERN STATES POWER CO.
To:
Shared Package
ML20024G317 List:
References
A00L-770308, AL-770308, NUDOCS 9102110291
Download: ML20024G318 (2)


Text

_..

L.'

O O

l 6

1

-UNITED STATES NUC12AR REGUIATORY COMMISSION ll.7

-NORIMERN-STATES POWER COMPANY MONTICELLO NUCIIAR GENERATING PIANT Docket No. 50- 263 REQUEST FOR AMENIMENT TO

(

OPERATING LICENSE NO. DPR-22 Yl (License Amendment Request Dated March 8,1977) l Northern States Power Company, a Minnesota corporation, requests authorization for changes to the Technical Specifications as shown on the attachments labeled Exhibit A and Exhibit B.

Exhibit A describes j

the proposed changes along with reasons for the change. Exhibit B is a set of Technical Specification pages incorporating the proposed changes.

l-This request contains no restricted or other defense infonnation.

NORTHERN STATES POWER COMPANY e

l.

By M <~7MMd l

PL J Wachter ~ ~ ~

]

Vice President, Power Production &

System Operation f

On this 8th day of March

, 1977,- before me a notary public in and fc-said County, personally appeared L J Wachter, Vice President, Power Production & System Operation, and first being duly sworn acknowledged that _he is authorized to execute this document in behalf of Northern States Power Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay.

l

.....:.. :.:... : :: m ::. :.

ll DENISE E. HALVORSON

!{'

NOTARY PutuC MWea00Ta HENNEPIN COUNTY My conunheien raswa om is,1esi ;

]

9102110291 770308 PDR AEOCK 05000263 P

PDR n

m,-

---i,-

,e m.

,---?

-a.

-w,-.

y.+

EXHIBIT A p

e

-- MONTICELLO NUCLEAR GENERATING PIANT -

}

DOCKET NO. 50-263 LICENSE AMENDMENT REQUEST a

DATED MARCH 8, 1977

' PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS, APPENDIX A 0F PROVISIONAL:

j OPERATING LICENSE DPR-22 Pursuant to 10.CFR 50.59, the holders of Provisional Operating License DPR-22

.l x hereby. propose the following change to the Appendix A Technical Specifications:

Specification 4.5.E.1 - Automatic Pressure Relief System PROPOSED CHANCE j.

Insert the following words at the end of Specification 4.5.E.1:

4

" NOTE: Safety / relief. valve operability is verified by 4

cycling the valve and observing a conpensating change in the turbine bypass valve position".

tj REASON FOR CHANGE This wording is added at the request of the NRC in a January 5,1977 letter frca l-Mr D L Ziemann. It defines. the basic nature of the surveillance test to demon-strate valve operability.

l.'

- SAFETY EVALUATION-1 Wile the: addition of these words is technically a change to Specification 4.5. E.1, it in no way changes the intent. The additional words merely. document 4

i the manner in which this-surveillance test has been performed in the past to i

comply with the existing requirement for valve -operability testing.

1 The capacity of each safety / relief valve at the self-actuating setpoint is approximately 127. of' rated steam flow; the turbine bypass valves are sized for

.} -

.a total of 157, of rated steam flow. The test procedure calls for manually opening P

' and closing' each safety / relief valve while at pressure. With the pressure

.[

regulator 'setpoint held constant and the bypass valves. initially open, the L

cycling of. the safety / relief valves will cause the bypass valves to close and.

L reopen to compensate for the steam loss to the turbine. Wile this is not an

- attempt to calibrate the safety / relief valve flow, it is a very adequate demon-r I

stration of valve operability.