Text
- - - - -
- _ .
i*
.-
,
Docket Hos. 50-313/90-42
DEC 2 01990
50-368/90-42
Entergy Operations, Inc.
ATTN:
Mr. Neil S. Carns, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
Russellville, Arkansas 72801
Gentlemen:
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT N0. 50-313/90-42;
50-368/90-42)
This refers to the inspection conducted by Messrs. C. C. Warren, A. Singh, and
N. Terc, and Ms. L. J, Smith, of this office October 17 through December 7,
1990.
The inspection included a review of activities authorized for your
Arkansas Nuclaar One, Units 1 and 2, facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Included
are onsite event followup, operational safety verification, surveillance,
maintenance, modification installation, outage activities, review of previous
4
inspection findings, and followup of licensee action on licensee event
i
reports (LERs).
Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
and observations of activities in progress.
Based on the results of this inspection, certain of your activities appeared to
be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
We are concerned about the violation because an inadequate
review of the safety evaluation for conducting resin transfer cask dewatering
activities in the train bay lef t the unit vulnerable to an unmonitored offsite
release during a recent resin fine spill.
Failure to perform an adequate
safety review is a violation of Technical Specification (TS) requirements.
A
similar violation was issued in the previous resident inspection report.
You
were fortunate that the lineup of air-handling units and the prevailing wind
patterns led to the containment of the resin fines.
This citation is being
issued because the inadequate review was not discovered prior to the
consequences occurrina.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to thic
l
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
hdIV:R
SRI @ b
PE:DRP
RIV: RI/k
RIV: EPA 4
-
h
CCWarren
MASatohus
f
LJSmi th
A$ingh
4 //y/90
/p//7 /9014 {NTerck/g/90/> /N/90
4 p/
/90
M
C:DRP/A N,
D:
P
TFWesteeman
JCoffins
p //f /90
/gb /9
)
/go
,
9012270154 901220
F
I
i
ADOCK 05000313
I
O
!
~_
_
1
..
,
Entergy Operations, Inc.
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The response directed by this letter and the enclosed Notice are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By:
Samuel J. Collins
Samuel J. Collins, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/90-42
50-368/90-42
3.
Appendix C - Quarterly Pla1t Performance
Review Outline
Entergy Operations, Inc.
ATTN:
Donald C. Hintz, Executive Vice
President & Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi
39286
Entergy Operations, Inc.
ATTN:
Gerald W. Muench, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi
39286
I
Wise, Carter, Child & Caraway
ATTN:
Robert B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi
39205
Arkansas Nuclear One
,
l
ATTN:
Early Ewing, General Manager
l
Technical Support and Assessment
Route 3, Box 137G
l
Russellville, Arkansas 72801
..
.
~..
.
- - -
.
~ _
. . = _ =
.
..
,
Entergy Operations, Inc.
3
Arkansas Nuclear.0ne
ATTN:
Jerry Yelverton, Director
Nuclear.0perations
Route 3, Box 137G
-Russellville, Arkansas 72801
Arkansas Nuclear One
ATTN:
.Mr. Tom W. Nickels
Route 3, Box 137G
'Russellville, Arkansas 72801
Combustion Engineering, Inc.
ATTN: -Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852-
Honorable Joe W. Phillips
' County Judge of Pope County
= Pope County Courthouse
,
Russellville,' Arkansas 72801
- Winston & Strawn
[
ATTN:
Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502'
t
brkansas' Department of Health
-ATTN:
=Ms. Greta Dicus, Director
Division of Environmental Health
Protection
4815 West-Markam Street
Little Rock,: Arkansas 72201
Babcock & Wilcox
Nuclear Power Generation Division
E
ATTN:
Mr.1 Robert B. Borsum
L
1700 Rockville Pike, Suit'e 525
Rockville, Maryland 20852
- Admiral Kinnaird R. .McKee, USN (Ret)
P.O.. Box 41
Oxford, Maryland 21654
L
l
l
1
-
.
,
,.
,
.-.
-
-
.
-
--
.
_ _ _
_ _ .
. . -
.:
' Entergy Operations, Inc.
4
bec to DMB.(IE01)-
bec distrib. by RIV:
- *R. D. Martin
- Resident Inspector
' *DRSS-RPEPS
- Section Chief (DRP/A)
Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer (DRP/A)
- DRS
- T. Alexion, NRR Project Manager (MS:
13-E-21)
- C.- Poslusny, NRR Project Manager (MS:
13-D-18)-
- w/766
s