Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217C6191999-09-30030 September 1999 Application for Amend to License DPR-22,changing Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys. Change Would Eliminate Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20203A3221999-01-28028 January 1999 Suppl 3 to 971125 LAR to License DPR-22 Re CST Low Level Hpci/Rcic Suction Transfer.Suppl Replaces TS Page 60d,to Include Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1271998-12-31031 December 1998 LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20195C8911998-11-11011 November 1998 Supplemental Application for Amend to License DPR-22, Allowing Removal of One CST from Svc for Maint ML20154L9401998-10-12012 October 1998 Suppl 2 to LAR to License DPR-22,revising Statement on Normal Shift Length & Correcting Typos ML20154L8991998-10-0909 October 1998 Suppl 1 to LAR to License DPR-22,replacing Exhibits B & C of Original Submittal to Reflect Item 2 ML20153F0161998-09-25025 September 1998 Suppl 1 to LAR for Amend to License DPR-22, Replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Re Condensate Storage Tank Low Level Hpci/ RCIC Suction Transfer ML20249C5091998-06-19019 June 1998 Rev 2 to LAR Dtd 960726,requesting Changes to Ts,App a Sections 3.6.C & 3/4.17.B & Associated Bases.Proposed Changes Are to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of MSLB Accident ML20216D2891998-03-25025 March 1998 Application for Amend to License DPR-22,providing Suppl 1 to 980313 Amend Request Re Plant Cycle 19 SLMCPR ML20216C9931998-03-19019 March 1998 Suppl Application for Amend to License DPR-22,requesting Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L1951998-03-13013 March 1998 Application for Amend to License DPR-22,revising TS Re Safety Limit Minimum Critical Power Ratio ML20202H6861997-12-0404 December 1997 Rev 1 to Application for Amend to License DPR-22,increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9531997-11-25025 November 1997 Application for Amend to License DPR-22,revising Tech Specs for Condensate Storage Tank Low Level Suction Transfer Setpoint for HPCI & RCIC Sys ML20210Q2881997-08-21021 August 1997 Suppl to 961125 Application for Amend to License DPR-22, Revising Page 6 of TS to Add Statement Re MCPR Values Applicable to Cycle 18 Only ML20141B9111997-06-19019 June 1997 Rev 2 to Application for Amend to License DPR-22,addressing Use of Containment Pressure for Assuring Adequate Net Positive Suction Head for ECCS Pumps Under worst-case Conditions ML20138F8661997-04-29029 April 1997 Application for Amend to License DPR-22,providing Suppl to 961125 Amend Request Re Safety Limit Minimum Critical Power Ratio ML20137W2141997-04-11011 April 1997 Rev 1 to Application for Amend to License DPR-22 Re Reactor Coolant Equivalent Radioiodine Concentration & Control Room Habitability ML20136B5361997-03-0404 March 1997 Application for Amend to License DPR-22,updating Design Basis Accident Containment Temp & Pressure Response ML20149M7221997-01-23023 January 1997 Application for Amend to License DPR-22,requesting Authorization for Changes to App A,Clarifying TS 3.5/4.5.C Re Min RHR & RHRSW Pump Requirements for Post Accident & Update of Design Basis Accident Containment & Temp Response ML20132C6361996-11-25025 November 1996 Application for Amend to License DPR-22,revising Section 2.1.A,SLMCPR Value & Deleting Sentence from Section 3.11.C of OLMCPR Re Limit Penalty for Single Recirculation Loop Operation ML20117A4281996-08-15015 August 1996 Application for Amend to License DPR-22,requesting Authorization for Changes to App a of Plant License as Shown on Attachments Labeled Exhibits A,B & C ML20116D8161996-07-26026 July 1996 Application for Amend to License DPR-22,changing TS Sections 3.6.C Re Coolant Chemistry & 3/4.17.B Re CR Emergency Filtration Sys ML20116G8911996-07-26026 July 1996 Application for Amend to License DPR-22,proposing Increase Max Reactor Core Power Level by 6.3% to 1,775 Mwt from Current 1,670 Mwt.Request Also Changes TSs Based on Power Rerate Evaluations ML20100Q3761996-03-0101 March 1996 Application for Amend to License DPR-22,removing Surveillance Requirement Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4271995-12-21021 December 1995 Application for Amend to License DPR-22,revising Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7021995-12-11011 December 1995 Application for Amend to License DPR-22,removing SR 4.7.D.4 from Plant TS & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1941995-11-14014 November 1995 Suppl to 950815 LAR to License DPR-22,incorporating Requirements of Option B,Section Iii.A for Type a Testing (Primary Containment ILRT) Per Reg Guide 1.163 ML20091K6731995-08-18018 August 1995 Rev 2 to 940608 LAR to License DPR-22,re Section 3.7/4.7, SGTS ML20087J4211995-08-15015 August 1995 LAR to License DPR-22,revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D7981995-07-0505 July 1995 LAR to License DPR-22,revising TS to Extend Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0921995-06-22022 June 1995 Application for Amend to License DPR-22,revising TS to Support Implementation of BWR Thermal Hydraulic Stability Solution ML20082N8691995-04-20020 April 1995 Rev 1 to 940608 LAR to License DPR-22,deleting 18 Month Surveillance Frequency Re Automatic Initiation of Test Specified in SR 4.7.B.2.b(3) & Modifying LCO for Spec 3.7.C.4 Re Secondary Containment ML20069J1011994-06-0808 June 1994 LAR to License DPR-22,revising TS Section 3.7/4.7, SGTS Re SR to Operate SGTS Monthly as Well as Revising Performance Requirements for SGTS Filters & Process Stream Electric Heaters ML20065B6581994-03-28028 March 1994 Revised Application for Amend to License DPR-22, Incorporating Improvement in Wording Originally Submitted for TS Section 6.7, Reporting Requirements, Re Identification of Approved Analytical Methods for COLR ML20065B6851994-03-28028 March 1994 Application for Amend to License DPR-22,changing TS Tables 3.2.4 & 4.2.1 Re SGTS Initiation Instrumentation ML20063C9821994-01-26026 January 1994 Application for Amend to License DPR-22,requesting Changes to Ts,To Require Valves Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8691994-01-0404 January 1994 Application for Amend to License DPR-22,revising TS Section 3.11, Reactor Fuel Assemblies by Removing Info Re Average Planar Linear Heat Generation Rate & Min Critical Power Ratio.Proposed Rev to Page 1 of 8 from COLR Encl ML20059E6011994-01-0303 January 1994 Application for Amend to License DPR-22,changing TS Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML20058G4311993-11-30030 November 1993 Application for Amend to License DPR-22,removing Chlorine Detection Requirements & Changing Control Room Ventilation Sys Requirments ML20056E1061993-08-10010 August 1993 LAR to Provide Clarification of Sampling & Analysis Requirements,Update Liquid Effluent Sampling & Analysis Requirements & to Correct Typographical Errors in TS Section for License DPR-22 ML20045G6061993-07-0707 July 1993 Application for Amend to License DPR-22,revising Requirements for Monitoring RCS Leakage,Per NRC Guidance Provided in GL 88-01,Suppl 1 & NUREG-1433, BWR/4 Improved Sts. ML20128M7101993-02-12012 February 1993 Application for Amend to License DPR-22,changing Ts,To Increase Minimum Core Spray Pump Flow to More Conservatively Account for ECCS Bypass Leakage Paths ML1129708521982-07-0202 July 1982 to 760907 Application for Amend to License DPR-22,changing Tech Spec to Allow Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed ML1129708171981-03-19019 March 1981 Application for Amend to License DPR-22 Revising Tech Specs App a Re Reactor Protector Sys,Submitted as Revision 1 to 810206 Amend Request ML1129708131981-02-0606 February 1981 Application for Amend to Ol.Changes to Tech Specs Requested Per Encl Exhibits A,B,C & D ML20024G4151978-08-16016 August 1978 Application for Amend to License DPR-22,revising Tech Specs by Raising Permissible Setpoint of Eight Safety/Relief Valves Installed at Plant to 1,108 Psig ML20127H2001978-08-10010 August 1978 Application for Amend to License DPR-22 to Authorize Use of Partial Drilled Model for Plant ML20024G3731978-03-21021 March 1978 Application for Amend to License DPR-22,changing Tech Specs Re Partial Drilled Model for Analyzing Retrofit Fuel Design Scheduled for Fall 1978 Refueling Outage ML20024G3931978-03-20020 March 1978 Application for Amend to License DPR-22,clarifying Sections of Interim Radioactive Effluent Tech Specs ML20024G3991978-03-20020 March 1978 Suppl 1 to 770902 Application for Amend to License DPR-22, Changing Tech Specs to Permit Containment ILRT to Be Terminated in Less than 24 H 1999-09-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217C6191999-09-30030 September 1999 Application for Amend to License DPR-22,changing Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys. Change Would Eliminate Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20203A3221999-01-28028 January 1999 Suppl 3 to 971125 LAR to License DPR-22 Re CST Low Level Hpci/Rcic Suction Transfer.Suppl Replaces TS Page 60d,to Include Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1271998-12-31031 December 1998 LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20195C8911998-11-11011 November 1998 Supplemental Application for Amend to License DPR-22, Allowing Removal of One CST from Svc for Maint ML20154L9401998-10-12012 October 1998 Suppl 2 to LAR to License DPR-22,revising Statement on Normal Shift Length & Correcting Typos ML20154L8991998-10-0909 October 1998 Suppl 1 to LAR to License DPR-22,replacing Exhibits B & C of Original Submittal to Reflect Item 2 ML20153F0161998-09-25025 September 1998 Suppl 1 to LAR for Amend to License DPR-22, Replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Re Condensate Storage Tank Low Level Hpci/ RCIC Suction Transfer ML20249C5091998-06-19019 June 1998 Rev 2 to LAR Dtd 960726,requesting Changes to Ts,App a Sections 3.6.C & 3/4.17.B & Associated Bases.Proposed Changes Are to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of MSLB Accident ML20216D2891998-03-25025 March 1998 Application for Amend to License DPR-22,providing Suppl 1 to 980313 Amend Request Re Plant Cycle 19 SLMCPR ML20216C9931998-03-19019 March 1998 Suppl Application for Amend to License DPR-22,requesting Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L1951998-03-13013 March 1998 Application for Amend to License DPR-22,revising TS Re Safety Limit Minimum Critical Power Ratio ML20202H6861997-12-0404 December 1997 Rev 1 to Application for Amend to License DPR-22,increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9531997-11-25025 November 1997 Application for Amend to License DPR-22,revising Tech Specs for Condensate Storage Tank Low Level Suction Transfer Setpoint for HPCI & RCIC Sys ML20210Q2881997-08-21021 August 1997 Suppl to 961125 Application for Amend to License DPR-22, Revising Page 6 of TS to Add Statement Re MCPR Values Applicable to Cycle 18 Only ML20141B9111997-06-19019 June 1997 Rev 2 to Application for Amend to License DPR-22,addressing Use of Containment Pressure for Assuring Adequate Net Positive Suction Head for ECCS Pumps Under worst-case Conditions ML20138F8661997-04-29029 April 1997 Application for Amend to License DPR-22,providing Suppl to 961125 Amend Request Re Safety Limit Minimum Critical Power Ratio ML20137W2141997-04-11011 April 1997 Rev 1 to Application for Amend to License DPR-22 Re Reactor Coolant Equivalent Radioiodine Concentration & Control Room Habitability ML20136B5361997-03-0404 March 1997 Application for Amend to License DPR-22,updating Design Basis Accident Containment Temp & Pressure Response ML20149M7221997-01-23023 January 1997 Application for Amend to License DPR-22,requesting Authorization for Changes to App A,Clarifying TS 3.5/4.5.C Re Min RHR & RHRSW Pump Requirements for Post Accident & Update of Design Basis Accident Containment & Temp Response ML20132C6361996-11-25025 November 1996 Application for Amend to License DPR-22,revising Section 2.1.A,SLMCPR Value & Deleting Sentence from Section 3.11.C of OLMCPR Re Limit Penalty for Single Recirculation Loop Operation ML20117A4281996-08-15015 August 1996 Application for Amend to License DPR-22,requesting Authorization for Changes to App a of Plant License as Shown on Attachments Labeled Exhibits A,B & C ML20116D8161996-07-26026 July 1996 Application for Amend to License DPR-22,changing TS Sections 3.6.C Re Coolant Chemistry & 3/4.17.B Re CR Emergency Filtration Sys ML20116G8911996-07-26026 July 1996 Application for Amend to License DPR-22,proposing Increase Max Reactor Core Power Level by 6.3% to 1,775 Mwt from Current 1,670 Mwt.Request Also Changes TSs Based on Power Rerate Evaluations ML20100Q3761996-03-0101 March 1996 Application for Amend to License DPR-22,removing Surveillance Requirement Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4271995-12-21021 December 1995 Application for Amend to License DPR-22,revising Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7021995-12-11011 December 1995 Application for Amend to License DPR-22,removing SR 4.7.D.4 from Plant TS & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1941995-11-14014 November 1995 Suppl to 950815 LAR to License DPR-22,incorporating Requirements of Option B,Section Iii.A for Type a Testing (Primary Containment ILRT) Per Reg Guide 1.163 ML20091K6731995-08-18018 August 1995 Rev 2 to 940608 LAR to License DPR-22,re Section 3.7/4.7, SGTS ML20087J4211995-08-15015 August 1995 LAR to License DPR-22,revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D7981995-07-0505 July 1995 LAR to License DPR-22,revising TS to Extend Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0921995-06-22022 June 1995 Application for Amend to License DPR-22,revising TS to Support Implementation of BWR Thermal Hydraulic Stability Solution ML20082N8691995-04-20020 April 1995 Rev 1 to 940608 LAR to License DPR-22,deleting 18 Month Surveillance Frequency Re Automatic Initiation of Test Specified in SR 4.7.B.2.b(3) & Modifying LCO for Spec 3.7.C.4 Re Secondary Containment ML20069J1011994-06-0808 June 1994 LAR to License DPR-22,revising TS Section 3.7/4.7, SGTS Re SR to Operate SGTS Monthly as Well as Revising Performance Requirements for SGTS Filters & Process Stream Electric Heaters ML20065B6581994-03-28028 March 1994 Revised Application for Amend to License DPR-22, Incorporating Improvement in Wording Originally Submitted for TS Section 6.7, Reporting Requirements, Re Identification of Approved Analytical Methods for COLR ML20065B6851994-03-28028 March 1994 Application for Amend to License DPR-22,changing TS Tables 3.2.4 & 4.2.1 Re SGTS Initiation Instrumentation ML20063C9821994-01-26026 January 1994 Application for Amend to License DPR-22,requesting Changes to Ts,To Require Valves Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8691994-01-0404 January 1994 Application for Amend to License DPR-22,revising TS Section 3.11, Reactor Fuel Assemblies by Removing Info Re Average Planar Linear Heat Generation Rate & Min Critical Power Ratio.Proposed Rev to Page 1 of 8 from COLR Encl ML20059E6011994-01-0303 January 1994 Application for Amend to License DPR-22,changing TS Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML20058G4311993-11-30030 November 1993 Application for Amend to License DPR-22,removing Chlorine Detection Requirements & Changing Control Room Ventilation Sys Requirments ML20056E1061993-08-10010 August 1993 LAR to Provide Clarification of Sampling & Analysis Requirements,Update Liquid Effluent Sampling & Analysis Requirements & to Correct Typographical Errors in TS Section for License DPR-22 ML20045G6061993-07-0707 July 1993 Application for Amend to License DPR-22,revising Requirements for Monitoring RCS Leakage,Per NRC Guidance Provided in GL 88-01,Suppl 1 & NUREG-1433, BWR/4 Improved Sts. ML20128M7101993-02-12012 February 1993 Application for Amend to License DPR-22,changing Ts,To Increase Minimum Core Spray Pump Flow to More Conservatively Account for ECCS Bypass Leakage Paths ML1129708521982-07-0202 July 1982 to 760907 Application for Amend to License DPR-22,changing Tech Spec to Allow Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed ML1129708171981-03-19019 March 1981 Application for Amend to License DPR-22 Revising Tech Specs App a Re Reactor Protector Sys,Submitted as Revision 1 to 810206 Amend Request ML1129708131981-02-0606 February 1981 Application for Amend to Ol.Changes to Tech Specs Requested Per Encl Exhibits A,B,C & D ML20148N4531978-11-0606 November 1978 Amend 37 to Provisional Oper Lic DPR-22,changing Tech Spec to Improve Simmer Margin of Safety/Relief Valves ML20024G4151978-08-16016 August 1978 Application for Amend to License DPR-22,revising Tech Specs by Raising Permissible Setpoint of Eight Safety/Relief Valves Installed at Plant to 1,108 Psig ML20127H2001978-08-10010 August 1978 Application for Amend to License DPR-22 to Authorize Use of Partial Drilled Model for Plant ML20024G3731978-03-21021 March 1978 Application for Amend to License DPR-22,changing Tech Specs Re Partial Drilled Model for Analyzing Retrofit Fuel Design Scheduled for Fall 1978 Refueling Outage ML20024G3931978-03-20020 March 1978 Application for Amend to License DPR-22,clarifying Sections of Interim Radioactive Effluent Tech Specs 1999-09-30
[Table view] |
Text
. - - . - ~ . . - - - . . - . - . - - - - - . _ - - . . .
5' i
'D N' AmtvW o,ttr gn ,[*/} - 7,3 UNITED E'ATES ATOMIC 1%ERGY CQ011SS105 NORTilERN STATES POWER COMPANY ,
Monticello Nuclear Concrating Plant Docket No. 50-263 it REQUESI FOR AUT110RIZAT10N OF g A CilANGE IN TECIC11 CAL SPECIFICATIONS 9 '
0F APPENDIX A Q -
I li . V .1 s g
% i) ,
. .. . ?f? ^ . f.?? .
.? .; SEP2 01973> h
- k.L ATOuit togy C0wss;*,g ;
"gue's Ge
(Chance Request Dated September 13, 1973) 4 L
m Northern States Power Company, a Minnesota corporation, requests >
authorization for changes to the Technical Specifications as shown on the attachments labeled Exhibit A and Exhibit B. Exhibit A describes the proposed changes along with reasons for change. Exhibit B is a
, copy of the Tcchnical Specificationr. revised to incorporate the pro-posed changes.
This request contains no restricted or other defense information.
NORTilERN STATES POWER COMPANY ny ,,,
eC;, ' (" /
Wade Larkin Group Vice President - Power Supply 1
/-
On this / day of O G M h"', , 1973, before me a notary public in and for said County, personally appeared Wade Larkin, Group Vice President - Power Supply, and being first duly sworn acknowledged that he is avchorized to execute this document in behalf of Northern ,
States Powei Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay.
l (f p g7i ; c. ,
' J,, G, / '
. , jy
- /
/ f-
,. Y m .y=z s
' Q
,/ / Johnp1$Smith '
~
(/ Notary Public, llennepin' County, Minnesota r c l.
_ e .n... ,,
l '
3C,NN j. isk'.!YN l
%e.,y r,c o henr.r twy, van..ee. fj g
.. , c.,m.. .., ( n. ... m.o 3. n : c . 4,Q".gry f ,
1 - s .-
7 e m 9102000439 730913 l
PDR P
ADOCK05000 7100
. , - - . . _ . - - , , , - . . . . . _ - _ , - - . . _ . _ , , , . , c , _ _ , - , _ _ . . _ , _ _ . , , _ . , . _ . _ , , _ , _, . . . - _ . . ~ . _
=
l i
EX1tIBIT A MONTICELLO NUCLEAR G12iERATING PLANT DOCrET No. 50-263 CllANGE REQUEST DATED SEPintBER 13, 1973 PROPOSED CllANCES TO TlIE TECilNICAL SPECIFICATIONS AP1'END1X A 0F PROVISIONAL OPERATING LICl2;SE NO. DPR-22 Pursuant to 10CFR50.59, the holders of the above-mentioned license hereby propose the following changes to Appendix A, Technical Specifications.
- 1. PROPOSED CllANGC On page 16, Bases: 2.1, first paragraph, fourth line, change
'(4,5)" t o read "(4,5,6,7 ) . "
On bottom of page 16, nC "(6) Supplen.ent on Transient Analyses submitted by NSP to the AEC, February 13, 1973" and "(7) Le t te r from NSP to AEC, ' Planned Reactor Operation From 2000 Mh'D/T to End of Cycle 2,' dated August 21, 1973."
REASON FOR CllANCI:
This will document in the Technical Specifications the additional studies completed on the ef fects of operational transients.
- 2. PROPOSED CIIANCE I
On page 20, Bases: 2.3.A, end of third paragraph, change " ....
page 22." to read " .... page 18."
On page 21, Bases : 2.3.B, end of second paragraph, change " ....
page 22." to read " .... page 18."
On page 21, Bases: 2.3. C, end of fourth paragraph, change " . . . .
page 22." to read " .... page 18."
On page 26, Bases: 2.4, third parai,raph, third and sixth lines, chan);c " . . . . page 22. " t o read " . . . . page 18 "
REASON FOR CllANCE These chanres correct typographical errors.
" i EX111g1T A 2
- 3. pi;Op051;D CilANGC
- On page 24, liases: 2.2, move the last paragraph to the top of page 25.
REAS(U FOR CilANCn To have all of this paragraph on the same page.
- 4. pHop0Sr0 CilANGC i l
On page 23. T.S.2.4.C, change "2 valves at $1210 psig " and "2 i valves at s 1220 psig." to read "4 valves at.4._.1260 psig." j
- On page 25,11ases : 2.2, in the second sentence, delete the words "f rom ra ted power. " In the third sentence, change " . . .. is 1183 psig." to read " .... is limited to 1214 psig." In the fif th sentence, change " .... to 1283 poig .... " to cad " .... to 1308 psig .... "
- on page 26, baset.: 2.4, second pa ragraph, line 8, change " ....
about 1283." to read " .... about 1308 poig." On line 10, change
" . . . . o f f ive valves (i safety valves and 3 dual purpose safety / )
relief valves) set . . . . " to read " . . . . of eigh t va lvu. (4 safety l valves and 4 dual purpoce safety / relief valves) set .... " l
- 9n page 110, T.S.3.6.1;.1, fourth line, change " .... three safety valves .... " to read " .... four safety valves .... "
- On page 119, T.S.4.6.E.1, last sentence, delete everything af ter
" . . . . nominal popping point of the .. . . " (including tabulation) and add " .... f our safety valves shall be set at 51240 psig "
On page 134, lases: 3.6.E/4.6.E, last paragraph, line 4, change
" .... to total 507. (357. relie f end 157. saf ety) of . . . . " to read
" . . . . to total 83.97. (t 77 relie f and 36.97, safety) of . . . . " on line 5, change " .... assuming that th'ce of the four relicI/ safety valves (357.) and tvo of the four safety valves (187.) operateJ." to read " . . . . assuuting that four safety / relief valves (477.) and four safety valves (36.9%) operated." Delete the last sentence of the paragraph.
J G
l* ,
e
,}
EX111DIT A
. l REASON FOR CHANGE I 1
The transients discussed in our February 13, 1973 submittal were reana- ,
lyzed as reported in our letter to the AEC entitled, " planned Reactor l Operation From 2000 MWD /T to the End of Cycle 2," dated August 21, '
1973. The reanalysis examines the effects of a change in the scram reactivity insertion rate which takes place with increasing exposure and results in higher peak pressures during transients. These changes to the Technical Specifications reficct the assumptions and results of_
the reanalysis plus additional analysis performed subsequently. One of the objectives of the analysis was to examine means of extending Cycle 2 operations at power levcis closer to rated after the limiting exposure threshold is reached. With the proposed increase in safety valve set-tings, the recocracnded 25 psi margin betwcon the transient peak is not compromised by a turbine trip without bypass with all rods out at 917.
of rated power. When the limiting exposure threshold is reached, con-trol rods will be maintained in a fixed pattern which will result in a power coastdown. The power coastdown will continue to the power thres- l hold (i.e. 917.) ,af ter which additional control rods can be withdrawn to maintain power no grectcr than 911,
- 5. PROPOSED CRANCE On pcge 85, Bases: 3.3.c/3.4.C, line 8, change the sentence beginning with "The limiting powc: transient .... " to read " The limiting operational transient is that resulting from a turbine stop valve closure with iailure of the turbine bypass system."
REASON FOR CilANCE This change restores the original statement erroneously changed in our Technical Specification Change Request Dated June 1, 1973. The MS1V closure with indirect scram is not an operational transient as defined in the FSAR since multiple failures are assumed to occur. The FGIV closure with indirect scram is studied only to satisfy code require-ments for cafety valve sizing.
6 PROPOSED CilAIE On page 134, bascr: 3.0 E/4.6.E, first paragraph, line 3, change
" ... 11% of design pressure." to read " ... 11% of the set pres su re.
REASON FOR CRANGE
.This change correctly states the pressure from which the tolerance band of the safety and scfety/ relief valves is determined.