Forwards Insp Repts 50-313/90-42 & 50-368/90-42 on 901017-1207 & Notice of Violation
ML20024F919
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/20/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ENTERGY OPERATIONS, INC.
Shared Package
ML20024F920 List:
References
NUDOCS 9012270154
Download: ML20024F919 (4)


See also: IR 05000313/1990042

Text

- - - - -

- _ .

i*

.-

,

Docket Hos. 50-313/90-42

DEC 2 01990

50-368/90-42

License Nos. DPR-51 and NPF-6

Entergy Operations, Inc.

ATTN:

Mr. Neil S. Carns, Vice President

Operations, Arkansas Nuclear One

Route 3, Box 137G

Russellville, Arkansas 72801

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT N0. 50-313/90-42;

50-368/90-42)

This refers to the inspection conducted by Messrs. C. C. Warren, A. Singh, and

N. Terc, and Ms. L. J, Smith, of this office October 17 through December 7,

1990.

The inspection included a review of activities authorized for your

Arkansas Nuclaar One, Units 1 and 2, facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Included

are onsite event followup, operational safety verification, surveillance,

maintenance, modification installation, outage activities, review of previous

4

inspection findings, and followup of licensee action on licensee event

i

reports (LERs).

Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel,

and observations of activities in progress.

Based on the results of this inspection, certain of your activities appeared to

be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

We are concerned about the violation because an inadequate

review of the safety evaluation for conducting resin transfer cask dewatering

activities in the train bay lef t the unit vulnerable to an unmonitored offsite

release during a recent resin fine spill.

Failure to perform an adequate

safety review is a violation of Technical Specification (TS) requirements.

A

similar violation was issued in the previous resident inspection report.

You

were fortunate that the lineup of air-handling units and the prevailing wind

patterns led to the containment of the resin fines.

This citation is being

issued because the inadequate review was not discovered prior to the

consequences occurrina.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

After reviewing your response to thic

l

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

hdIV:R

SRI @ b

PE:DRP

RIV: RI/k

RIV: EPA 4

-

h

CCWarren

MASatohus

f

LJSmi th

A$ingh

4 //y/90

/p//7 /9014 {NTerck/g/90/> /N/90

4 p/

/90

M

C:DRP/A N,

D:

P

TFWesteeman

JCoffins

p //f /90

/gb /9

)

/go

,

9012270154 901220

F

I

i

PDR

ADOCK 05000313

I

O

PDR

!

~_

_

1

..

,

Entergy Operations, Inc.

2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The response directed by this letter and the enclosed Notice are not subject to

the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By:

Samuel J. Collins

Samuel J. Collins, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-313/90-42

50-368/90-42

3.

Appendix C - Quarterly Pla1t Performance

Review Outline

Entergy Operations, Inc.

ATTN:

Donald C. Hintz, Executive Vice

President & Chief Operating Officer

P.O. Box 31995

Jackson, Mississippi

39286

Entergy Operations, Inc.

ATTN:

Gerald W. Muench, Vice President

Operations Support

P.O. Box 31995

Jackson, Mississippi

39286

I

Wise, Carter, Child & Caraway

ATTN:

Robert B. McGehee, Esq.

P.O. Box 651

Jackson, Mississippi

39205

Arkansas Nuclear One

,

l

ATTN:

Early Ewing, General Manager

l

Technical Support and Assessment

Route 3, Box 137G

l

Russellville, Arkansas 72801

..

.

~..

.

- - -

.

~ _

. . = _ =

.

..

,

Entergy Operations, Inc.

3

Arkansas Nuclear.0ne

ATTN:

Jerry Yelverton, Director

Nuclear.0perations

Route 3, Box 137G

-Russellville, Arkansas 72801

Arkansas Nuclear One

ATTN:

.Mr. Tom W. Nickels

Route 3, Box 137G

'Russellville, Arkansas 72801

Combustion Engineering, Inc.

ATTN: -Charles B. Brinkman, Manager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852-

Honorable Joe W. Phillips

' County Judge of Pope County

= Pope County Courthouse

,

Russellville,' Arkansas 72801

Winston & Strawn

[

ATTN:

Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

Washington, D.C.

20005-3502'

t

brkansas' Department of Health

-ATTN:

=Ms. Greta Dicus, Director

Division of Environmental Health

Protection

4815 West-Markam Street

Little Rock,: Arkansas 72201

Babcock & Wilcox

Nuclear Power Generation Division

E

ATTN:

Mr.1 Robert B. Borsum

L

1700 Rockville Pike, Suit'e 525

Rockville, Maryland 20852

- Admiral Kinnaird R. .McKee, USN (Ret)

P.O.. Box 41

Oxford, Maryland 21654

L

l

l

1

-

.

,

,.

,

.-.

-

-

.

-

--

.

_ _ _

_ _ .

. . -

.:

' Entergy Operations, Inc.

4

bec to DMB.(IE01)-

bec distrib. by RIV:

- *R. D. Martin

  • Resident Inspector

' *DRSS-RPEPS

  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer (DRP/A)
  • DRS
  • T. Alexion, NRR Project Manager (MS:

13-E-21)

  • C.- Poslusny, NRR Project Manager (MS:

13-D-18)-

  • w/766

s