ML20024G096

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Items of Noncompliance Noted in 770614 Notice of Violation
ML20024G096
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/11/1977
From: Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Wachter L
NORTHERN STATES POWER CO.
References
NUDOCS 9102070526
Download: ML20024G096 (2)


Text

'

a-

)l

~

W t'$f e

4.

l AUG 11 G7 Docket No. 50-263 Northern States Power Company ATTH: Mr. Leo Wachter s'

Vice President Power Production and System Operation 414 Nicollet Hall Minneapolis, M 55401 Gentlemen:

This will acknowledge receipt of your letter dated July 7, 1977, infoming us of the steps you have taken to correct the items of noncompliance and other matters which we brought to your attention in our Notice of Violation dated June 14, 1977.

With respect to your July 7 letter, we have the following coments:

1.

You stated tnat the designation of noncompliance item 1.a.

identified as failure to comply with written procedures, should more properly be attributed to inadequate procedures.

While we agree that the adequacy of existing procedures may have contributed to the problems experienced, we believe strict adherence to this procedure would have pre-cluded the repetitive occurrence which resulted in a high flux scram.

2.

Concerning your reply to item 1.b. our citation was not aimed at the correction of the identified procedural intdequacies as you imply. Rather, the citation focused on the initiation of control rod withdrawals without having completed core physics calculations to demonstrate that the conditions which caused the scram no longer exis-ted.

h 9102070526 770B11 PDR ADOCK 05000263 g

G PDR benes e inuinams e Wats >

20LC FORM 318 (9 76) NRCM 0240 W u. s. sovannuswv pamnae e pics. sen.eae.sa4 m

m

._,N,.D.--

,lp f;f o

c i(*,

~

a

  1. UUII C' i

Northern States Power Company -

s We have no questions regarding the corrective actions described in your letter of July 7,1977. Your corrective actions will be examined during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely, Harold D. Thornburg, Director Division of Reactor i

Operations Inspection IE cc:

L. R. Eliason, Plant Manager bec:

Central Files PDR Local PDR

-}

NSIC TIC 1

-~

Anthony Roisman, Esq.,

Attorney EVolgenau, IE JGDavis, IE l

HDThornburg, IE WPEllis, XOOS FIngram, PA o

l JPMurray, ELD JLieberman, ELD 4

MGrossman, ELD DJSkovholt, NRR JCrooks, MIPC RPSnaider, NRR State of Minnesota IE Files

~ Enforcement l

_ Coordinatois - Regions I - V l

EDO Reading L

IE Reading GLConstable, IE ROI Reading ADFC Chron

.(

EGFC2ROI:IE AD%:ROI:IE D:ROI:IE GConstable:L[iJ[O/iezek HDThornburg w,,,,,,,,

_8/fd/77 8/jt/77 8/M/f7 oc mu m

<,.m - -om

  • o......_...._...........

-