ML20024G088
| ML20024G088 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/09/1974 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Wachter L NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20024G089 | List: |
| References | |
| NUDOCS 9102070520 | |
| Download: ML20024G088 (17) | |
See also: IR 05000263/1974002
Text
._
_ _ _ . .
__
_ _ . _ _
. . _ . _ _
__ __.
.-__
m
-
_ . . , _ .
m
_ _ _
_,
.
.
%
- '
r e
g.s
UNITED oT ATEo
.'
e'
ATOMIC ENERGY COMMISSION
i
'
,
9
3
DIRECTOR ATE OF REGULATORY OPERATIONS
o
s/
REGION lil
b s 08
799 ROOSEVELT ROAD
i
,mm
OLEN ELLYN, ILLINOle sol 37
(3t:3ess.aees
e
~
i
APR
'S M
'
Northera States Power Company
Doeket No. 50-143
ATTMs Mr. Lee Weehter, Vice President
Power Fredeetion and System
Operation
414 Nicollet Mall
Minneapolis, W h eta 55401
Gentlansas
This refers to the inspection conducted by heers. P. H. Johnson and H. C.
Dance of this offies en March 5 - 8, 1974, of activities at the Monticello
plant authorised by AEC operating License DPR-22, and to the diacussion of
our findings with Messrs. Neils and Larson and othersof your staff at the
conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas examined during the inspection. Within these areas, the inspection
eessisted of a salestive enem6aaties ei pr h ,and representative
'
'
reeerds, interviews with plant personnel, se1 abeervettees by the inspectore.
During this inspection, it was found that certain of your activities appear
to be in violat. ion of AEC requirements. The item and reference to the
pertiment requirensets are listed under Enforcement Astion in the Summary
of Findings Section of the enclosed inspection report.
This notice is sent to you pursueet to the provisions of Section 2.201 of
the ABC's " Rules of Practies," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within twenty days of
your receipt of this notice, a written statement or explanation in reply,
including:
(1) corrective steps which have been taken by you, and the
results achieved: (2) corrective steps which will be taken to avoid further
violations; and (3) the date when full compliance will be achieved. Such
a statement or explanation should be provided for each of the itens listed,
This inspection included an examination of your corrective actions
associated with items 5.a. 6 and 9.b as described in your letter of
November 10, 1972, in reply to a letter from Regulatory operations Head-
quarters dated October 19, 1972. We have no further questions on these
u.atters at this time.
91020705DO 740409
'
ADOCK 05000263
O
-
._
_
- -_
.
__.
.
.
.
.
l
'
serthern states Fower
-2-
Coupesy
i
In setordance with Section 2.790 of the AEC's Eules of Practice," Fart 2,
Title 10. Code of Federal Regulations, a sepy of this noties, the analosed
inspection report, and your response to this notice will be placed in the
Ar.C's Public Docusant toon.
If this report sentai== asiy information that
you or your contractors believe to be proprietary, it is necassary that you
make a written application to this office, within twsnty days of your receipt
of this notice, to withhold such information from public disclosure.
such application must include a full statement of the reasone for which it
Any
is claimed that the information is proprietary, and should he prepared so
the proprietary information identified in the application is contained in
a separate part of the document.
Unless we receive an application to withhold
information or are otharvise contacted within the specified time period, the
written material iduntified in this peragr*Th will be placed in the Public
l>ocument Roon.
Should you have any questions concerning this inspection, we vill be glad
to discuss then with you.
Sincerely yours,
Jce.'s C. Keppler
.
e, y
Regional Dircetor
Enciesure:
RO Inspection Ept
No. 0 M-263/74-02
cc.
Mr. C. E. Laraoa
Flaat Manager, v/ enc 1
bec:
R0 Chief FS6EB
RO:lly (4)
Licensing (4)
DR Central Files
R0 Files
'
Local PDR
DTIE
OGC,3 eth, P-506A
_
-