Forwards Insp Rept 50-263/75-05 on 750311-14.Noncompliance Noted
ML20024G068
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/21/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wachter L
NORTHERN STATES POWER CO.
Shared Package
ML20024G069 List:
References
NUDOCS 9102070503
Download: ML20024G068 (2)


See also: IR 05000263/1975005

Text

-- -

-

-.

_____ ._ _ . _ _ _ _ _

_ _ _ _ _

_ _ _ _ _ _

_

  • i *

,

UNITED STATE}

.

NUCLEAR REGULATORY COMMISSION

-

u

,

'

,

ntcloN ill

'

,'

799 ROO5EVELT RO AD

GLEN ELLYN. ILLINOl5 6a137

-

APR ( $ i n

.

j

Berthera States /ower Company

Docket No. 50-263

ATTN

Mr. Leo Wachter Vies President

Power Production and System

Operation

-

414 Nicollet Mall

Mirlaapolis, We====ata

55401

Gentlemen:

,

This refers to the inspection conducted by Messrs. Choules and

Jackiw of this office on Marek 11-14, 1975, of activities at

Monticallo Nuclear Generating Plant authorised by NRC Operating

License Mo. DFR-22 and to the discussian of our findings with

Mr. Larson and others of your staff.

A sopy of our report of this inspection is enclosed and identifies the

areas ewaminad during the inspection. Within these areas, the inspection

consisted of a selective examination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

During this insposties, it ses found that eartain of your estivities

.6

appear to be la asasemplianos with Mac sequirensets. ~ The item and

reference to the pertinent requirements are listed under Enforcement

Action in the Summary of Findings Section of the enclosed inspection

report. Prior to the conclusion of the inspection, the inspectors

deternised that eorrective astian had besa taken with respeet to this

item of noncompliance and that measures have been initiated to assure

that a similar, future noncompH-= will be avoided. Consequently, no

reply to thlm letter is required, and we have as further questions

regarding this matter at this tina.

Other infractions identified through your internal audit program or

management controls which were reported as required and for which

corrective actions have been initiated are set out in the Details

section of this report.

In accordance with Section 2.790 e f the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contAias any information that you er your contracters

>

,

d

g

5

m

-

eJ

  1. /76 19N

l

9102070503 750421

PDR

ADDCK 05000263

o

PDR

--

.

- -

. . . - - . -

-

-

- - - . - - .

---

.--

.-.

-

l

<

.

t

1

Northern States Power Company

-2-

APR 2' i 1975

j

1

believe to be preprietary, it is necessary that you make a written

application to this office, within twenty days of your receipt of this

/

'

letter, to withheld such information from public disclosure. Any such

application 'must include a full statement of the reasons for which it is

claimed that the information is proprietary, and should be prepared oc

the proprietary information identified in the appliention is contained

in a separate part of the document. Unless we reesive an application to

withhold information or are otherwise contacted within the specified

tima period, the written material identified in this paragraph will be

placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to disc e s them with you.

Sincerely yours,

Gaston Fiorelli, Chief

Reactor Operations Branch

Encionurst

,/ 1 b.)

13 Inspestian Report Me,

050-263/75-05

bec:

IE Chief, FS&EB

IE:HQ (4)

Licensing (4)

TIR f'entral Filen

IE Files

PDR

Local PDR

NSIC

TIC

OGC, Beth, P-506A

Anthony Roisman, Esq.

'