| Site: | Monticello |
| Issue date: | 07/23/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wachter L NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20024G142 | List: |
| References | |
| NUDOCS 9102070584 | |
| Download: ML20024G141 (2) | |
See also: IR 05000263/1974005
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~
~ -~~ ~
,y [{ { j y $[,,[
,
- D
g
UNITED STOTES
.
,
.l
l Q.
ATOMIC ENERGY COMMISSION
I
QL
y*
DIRECTORATE Of" RrGULATORY OPEH ATIONS
4, #'8 m O
v
p
Rt'GION til
799 ROOSEVrLT ROAD
nur ma
GLEN rLLYN. ILLINOlf4 ao137
(312)858-2880
JUL 2 3 1974
,
<
<
,
Northern States Power Company
Docket No. 50-263
ATTN
Mr. Leo Wachter, Vies President
Power Prodestion and System
Operation
414 Nicollet Mall
Winnaspette, Mimaneeta 35401
Gentlemen
This refers to the inspection conducted by Mr Sutton of this office on
June 18,1974, of activities at the Monticello plant authorised by AEC
Operating License No. DPR-22, and to the discussion of our findings with
Mr. Larson of your staff and with Hasers. Harason and Swedberg of
Mr. Dienhart's staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
consisted of a selective examination of procedures and representative
recorda, interviews with plant personnel, and observations by the inspeeter.
l
s
The inepector also examined actions you have taken with respect to the
matter identified in your letter of June 3, 1974, which we previously
brought to your attention.
We have no further questions regarding this
matter.
No violations of AEC requirements were identified within the scope of this
insposties.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10. Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document Room.
If this report contains any information that you or your contractore believe
to be proprietary, it is necessary that you make a written application to
this office, within twenty days of your receipt of this letter, to withhold
such information from public disclosure. Any such application must include
a full statement of the reasons for which it is claimed that the informe. tion
is proprietary, and should be prepared so the proprietary information
identified in the applicaties is eostained in a separate part of the doce-
Unless we receive en application to withhold information or are
tent.
otherwise contacted within the specified time period, the written material
identifind in this paragraph will be placed la the Public Document Room.
9102070504 740723
ADDCK 0500g3
0
-_
.
- .
. - .
_
. _ _ _ _ _ _ _ _ _ - _ _ _ _
___ _ ______________ ______ _____ - _ _ _--__ _ _____
_ _ _ _ _ _ _ _ _ _ _ - _
__
e
s
.
-
morthern states rever company
-2-
JUL 2 3 1974
No reply to this letter is necessary; however, should you have any
questices conce pias this inspection, we will be glad to discuss
them with you.<
Sincerely yours,
James C. Keppler
Regional Director
Enclosures
to Inspection Rpt No. 050-183/74-05
bec
RO chief, TC&EB
10 HQ (4)
Licensing (4)
DR Central Files
RO Files
Local FDR
-1
MSIC
,
pygg
OCC, Bath, P-506A
Anthony Roissan, Taq.
__
_