Text
-
I,.,.,
,,e e.
.. -- ~
y y l
MS5s NOHTHERN 5TATES POWER COMPANY M I N N E A p* O L i e, M t N N g s ot A agaog g
[,' A j,A
/N.
[N August 15, 1975
. (-
/n t ja (Q G \\..
W
, N.o g
gg81W D
.., z yr J
Mr A Giambusso, Director "l
Division of Renc*or Licensing
- " g cy
,,, r U S Nuclear Regulatory Commission a-
,k Washington, DC 20555 4,x
_.,y. )j Q's i w y
~~
Dear Mr Giambusso:
!!ONTICELLO NUCLIMR GENERATING PIMT Docket No. 50-263 License No. DPR-22 License Amendment Kequest Dated August 15, 1975 for a Attached are three signed originals and 37 conformed copics of a request change of Technical Specifications, Appendi:e A, of Operating License DPR-22.
is submitted in response to a letter dated July 11, 1975, from This request
- . Dc nnia L gic~. nn, Chief, Op rating Reactors Branch 2, Directorate of Licensing, USNRC, which requested that we submit an application for an amendment to our cent aining proposed technical specifications covering operability and license surveillance of hydraulic snubbers on saf ety relat.ed systems.
The model technical specifications included with the July 11, 1975, NRC Ictter, and those proposed herein, contain a requirement that the initial inspection of hydraulic snubbers shall be performed within 6 months from the date of issuance of the technical specifications. A refueling outage is scheduled at the Monticello Suc1 car Plant commencing September 12, 1975, and an inspection of saftty rclattd hydraulic snubbers ulll bt conducted during that outage.
In order that we might avoid an unnecessary subu quent outage solely for performance of is requested that the license amendment be issued the initial inspection, it prior to September 12, 1975.
If this schedule cannot reasonably be accommodated, the license amendment authorize use of the September-October, is requested that it snubber inspection for compliance with the initial inspection requirement 1975 and entry into the teble of inspection intervals.
verbally connunic ated ou: coments to the Regulatory Staff on the in-We have flexibilities created by inclusion of tables of either safety related or non-safety related snubbers in the Technical Specifications, which can be changed
- ormal License Ameno w nt piocedure. We have summarized thene only by thealong with a suggested alternate approach, in the explanation of the
- comments, proposed icchnical Specification changes.
During those discussions, we were asked to subnit a separate list of non-safety related snubbers; these are listed in Attachment A to this letter.
9102000464 750015 9^'
PDR ADOCK 05000263 P
Nt 4THERN CTATEO POWER w MPANY Mr A Giambusso Page 2 August 15, 1975 This License Amendment Request has been reviewed by the Monticello operations Corxtittee and the Monticello Safety Audit Committee. We have concluded that the proposed changes do not involve an unreviewed safety question.
Yours very truly, J
L 0 Mayer, PE Manager of Nuclear Support Services LOM/ak cc:
J G Keppler G Charnoff PJnnesota Pollution Control Agency Attn:
J
'.? Pe rman MECCA Attn: H J Vogel City of St Paul Attn: D L Ficker S J Gadler Attachments
1 I
ATTACINENT A (NSP to NRC Letter Dated August 15, 1975)
Monticello Nuclear Generating Plant Tabulation of Ifydraulic Snubbers that are not Safety Related Snubber No.
location - System - Elevation SS-43*
Southeast Condenser Area - Off Cas System (Dilution Steam) 917' SS-44*
Southeast Condeneer Area - Of f Gas System (Dilution Steam) 914' SS-9*
RFP Area - Feedwater 927' SS-9A*
East Condenser Area - Feedwater 924' SS-9B*
East Condenser Area - Feedwater 924' SilP-101-SS1*
West Turbine Mezzanine Area-Off Cas (Dilution Steam) 945' RV-27-II?**
Drywell - Safety Relief 945' Az 2700 All thcae snubbers are outside of primary containment isolation and are loc ated on sections of piping that are not safety related.
This snubber was listed in the October 1,1974 letter from L. O. Mayer of NSP to J. F. O' Leary of AEC as being in place on a Safety / Relief line; it has since been removed.
, - -,,, -